본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Semiconductor Manufacturing Facility Project

    Period
    1999.12~2001.07
    Scale
    Air Flow Top to Bottom Clean Class 1,000 / Cleanroom area 8,776 m2 Other area 2,070 ㎡ / Structure Steel Beam(P.E.B) Promoter : Amkor Technology Korea Inc. Period : 99. 12 ~ 01. 07
    더보기

Semiconductor Manufacturing Facility Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gwangju
· Period 1999.12~2001.07
· Scale Air Flow Top to Bottom Clean Class 1,000 / Cleanroom area 8,776 m2 Other area 2,070 ㎡ / Structure Steel Beam(P.E.B) Promoter : Amkor Technology Korea Inc. Period : 99. 12 ~ 01. 07