BUSINESS Business Performance

  • USA Magnolia LNG project

    Order
    Magnolia LNG
    Period
    2016.03~2020.03
    Perform Form
    EPC
    더보기

    FORT HILLS SE Project (FHSE)

    Order
    SUNCOR
    Period
    2014.04~2017.06
    Perform Form
    EPC
    더보기

    Esmeraldas O&M Service Project

    Order
    EPP
    Period
    2011.05~2014.04
    Perform Form
    EPC
  • Esmeraldas Refinery Phase II Project

    Order
    EPP
    Period
    2010.03~2013.03
    Perform Form
    EPC

    CNC Air Separation Unit #5 Project

    Work Scope
    300 MMSCFD
    Order
    CNC(Mexico )
    Period
    2004.06~2006.09
    Scale
    300 MMSCFD
    Perform Form
    ED,PR,CN

    Madero Refinery Reconfiguration Project

    Work Scope
    Steam Turbine:32 x 2 MW
    Order
    PEMEX Refinacion(Petroleos Mexicanos), Mexico
    Period
    1999.03~2002.10
    Scale
    Steam Turbine:32 x 2 MW * New Plants 10 Units - Combined 100% Maya Plant 137,000 BPSD - Delayed Coker Plant 50,000 BPSD - DEA Treatment System 34,280 BPSD - Sour Water Treatment Unit 10,000 BPSD - Gas Oil HDS Plant 49,700 BPSD - Hydrogen Sweetening Unit 1,052 kg/h - Alkylation Plant 9,300 BPSD - MTBE Plant 2,600 BPSD - TAME Plant 2,600 BPSD - Hydrogen Plant U-801 42 MMSCFD - Sulfur Recovery Plant 600 T/D - Naphtha Reformer Plant U-901 10,000 BPSD - Fluidized Catalytic Cracking No. 2 Plant 30,500 BPSD * Modernization - Coker Naphtha Treatement Plant 12,000 BPSD - Combined BA Plant 40,000 BPSD - Fluidized Catalytic Cracking No. 1 Plant 30,000 BPSD - Combined MF Plant 13,000 BPSD - Turbosene HDS Plant U-500 15,000 BPSD - Kerosene / Diesel HDS Plant U-501 25,000 BPSD - Integration of CH Hydrocarbon Plant 58 Ton/h * Tankage and Integration
    Perform Form
    EPC LSTK+ Financing
    더보기
  • Madero Refinery Project

    Order
    PEMEX (Madero, Mexico)
    Period
    1999.02~2002.10
    Scale
    Crude & Vax. Unit 137,000BPSD Delayed Coker 50,000BPSD HDDS Plant 49,700BPSD Alkylation Plant 9,300BPSD Sour Water Treatment 10,000BPSD MTBE Plant 100,000BPSD TAME Plant 100,000BPSD
    Perform Form
    EPC
    더보기

    RFCC Revamping Project

    Work Scope
    35,000 BPSD
    Order
    Ecopetrol(Empresa Colombiana de petroleos), Colombia
    Period
    1997.12~1999.09
    Scale
    Revamping of 29,000 BPSD to 35,000 BPSD Gas Compression and absorption section Reactor and regeneration/fractionation section Licensor UOP Consultant Interventoria
    Perform Form
    EPC LSTK
    더보기

    RFCC Revamping Project

    Work Scope
    35,000 BPSD
    Order
    Ecopetrol(Empresa Colombiana de petroleos), Colombia
    Period
    1997.12~1999.09
    Scale
    Revamping of 29,000 BPSD to 35,000 BPSD Gas Compression and absorption section Reactor and regeneration/fractionation section Licensor UOP Consultant Interventoria
    Perform Form
    EPC LSTK
  • RFCC Revamping Project

    Work Scope
    19,000 BPSD
    Order
    Ecopetrol(Empresa Colombiana de petroleos), Colombia
    Period
    1997.12~1999.09
    Scale
    Revamping of 29,000 BPSD to 35,000 BPSD Gas Compression and absorption section Reactor and regeneration/fractionation section Licensor UOP Consultant Interventoria
    Perform Form
    EPC LSTK
    더보기

