  • Yesan New Material Complex Development Project

    Yesan New Material Complex Development Project

    Order
    Yesan New Material Complex Development Co.,ltd
    Period
    2016.12~2017.02
    Scale
    - Earthwork : cut 996,068㎥, embankment 841,760㎥ - Rainy work(D450~D1500) : L=4,054m - Sewage work(D300) : L=2,595m - Waterworks construction(D100) : L=3,459m - Paving work : 56,200㎡ - Landscape work : park and greenery construction - electric work, etc
    더보기

    Hwaseong-Jeongnam Industrial Complex Development Project

    Order
    Hwaseong Jeongnam general industrial complex
    Period
    2016.07~2018.06
    Scale
    [ 17 pyeong industrial complex ] - Earthwork : 1,200,000㎥ - Constant ball : L = 3,634m - Excellent ball : L = 4,738m - Sewage ball : L = 4,515m - Ball Packaging : 59,069㎡ - Landscaping , street lighting and traffic light one way
    더보기

    Pyeongtaek US base site preparation and public infrastructure construction

    Order
    FED
    Period
    2008.12~2017.11
    Scale
    - Land excavations , pipeline engineering, Road Parcel 2A creation of the area. - Parcel 1 & K construction of the pipeline area - Utilities within the existing site USAG Humphreys & Infrastructure Upgrade
    더보기
  • Pyeongtaek US Military base site development and construction of public infrastructure

    Order
    USACE FED Purchasing Department
    Period
    2008.12~2003.11
    Scale
    Area 2,330,000 m2 Soft ground improvement area: 1,220,000m2, Earthwork (soil brought in: 4,500,000m3, waste soil: 600,000m3) Rainwater drainage work: 29,000m Sewage work: 22,100m Water supply work: 32,600m
    더보기

    Construction of the Korea F-1 International Circuit

    Order
    Korea Auto Valley Corporation
    Period
    2008.06~2011.03
    Scale
    - Site preparation (soft ground): 560,000 pyeong - Key facilities: Race track 5.615Km, Grand stand (16,000 spectators) and 22 other buildings, 3 bridges
    더보기

    Incheon Chungna Area Economic Free Zone Development Project (Section 3)

    Order
    Korea Land Corporation, Incheon Branch
    Period
    2007.01~2010.10
    Scale
    Subsoil Improving Work: SANDMAT(245,285 ㎡), P.B.D(777,715 m) Earth Work (Net Banking) : 1,780,000㎥ Rainfall Work (Pipeline) : 24,551 m Sewage Work: 11,420 m Waterworks: 14,964 m Pavement Work: 1,844 a River Work: 9,895 ㎡
    더보기
  • Paju Woonjung Phase 1 Area Development Section 1 Site Preparation Work

    Order
    Korea National Housing Corporation
    Period
    2006.06~2008.08
    Scale
    Complex Construction:1,706,000m2 Drainage Work:14.6km, Conduit :6.4km Pavement work :2,139a, Main Water Supply Line :16.3km
    더보기

    Asan Beabang Area Development Project Section 3

    Order
    Korea National Housing Corporation
    Period
    2006.02~2009.04
    Scale
    Complex Construction:908,000m2 Drain pipe :17km, Conduit :1.4km Pavement :1,500a, Bridge :River Bridge 3ea (L=265m) IPC Girder 1 ea(L=40m) River work:594m
    더보기

    Deagwanryung Alpensia Golf and Villa Section A Constructaion

    Order
    Kangwon Development Corporation
    Period
    2006.01~2008.06
    Scale
    Golf and Villa Area (573,255 Pyung) 27 holes of Membership Golf Club, Clubhouse (incl. Community center) etc, Hillside Villa 400 households
    더보기
  • Deagu Yeulha 2 Area Development Site Preparation Work

    Order
    Korea National Housing Corporation
    Period
    2004.10~2008.03
    Scale
    Site :1,029,000 m2 Drain Pipe line:25.0km, Conduit :2.2km Service Water Pipeline :10.2km, Pavement :1,250a Drainage Pump Center:520ton/min
    더보기

    Sihwa Multitechno Valley Section 5 Construction

    Order
    Korea Water Resource Corp.
    Period
    2003.06~2010.06
    Scale
    Complex Construction :2,139,000m2, Revetment Construction:4.3Km, Waterworks and sewage:39.5Km, Outer Road:3.9Km, Bridge(5ea)
    더보기

    Wetland Landscape Works for Banwol-river, Shiwha District

    Order
    Korea Water Resource Corp.
    Period
    1997.09~2000.12
    Scale
    Wetland Construction Area 415,952 m2, Approaching Road L=1.148 Km Width 8.5 m, Observation Road L=1,726 m, Observation POCKET 8ea, Cutting 220,983 m3, Net Banking 214,287 m3, Spoil 101,225 m3
    더보기

Yesan New Material Complex Development Project

  • Yesan New Material Complex Development Project
The Business Performance details view. can you check Work Scope, Order, Period
· Order Yesan New Material Complex Development Co.,ltd
· Period 2016.12~2017.02
· Scale - Earthwork : cut 996,068㎥, embankment 841,760㎥ - Rainy work(D450~D1500) : L=4,054m - Sewage work(D300) : L=2,595m - Waterworks construction(D100) : L=3,459m - Paving work : 56,200㎡ - Landscape work : park and greenery construction - electric work, etc

