본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • BLS&VRU Installation Outsourcing (Seoul/Deagu)

    Order
    SK Corp.
    Period
    2003.11~2004.11

    Pyungtak LPG Storage Facility Project

    Order
    SK Gas Co.
    Period
    1996.09~1999.03
    Scale
    Tank and Cavern Terminal Propane 300,000 m3(Cavern) Butane 35,000 m3 x 2 Units(DRT) Jetty 70,000 DWT with Loading and Unloading System Underground Pipeline 4 Km Refrigerating System Truck Loading System
    더보기

    Gas Pipeline Works for East Suwon District Heating Project(block3)

    Work Scope
    Capacity : - 28" Dia x 57.7 km
    Order
    Korea District Heating Corp.
    Period
    1994.11~1998.06
    Scale
    Capacity : - 28" Dia x 57.7 km
    Perform Form
    ED,PR,CN
  • Gas Pipeline Works for East Suwon District Heating Project(block2)

    Work Scope
    Capacity : - 28" Dia x 3.4 km
    Order
    Korea District Heating Corp.
    Period
    1994.05~1998.12
    Scale
    Capacity : - 28" Dia x 3.4 km
    Perform Form
    ED,PR,CN

    Oil Pipeline Project for Kyungin Energy Corp.

    Work Scope
    Capacity : - 30" Dia x 2.
    Order
    Kyungin Energy (Korea)
    Period
    1993.07~1994.01
    Scale
    v
    Perform Form
    LSTK

    30 Crude Oil Pipeline Project

    Work Scope
    Capacity : 30
    Order
    Kyungin Energy (Korea)
    Period
    1993.02~1994.06
    Scale
    Capacity : 30
    Perform Form
    CN
  • Incheon LPG Storage Facility Construction

    Work Scope
    Ball Tank :
    Order
    SK Corp.
    Period
    1983.04~1984.01
    Scale
    10,000 bbl Tank 3ea, 15,000 bbl Tank 2ea 30,000 bbl Tank 3ea, 25,000 bbl Tank 2ea Piping 1,440 Tons, LPG Station
    Perform Form
    EPC LSTK
    더보기

    Inchon LPG Storage Facility

    Order
    SK Gas, Korea
    Period
    1983.04~1984.01
    Perform Form
    EPC LSTK

    Incheon CLX Project

BLS&VRU Installation Outsourcing (Seoul/Deagu)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Seoul/Deagu
· Order SK Corp.
· Period 2003.11~2004.11

Pyungtak LPG Storage Facility Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Pyungtak-si, Gyeonggi
· Order SK Gas Co.
· Period 1996.09~1999.03
· Scale Tank and Cavern Terminal Propane 300,000 m3(Cavern) Butane 35,000 m3 x 2 Units(DRT) Jetty 70,000 DWT with Loading and Unloading System Underground Pipeline 4 Km Refrigerating System Truck Loading System

Gas Pipeline Works for East Suwon District Heating Project(block3)

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope Capacity : - 28" Dia x 57.7 km
· Order Korea District Heating Corp.
· Period 1994.11~1998.06
· Scale Capacity : - 28" Dia x 57.7 km
· Perform Form ED,PR,CN

Gas Pipeline Works for East Suwon District Heating Project(block2)

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope Capacity : - 28" Dia x 3.4 km
· Order Korea District Heating Corp.
· Period 1994.05~1998.12
· Scale Capacity : - 28" Dia x 3.4 km
· Perform Form ED,PR,CN

Oil Pipeline Project for Kyungin Energy Corp.

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope Capacity : - 30" Dia x 2.
· Order Kyungin Energy (Korea)
· Period 1993.07~1994.01
· Scale v
· Perform Form LSTK

30 Crude Oil Pipeline Project

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope Capacity : 30
· Order Kyungin Energy (Korea)
· Period 1993.02~1994.06
· Scale Capacity : 30
· Perform Form CN

Incheon LPG Storage Facility Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Incheon
· Work Scope Ball Tank :
· Order SK Corp.
· Period 1983.04~1984.01
· Scale 10,000 bbl Tank 3ea, 15,000 bbl Tank 2ea 30,000 bbl Tank 3ea, 25,000 bbl Tank 2ea Piping 1,440 Tons, LPG Station
· Perform Form EPC LSTK

Inchon LPG Storage Facility

The Business Performance details view. can you check Work Scope, Order, Period
· Order SK Gas, Korea
· Period 1983.04~1984.01
· Perform Form EPC LSTK

Incheon CLX Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Incheon-si, Korea