BUSINESS Business Performance

  • Sihwa MTV Seohaean Detour Road Construction Project

    Order
    Korea Water Resources Corporation
    Period
    2019.11~2023.08
    Scale
    1 Bridge(688m), 1 Underpass(80m)
    더보기

    Silvertown Tunnel

    Order
    Riverlink
    Period
    2019.11~2025.01
    Scale
    TBM Tunnel 1.4km Cut and Cover Tunnel 0.3km Open-cut Section 0.5km 9 Cross passages 2 Tunnel services buildings 2 Bridges(Overbridge/ Footbridge)
    더보기

    Gwangmyeong Seoul Highway by Private Investment Project(Section No.3)

    Order
    Seoseoul Expressway Corporation
    Period
    2019.03~2024.03
    Scale
    Tunnel 2,670m 1 Interchange 3 Bridges 1 Underpass
    더보기
  • HongKong, Central Kowloon Route - Yau Ma Tei West

    Order
    Hong Kong Highways Department
    Period
    2018.11~2025.10
    Scale
    - 7 Interchange Bridges - Underpass 250m - Landscape Deck - Ventilating opening, Soundproof facilities etc.
    더보기

    HongKong, Central Kowloon Route - Yau Ma Tei East

    Order
    Hong Kong Highways Department
    Period
    2018.01~2025.11
    Scale
    - Cut & Cover Tunnel 390m - Access Shaft - Demolition and reconstruction of existing overpass 300m - Soundproof facilities etc.
    더보기

    Highway above the 14 line between Ulsan , Miryang - construction (fifth section)

    Order
    Korea Highway Corporation
    Period
    2014.02~2021.02
    Scale
    Total length L = 8.02km 1) Tunnel : 7,947km / 1 places 2) Earthwork : Cut 168,652m3 3) drain hole : the drain pipe (55.9m / 5 places) , culverts (15.6m / 1 places) 4) Ball Packaging : Packaging of cement (50,330m3), asphalt concrete pavement (3a) 5) ball bag : 1 set
    더보기
  • Turkey, 3rd Bosporus Bridge Project

    Order
    ICA Ictas-Astaldi JV
    Period
    2013.06~2016.11
    Scale
    1. The total length of 2,164m ( main span 1,408m), Bridge width 54.4m ( eight lane road + railway 2tracks) 2. A complex geometry pylons world's largest suspension bridge , president of the 322m high
    더보기

    Geoje - Masan construction Route 3

    Order
    Busan Regional Construction Management Administration
    Period
    2012.07~2020.06
    Scale
    - Extension 6.4km (B = 20.0m, round 4 lanes ) - Cut 1.25 million ㎥ - Fill 890 000 ㎥ - Sato 710 000 ㎥ - Culvert nine places (462m) - Bridge 11 points (1.88km) - 5 points tunnel (1.91km) - Packaging gongoe
    더보기

    Turkey Istanbul Road Project (Turnkey EPC)

    Order
    DLH (General Directorate of Railways, Harbours, and Airports Construction under the Ministry of Transportation of Turkey)
    Period
    2012.01~2016.07
    Scale
    - Total length: 14.6km - Width extension section: 8.8km (6~8 lanes) - new section: 5.8km (4 lanes) (including TBM 3.340m)
    더보기
  • Opo-Pogok period (2nd) extended road paving work

    Order
    Construction Headquarters, Gyeonggi Province
    Period
    2011.11~2017.10
    Scale
    Road extension : 6.2Km, 4 car (B = 18.5m) - 2 points span bridge (720m) - Sogyoryang 11 points (453.5m) - Cloverleaf four places ( Pogok IC, Sinwon IC, Dongrim IC, Rngwon IC)
    더보기

    Construction of the 2nd phase facilities of the 2nd Osan Runway

    Order
    Defense Installation Agency
    Period
    2011.04~2013.09
    Scale
    - 2nd runway 2,743m, taxiway 470m - Rainwater pipes and culverts 10,146m - Water supply and drainage pipes 6,957m - Patriot/Vulcan cannon command post, accommodations and 33 buildings, Total area3,782㎡ - Flood control pump and air-conditioning, sanitary facilities - Electrical, communication and fire-fighting facilities
    더보기

    The tool Highway Route 30 (Sangju-Yeongdeok) Between construction

    Order
    Korea Highway Corporation
    Period
    2010.07~2016.12
    Scale
    - Extended 4.34km - Bridge three places (0.945㎞) - Tunnel 2 points (2.969㎞)
    더보기

Sihwa MTV Seohaean Detour Road Construction Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Wolgot-dong, Siheung-si, Gyeonggi-do
· Order Korea Water Resources Corporation
· Period 2019.11~2023.08
· Scale 1 Bridge(688m), 1 Underpass(80m)

Silvertown Tunnel

The Business Performance details view. can you check Work Scope, Order, Period
· Location London, UK
· Order Riverlink
· Period 2019.11~2025.01
· Scale TBM Tunnel 1.4km Cut and Cover Tunnel 0.3km Open-cut Section 0.5km 9 Cross passages 2 Tunnel services buildings 2 Bridges(Overbridge/ Footbridge)