Hwaseong-Jeongnam Industrial Complex Development Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jeongnam-myeon, Hwaseong-si, Gyeonggi-do, Korea
· Order Hwaseong Jeongnam general industrial complex
· Period 2016.07~2018.06
· Scale [ 17 pyeong industrial complex ] - Earthwork : 1,200,000㎥ - Constant ball : L = 3,634m - Excellent ball : L = 4,738m - Sewage ball : L = 4,515m - Ball Packaging : 59,069㎡ - Landscaping , street lighting and traffic light one way

Pyeongtaek US base site preparation and public infrastructure construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dongcha-ri, Paengseong-eup, Pyeongtaek-si, Gyeonggi-do, Korea
· Order FED
· Period 2008.12~2017.11
· Scale - Land excavations , pipeline engineering, Road Parcel 2A creation of the area. - Parcel 1 & K construction of the pipeline area - Utilities within the existing site USAG Humphreys & Infrastructure Upgrade

Pyeongtaek US Military base site development and construction of public infrastructure

The Business Performance details view. can you check Work Scope, Order, Period
· Location San-12, Dongchang-ri, Paengseong-eup, Pyeongtaek
· Order USACE FED Purchasing Department
· Period 2008.12~2003.11
· Scale Area 2,330,000 m2 Soft ground improvement area: 1,220,000m2, Earthwork (soil brought in: 4,500,000m3, waste soil: 600,000m3) Rainwater drainage work: 29,000m Sewage work: 22,100m Water supply work: 32,600m

Construction of the Korea F-1 International Circuit

The Business Performance details view. can you check Work Scope, Order, Period
· Location 745-1, Sampo-ri, Samho-eup, Yeongam-gun, Southern Jeolla-do
· Order Korea Auto Valley Corporation
· Period 2008.06~2011.03
· Scale - Site preparation (soft ground): 560,000 pyeong - Key facilities: Race track 5.615Km, Grand stand (16,000 spectators) and 22 other buildings, 3 bridges

Incheon Chungna Area Economic Free Zone Development Project (Section 3)

The Business Performance details view. can you check Work Scope, Order, Period
· Location (Cheongna) Gyeongseo-dong and Illwon-dong, Seo-gu, Incheon
· Order Korea Land Corporation, Incheon Branch
· Period 2007.01~2010.10
· Scale Subsoil Improving Work: SANDMAT(245,285 ㎡), P.B.D(777,715 m) Earth Work (Net Banking) : 1,780,000㎥ Rainfall Work (Pipeline) : 24,551 m Sewage Work: 11,420 m Waterworks: 14,964 m Pavement Work: 1,844 a River Work: 9,895 ㎡

Paju Woonjung Phase 1 Area Development Section 1 Site Preparation Work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yadang-ri, Gyoha-eub, Paju-si, Gyeonggi-do
· Order Korea National Housing Corporation
· Period 2006.06~2008.08
· Scale Complex Construction:1,706,000m2 Drainage Work:14.6km, Conduit :6.4km Pavement work :2,139a, Main Water Supply Line :16.3km

Asan Beabang Area Development Project Section 3

The Business Performance details view. can you check Work Scope, Order, Period
· Location Baebang-myeon, Asan-si, Chungnam
· Order Korea National Housing Corporation
· Period 2006.02~2009.04
· Scale Complex Construction:908,000m2 Drain pipe :17km, Conduit :1.4km Pavement :1,500a, Bridge :River Bridge 3ea (L=265m) IPC Girder 1 ea(L=40m) River work:594m

Deagwanryung Alpensia Golf and Villa Section A Constructaion

The Business Performance details view. can you check Work Scope, Order, Period
· Location Suha-ri and Yongsan-ri area, Doam-myeon, Pyungchang-gun, Gangwon-do
· Order Kangwon Development Corporation
· Period 2006.01~2008.06
· Scale Golf and Villa Area (573,255 Pyung) 27 holes of Membership Golf Club, Clubhouse (incl. Community center) etc, Hillside Villa 400 households

Deagu Yeulha 2 Area Development Site Preparation Work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Area near Yulha-dong, Shingi-dong, Seoho-dong Ilwon, Dong-gu, Daegu
· Order Korea National Housing Corporation
· Period 2004.10~2008.03
· Scale Site :1,029,000 m2 Drain Pipe line:25.0km, Conduit :2.2km Service Water Pipeline :10.2km, Pavement :1,250a Drainage Pump Center:520ton/min

Sihwa Multitechno Valley Section 5 Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sihwa area, Ansan, Gyeonggi-do
· Order Korea Water Resource Corp.
· Period 2003.06~2010.06
· Scale Complex Construction :2,139,000m2, Revetment Construction:4.3Km, Waterworks and sewage:39.5Km, Outer Road:3.9Km, Bridge(5ea)

Wetland Landscape Works for Banwol-river, Shiwha District

The Business Performance details view. can you check Work Scope, Order, Period
· Location Bondo-dong, Ansan-si, Gyeonggi area
· Order Korea Water Resource Corp.
· Period 1997.09~2000.12
· Scale Wetland Construction Area 415,952 m2, Approaching Road L=1.148 Km Width 8.5 m, Observation Road L=1,726 m, Observation POCKET 8ea, Cutting 220,983 m3, Net Banking 214,287 m3, Spoil 101,225 m3