    Cadereyta Refinery Reconfiguration Project

    Order
    PEMEX Refinacion(Petroleos Mexicanos), Mexico
    Period
    1997.11~2001.04
    Scale
    * New Plants - Hydrotreating Plant for Coker Gas Oils (40,000 BPSD) - MTBE Plant No.2 (2,000 BPSD) - Hydrogen Plant (60MMSCFD) - Alkylation Plant No.2 with Load Preparer (5,000 BPSD) - Sulfur Recovery Plant No.4 (480 MTD) - Naphtha Reformer Plant No. with CCR (26,000 BPSD) - Naphtha Hydrodesulfurization Plant No.2 (25,000 BPSD) - Hydrodesulfurization of Intermediate Distilled Products - Plant No.3 (35,000 BPSD) - Sour Water Stripping Plant No.7 and No.8 (20,316 BPSD) - Sour Water Exhaust System No.4 (10,000 BPSD) * Upgrade & Modernization - Expansion and Upgrade Catalytic Plant No.1   - Expansion and Upgrade of the Combined Plant No.1   - Expansion and Upgrade of the Combined Plant No.2   - Expansion and Upgrade of the Lights Fractionation Plant - Upgrade of Naphtha Hydrodesulfurization Plant No.1   - Naphtha Reformer Plant No.1   - Upgrade of Hydrodesulfurization of Intermediate Distilled Products Plant No.1 - Upgrade of Hydrodesulfurization of Intermediate Distilled Products Plant No.2 - Upgrade of The Sulfur Recuperator Plant No.1 including Oil Gas Treatment Section - Integral Information System of The Refinery (Study & Equipment) - Expansion of Central laboratory and Instrument Calibration Laboratory   * Tankage & integration
    Perform Form
    EPC LSTK+ Financing
    더보기

    Long Distance Pipeline for Cadereyta Refinery Complex

    Order
    Cadereyta, (Mexico)
    Period
    1997.11~2000.06
    Scale
    Capacity : - Crude Oil 24"" Dia x 1,022 km, - Product 12"" Dia x 473 km
    Perform Form
    LSTK

USA Magnolia LNG project

The Business Performance details view. can you check Work Scope, Order, Period
· Order Magnolia LNG
· Period 2016.03~2020.03
· Perform Form EPC

FORT HILLS SE Project (FHSE)

The Business Performance details view. can you check Work Scope, Order, Period
· Order SUNCOR
· Period 2014.04~2017.06
· Perform Form EPC

Esmeraldas O&M Service Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ecuador
· Order EPP
· Period 2011.05~2014.04
· Perform Form EPC

Esmeraldas Refinery Phase II Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ecuador
· Order EPP
· Period 2010.03~2013.03
· Perform Form EPC

CNC Air Separation Unit #5 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Mexico
· Work Scope 300 MMSCFD
· Order CNC(Mexico )
· Period 2004.06~2006.09
· Scale 300 MMSCFD
· Perform Form ED,PR,CN

Madero Refinery Reconfiguration Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Madero, Mexico
· Work Scope Steam Turbine:32 x 2 MW
· Order PEMEX Refinacion(Petroleos Mexicanos), Mexico
· Period 1999.03~2002.10
· Scale Steam Turbine:32 x 2 MW * New Plants 10 Units - Combined 100% Maya Plant 137,000 BPSD - Delayed Coker Plant 50,000 BPSD - DEA Treatment System 34,280 BPSD - Sour Water Treatment Unit 10,000 BPSD - Gas Oil HDS Plant 49,700 BPSD - Hydrogen Sweetening Unit 1,052 kg/h - Alkylation Plant 9,300 BPSD - MTBE Plant 2,600 BPSD - TAME Plant 2,600 BPSD - Hydrogen Plant U-801 42 MMSCFD - Sulfur Recovery Plant 600 T/D - Naphtha Reformer Plant U-901 10,000 BPSD - Fluidized Catalytic Cracking No. 2 Plant 30,500 BPSD * Modernization - Coker Naphtha Treatement Plant 12,000 BPSD - Combined BA Plant 40,000 BPSD - Fluidized Catalytic Cracking No. 1 Plant 30,000 BPSD - Combined MF Plant 13,000 BPSD - Turbosene HDS Plant U-500 15,000 BPSD - Kerosene / Diesel HDS Plant U-501 25,000 BPSD - Integration of CH Hydrocarbon Plant 58 Ton/h * Tankage and Integration
· Perform Form EPC LSTK+ Financing