Gwangmyeong Seoul Highway by Private Investment Project(Section No.3)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Choonui-dong, Bucheon-si, Gyeonggi-do
· Order Seoseoul Expressway Corporation
· Period 2019.03~2024.03
· Scale Tunnel 2,670m 1 Interchange 3 Bridges 1 Underpass

HongKong, Central Kowloon Route - Yau Ma Tei West

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yau Ma Tei, Kowloon, Hong Kong
· Order Hong Kong Highways Department
· Period 2018.11~2025.10
· Scale - 7 Interchange Bridges - Underpass 250m - Landscape Deck - Ventilating opening, Soundproof facilities etc.

HongKong, Central Kowloon Route - Yau Ma Tei East

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yau Ma Tei East, Hong Kong
· Order Hong Kong Highways Department
· Period 2018.01~2025.11
· Scale - Cut & Cover Tunnel 390m - Access Shaft - Demolition and reconstruction of existing overpass 300m - Soundproof facilities etc.

Highway above the 14 line between Ulsan , Miryang - construction (fifth section)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gorye-ri, Danjang-myeon, Miryang-si ~ Seon-ri, Wondong-myeon, Yangsan-si, Gyeongsangnam-do, Korea
· Order Korea Highway Corporation
· Period 2014.02~2021.02
· Scale Total length L = 8.02km 1) Tunnel : 7,947km / 1 places 2) Earthwork : Cut 168,652m3 3) drain hole : the drain pipe (55.9m / 5 places) , culverts (15.6m / 1 places) 4) Ball Packaging : Packaging of cement (50,330m3), asphalt concrete pavement (3a) 5) ball bag : 1 set

Turkey, 3rd Bosporus Bridge Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location oyrazkoy 3rd bosphorus bridge construction site inside military zone, Beykoz, Istanbul (Asian Side)
· Order ICA Ictas-Astaldi JV
· Period 2013.06~2016.11
· Scale 1. The total length of 2,164m ( main span 1,408m), Bridge width 54.4m ( eight lane road + railway 2tracks) 2. A complex geometry pylons world's largest suspension bridge , president of the 322m high

Geoje - Masan construction Route 3

The Business Performance details view. can you check Work Scope, Order, Period
· Location Naepo-ri, Gusan-myeon ~ Hyeondong, Masanhappo-gu, Changwon-si, Gyeongsangnam-do, Korea.
· Order Busan Regional Construction Management Administration
· Period 2012.07~2020.06
· Scale - Extension 6.4km (B = 20.0m, round 4 lanes ) - Cut 1.25 million ㎥ - Fill 890 000 ㎥ - Sato 710 000 ㎥ - Culvert nine places (462m) - Bridge 11 points (1.88km) - 5 points tunnel (1.91km) - Packaging gongoe

Turkey Istanbul Road Project (Turnkey EPC)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Kısıklı Cad. Tekin-Ak ?? Merkezi No:3 K:1 D:5 34662 Altunizade, Istanbul
· Order DLH (General Directorate of Railways, Harbours, and Airports Construction under the Ministry of Transportation of Turkey)
· Period 2012.01~2016.07
· Scale - Total length: 14.6km - Width extension section: 8.8km (6~8 lanes) - new section: 5.8km (4 lanes) (including TBM 3.340m)

Opo-Pogok period (2nd) extended road paving work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Pogok-eup, Cheoin-gu, Yongin-si, Gyeonggi-do, Korea
· Order Construction Headquarters, Gyeonggi Province
· Period 2011.11~2017.10
· Scale Road extension : 6.2Km, 4 car (B = 18.5m) - 2 points span bridge (720m) - Sogyoryang 11 points (453.5m) - Cloverleaf four places ( Pogok IC, Sinwon IC, Dongrim IC, Rngwon IC)

Construction of the 2nd phase facilities of the 2nd Osan Runway

The Business Performance details view. can you check Work Scope, Order, Period
· Location 700, Jeokbong-ri, Seotan-myeon, Pyeongtaek, Gyeonggi Province
· Order Defense Installation Agency
· Period 2011.04~2013.09
· Scale - 2nd runway 2,743m, taxiway 470m - Rainwater pipes and culverts 10,146m - Water supply and drainage pipes 6,957m - Patriot/Vulcan cannon command post, accommodations and 33 buildings, Total area3,782㎡ - Flood control pump and air-conditioning, sanitary facilities - Electrical, communication and fire-fighting facilities

The tool Highway Route 30 (Sangju-Yeongdeok) Between construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dalsan-myeon, Yeongdeok-gun, Gyeongsangbuk-do, Korea
· Order Korea Highway Corporation
· Period 2010.07~2016.12
· Scale - Extended 4.34km - Bridge three places (0.945㎞) - Tunnel 2 points (2.969㎞)