본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • SK Corporate Pavilion, Expo 2012 Yeosu Korea

    Period
    2011.10~2012.04
    Scale
    34m x 43m (19.95m high) Total area: 2,211.71m2
    더보기

    Electric works for the Mokpo-Jangheung section of National expressway No. 10 (section 3)

    Period
    2010.12~2012.03
    Scale
    ■ Total length 13.78Km ■ Electric work for exits: 1 location [Jangheung exit] ■ CCTV street lamp electric work: 1 location ■ Electric work for tunnels: 6 locations [Gangjin 1 tunnel, Gangjin 2 tunnel, Gangjin 3 tunnel, Jangheung 1 tunnel, Jangheung 2 tunnel, Jangheung 3 tunnel] ■ Electric work for offices: 1 location [Jangheung office] ■ Electric work for temporary service areas: 1 location [Jangheung temporary service area]
    더보기

    Construction of the National Naju Museum

    Period
    2010.01~2013.01
    Scale
    Single-story bldg. with 2 floors below ground Total area: 11,086.34m2
    더보기
  • Junbuk Regional Police Office

    Order
    Public Procurement Service
    Period
    2000.10~2003.08
    Scale
    Gross Area 6,493 Pyung 1 Basement, 7 Floors Reinforced Concrete (Partly SRC)
    더보기

    Pharmacy College and Two Other Buildings and Entrance of Josun Univ. Construction

    Period
    1999.08~2000.10
    Scale
    1 Basement and 4 Floors
    더보기

    Gwangju Hwani Departmentstore

    Period
    1995.03~1997.11
    Scale
    6 Basements and 9 Floors
    더보기
  • Goryeo Shopping Park

    Period
    1993.08~1995.06
    Scale
    4 Basements and 12 Flooers
    더보기

SK Corporate Pavilion, Expo 2012 Yeosu Korea

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK Corporate Pavilion, Expo 2012 Yeosu Korea, 351-1, Deokchung-dong, Yeosu, Southern Jeolla-do
· Period 2011.10~2012.04
· Scale 34m x 43m (19.95m high) Total area: 2,211.71m2

Electric works for the Mokpo-Jangheung section of National expressway No. 10 (section 3)

The Business Performance details view. can you check Work Scope, Order, Period
· Location (529-811) Buchun-ri, Busan-myeon, Jangheung-gun, Southern Jeolla Province
· Period 2010.12~2012.03
· Scale ■ Total length 13.78Km ■ Electric work for exits: 1 location [Jangheung exit] ■ CCTV street lamp electric work: 1 location ■ Electric work for tunnels: 6 locations [Gangjin 1 tunnel, Gangjin 2 tunnel, Gangjin 3 tunnel, Jangheung 1 tunnel, Jangheung 2 tunnel, Jangheung 3 tunnel] ■ Electric work for offices: 1 location [Jangheung office] ■ Electric work for temporary service areas: 1 location [Jangheung temporary service area]

Construction of the National Naju Museum

The Business Performance details view. can you check Work Scope, Order, Period
· Location (520-922) Sinchon-ri, Bannam-myeon, Naju, Southern Jeolla-do
· Period 2010.01~2013.01
· Scale Single-story bldg. with 2 floors below ground Total area: 11,086.34m2

Junbuk Regional Police Office

The Business Performance details view. can you check Work Scope, Order, Period
· Location area near 431-6, Yoja-dong 3ga, Wansan-gu, Junju-si-, Junbuk
· Order Public Procurement Service
· Period 2000.10~2003.08
· Scale Gross Area 6,493 Pyung 1 Basement, 7 Floors Reinforced Concrete (Partly SRC)

Pharmacy College and Two Other Buildings and Entrance of Josun Univ. Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 375, Seoseok-dong, Dong-gu, Gwangju
· Period 1999.08~2000.10
· Scale 1 Basement and 4 Floors

Gwangju Hwani Departmentstore

The Business Performance details view. can you check Work Scope, Order, Period
· Location 1284-2, Juwal-dong, Nam-gu, Gwangju-si and 7 Pilji
· Period 1995.03~1997.11
· Scale 6 Basements and 9 Floors

Goryeo Shopping Park

The Business Performance details view. can you check Work Scope, Order, Period
· Location 216, Yeoseo-dong, Yeosu-si, Junnam
· Period 1993.08~1995.06
· Scale 4 Basements and 12 Flooers