Madero Refinery Project

The Business Performance details view. can you check Work Scope, Order, Period
· Order PEMEX (Madero, Mexico)
· Period 1999.02~2002.10
· Scale Crude & Vax. Unit 137,000BPSD Delayed Coker 50,000BPSD HDDS Plant 49,700BPSD Alkylation Plant 9,300BPSD Sour Water Treatment 10,000BPSD MTBE Plant 100,000BPSD TAME Plant 100,000BPSD
· Perform Form EPC

RFCC Revamping Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Cartagena, Colombia
· Work Scope 35,000 BPSD
· Order Ecopetrol(Empresa Colombiana de petroleos), Colombia
· Period 1997.12~1999.09
· Scale Revamping of 29,000 BPSD to 35,000 BPSD Gas Compression and absorption section Reactor and regeneration/fractionation section Licensor UOP Consultant Interventoria
· Perform Form EPC LSTK

RFCC Revamping Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Cartagena, Colombia
· Work Scope 35,000 BPSD
· Order Ecopetrol(Empresa Colombiana de petroleos), Colombia
· Period 1997.12~1999.09
· Scale Revamping of 29,000 BPSD to 35,000 BPSD Gas Compression and absorption section Reactor and regeneration/fractionation section Licensor UOP Consultant Interventoria
· Perform Form EPC LSTK

RFCC Revamping Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Cartagena, Colombia
· Work Scope 19,000 BPSD
· Order Ecopetrol(Empresa Colombiana de petroleos), Colombia
· Period 1997.12~1999.09
· Scale Revamping of 29,000 BPSD to 35,000 BPSD Gas Compression and absorption section Reactor and regeneration/fractionation section Licensor UOP Consultant Interventoria
· Perform Form EPC LSTK

Cadereyta Refinery Reconfiguration Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Cadereyta, Mexico
· Order PEMEX Refinacion(Petroleos Mexicanos), Mexico
· Period 1997.11~2001.04
· Scale * New Plants - Hydrotreating Plant for Coker Gas Oils (40,000 BPSD) - MTBE Plant No.2 (2,000 BPSD) - Hydrogen Plant (60MMSCFD) - Alkylation Plant No.2 with Load Preparer (5,000 BPSD) - Sulfur Recovery Plant No.4 (480 MTD) - Naphtha Reformer Plant No. with CCR (26,000 BPSD) - Naphtha Hydrodesulfurization Plant No.2 (25,000 BPSD) - Hydrodesulfurization of Intermediate Distilled Products - Plant No.3 (35,000 BPSD) - Sour Water Stripping Plant No.7 and No.8 (20,316 BPSD) - Sour Water Exhaust System No.4 (10,000 BPSD) * Upgrade & Modernization - Expansion and Upgrade Catalytic Plant No.1   - Expansion and Upgrade of the Combined Plant No.1   - Expansion and Upgrade of the Combined Plant No.2   - Expansion and Upgrade of the Lights Fractionation Plant - Upgrade of Naphtha Hydrodesulfurization Plant No.1   - Naphtha Reformer Plant No.1   - Upgrade of Hydrodesulfurization of Intermediate Distilled Products Plant No.1 - Upgrade of Hydrodesulfurization of Intermediate Distilled Products Plant No.2 - Upgrade of The Sulfur Recuperator Plant No.1 including Oil Gas Treatment Section - Integral Information System of The Refinery (Study & Equipment) - Expansion of Central laboratory and Instrument Calibration Laboratory   * Tankage & integration
· Perform Form EPC LSTK+ Financing

Long Distance Pipeline for Cadereyta Refinery Complex

The Business Performance details view. can you check Work Scope, Order, Period
· Order Cadereyta, (Mexico)
· Period 1997.11~2000.06
· Scale Capacity : - Crude Oil 24"" Dia x 1,022 km, - Product 12"" Dia x 473 km
· Perform Form LSTK