본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Construction of the service area of the Okcheon Rest Area

    Period
    2011.09~2012.07
    Scale
    Various public amenities. Rest area bldg., gas station, repair shop Total area: 3,540.73m2
    더보기

    South Daejeon truck stop

    Period
    2010.11~2011.07
    Scale
    Management bldg., maintenance bldg. (trucks and passenger cars), automatic car wash, LNG refueling station (office bldg.), gas station bldg. Total area: 2,639.03m2
    더보기

    Construction of the Daejeon CT Center

    Period
    2009.06~2010.10
    Scale
    Four-story bldg. with 2 floors below ground Total area: 17,129.8m2
    더보기
  • Construction of the Funeral Culture Center

    Period
    2007.12~2009.10
    Scale
    Funeral hall: 3-story bldg. with one floor below ground Crematorium: 2-story bldg. with one floor below ground Management/PR bldg.: 2-story bldg. Charnel house: 2-story bldg. with one floor below ground Place for scattering the ashes: Single-story bldg. Total area: 17,153.3m2
    더보기

    Pentaport Asan Baebang Complex Development

    Period
    2007.03~2011.12
    Scale
    Block 1 : 2 Basements and 41/45 Floors(153,559㎡), Residence, Neighborhood Unit Block 3: 5 Basements and 66 Floors(235,146㎡), Residence, Neighborhood Unit, Sales, etc. Block 4: 7 Basements and 51 Floors(94,565㎡), Business, Neighborhood Unit, Sales, etc. Block 8: 6 Basements and 8 Floors(81,761㎡), Sales (Department Store) Gross Area: 565,031㎡
    더보기

    SK Institute of Tech. Lab D Block Expansion Project

    Order
    SK Corporation
    Period
    2006.08~2007.08
    Scale
    1 Lab of 4 Floors and 1 Basement Gross Area: 7,322㎡
    더보기
  • Nhoeun SK HUB

    Order
    Thezone E&C co.
    Period
    2003.12~2006.02
    Scale
    - 1 Residential Complex of 3 Basements ~ 15 Floors (Apartments are located from 3rd fl. to 15th fl.) - 34,45pyung, 182units
    더보기

    SK Telecom Building in Deajeon

    Order
    SK Telecom
    Period
    2003.03~2004.12
    Scale
    20 Floors, 5 Basements

    ICU Dorm Construction

    Period
    2003.01~2004.02
    Scale
    4 Floors, 1 Basement
  • Deaduk Technology Institutions External Wall Renovation

    Period
    2002.10~2003.05
    Scale
    Remodeling 3 Lab Buildings, Administrational Building, Welfare Building (total 5 buildings)
    더보기

    SK C&C Lab Construction

    Period
    2000.11~2001.12
    Scale
    4 Floors and 1 Baswement

    Jeungsando Training Center

    Period
    1999.11~2002.05
    Scale
    Auditorium, Office Block, Lodge and Gwangjaegook - 4 buildings
    더보기

Construction of the service area of the Okcheon Rest Area

The Business Performance details view. can you check Work Scope, Order, Period
· Location 122-11 and 27 lots, and 123-1, Samyang-ri, Okcheon-eup, Okcheon-gun, Northern Chungcheong-do 4 lots
· Period 2011.09~2012.07
· Scale Various public amenities. Rest area bldg., gas station, repair shop Total area: 3,540.73m2

South Daejeon truck stop

The Business Performance details view. can you check Work Scope, Order, Period
· Location (300-300) 313-5, Guro-dong, Dong-gu, Daejeon
· Period 2010.11~2011.07
· Scale Management bldg., maintenance bldg. (trucks and passenger cars), automatic car wash, LNG refueling station (office bldg.), gas station bldg. Total area: 2,639.03m2

Construction of the Daejeon CT Center

The Business Performance details view. can you check Work Scope, Order, Period
· Location Inside the Expo Science park, 3-1, Doryong-dong, Yuseong-gu, Daejeon
· Period 2009.06~2010.10
· Scale Four-story bldg. with 2 floors below ground Total area: 17,129.8m2

Construction of the Funeral Culture Center

The Business Performance details view. can you check Work Scope, Order, Period
· Location 426, Gojeong-ri, Nam-myeon, Yeongi-gun, Southern Chungcheong-do
· Period 2007.12~2009.10
· Scale Funeral hall: 3-story bldg. with one floor below ground Crematorium: 2-story bldg. with one floor below ground Management/PR bldg.: 2-story bldg. Charnel house: 2-story bldg. with one floor below ground Place for scattering the ashes: Single-story bldg. Total area: 17,153.3m2

Pentaport Asan Baebang Complex Development

The Business Performance details view. can you check Work Scope, Order, Period
· Location 1, 3, 4, 8 Comercial block, Housing development zone, Baebang-myeon, Asan-si, Chungcheongnam-do
· Period 2007.03~2011.12
· Scale Block 1 : 2 Basements and 41/45 Floors(153,559㎡), Residence, Neighborhood Unit Block 3: 5 Basements and 66 Floors(235,146㎡), Residence, Neighborhood Unit, Sales, etc. Block 4: 7 Basements and 51 Floors(94,565㎡), Business, Neighborhood Unit, Sales, etc. Block 8: 6 Basements and 8 Floors(81,761㎡), Sales (Department Store) Gross Area: 565,031㎡

SK Institute of Tech. Lab D Block Expansion Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK R Center, 140-1, Wonchon-dong, Yuseong-gu, Daejeon
· Order SK Corporation
· Period 2006.08~2007.08
· Scale 1 Lab of 4 Floors and 1 Basement Gross Area: 7,322㎡

Nhoeun SK HUB

The Business Performance details view. can you check Work Scope, Order, Period
· Location 894-5,6, Jijok-dong, Yoosung-gu, Daejeon
· Order Thezone E&C co.
· Period 2003.12~2006.02
· Scale - 1 Residential Complex of 3 Basements ~ 15 Floors (Apartments are located from 3rd fl. to 15th fl.) - 34,45pyung, 182units

SK Telecom Building in Deajeon

The Business Performance details view. can you check Work Scope, Order, Period
· Location 594, Tanbang-dong, Seo-gu, Deajeon
· Order SK Telecom
· Period 2003.03~2004.12
· Scale 20 Floors, 5 Basements

ICU Dorm Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location ICU 119, Monji-ro, Yusung-gu, Daejeon
· Period 2003.01~2004.02
· Scale 4 Floors, 1 Basement

Deaduk Technology Institutions External Wall Renovation

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK Deaduk Tech Institution, Wonchon-dong, Yusung-gu, Daejeon
· Period 2002.10~2003.05
· Scale Remodeling 3 Lab Buildings, Administrational Building, Welfare Building (total 5 buildings)

SK C&C Lab Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Junmin-dong, Yusung-gu, Deajeon
· Period 2000.11~2001.12
· Scale 4 Floors and 1 Baswement

Jeungsando Training Center

The Business Performance details view. can you check Work Scope, Order, Period
· Location 409-1,3,4, Jungri-dong, Deaduk-gu, Deajeon
· Period 1999.11~2002.05
· Scale Auditorium, Office Block, Lodge and Gwangjaegook - 4 buildings