본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Donghae sewer maintenance business (Cheongok , songjeong , samhwa mound)

    Order
    Donghae-si, Gangwon-do, Korea
    Period
    2014.07~2018.01
    Scale
    [ Donghae cheongokdong , Songjeong , samhwadong sections] - New installation (D80~D450): 45,583m - Replace (D300 ~ D1000): 11,562m - Bo Number: 208 places full complement 3,531m, REPAIR
    더보기

    Seongmun national industrial complex wastewater treatment plant construction work

    Order
    LH Corporation
    Period
    2012.06~2016.12
    Scale
    - Management equipment and copper, water treatment facilities - East Building Ground Floor 1,2 - Inflow pipe (D800mm, L = 79m) - Discharge pipe Athletics period D700mm, L = 666m : Maritime zone D700mm, L = 824m
    더보기

    Ulsan Industrial Water Road Facility Improvement (Phase 1) Project

    Order
    Public Procurement Service
    Period
    2006.11~2009.10
    Scale
    Aged Pipe Improvement 12ea, Total Expansion L=13,492m - Pipe Regeneration (D900mm) : L = 3,387m - Steel Pipe Connection and Attachment (D2,000mm) : L = 3,857m - Steel Pipe Connection and Attachment (D1,500mm) : L = 492m - Steel Pipe Connection and Attachment (D1,200mm) : L = 3,847m - Steel Pipe Connection and Attachment (D1,100mm) : L = 605m - Steel Pipe Connection and Attachment (D900mm) : L = 784m - KP Dock Tile Cast Iron Attachment (D700mm) : L = 520m
  • Incheon Depot Project

    Order
    Infort Co.,Ltd.
    Period
    2005.10~2008.12
    Scale
    1) Soil Purification Process - Soil Cultivation (456,000m3) - Soil Washing (165,000m3) - Pre-Stabilization (130,000m3) - In-Situ Stabilization (16,000m3) - Thermal Desorption(6,800m3) 2) Civil Engineering Process - Earth Work (885,000m3) - Dismentaling and disposal of waste (14 Storage tanks to keep previous facilities and oil) - Structures reinforcement (Sheet Pile 1,120 Ton) - Other appurtenant work (1 set)
    더보기

    Driving Facility Construction for Water Supply System of Han River Downstream Area Phase 1 Section 1

    Order
    Korea Water Resouces Corporation
    Period
    2005.06~2007.12
    Scale
    1.Driving Channel Pipe Line (D2,600mm) : Total Expansion L=10.30km 2.Riverbed Tunnel of Han River (D3,600mm) : Shield TBM, L=1.31km 3.Driving Part: Semi Shield (Pacheon 430m, 88 Road Crossing 182m) , Box Driving 26m 4.Structure: 2 Maintenance Manholes, 3 Water Flow Controlling Valve Centers, 14 Air Controlling Valve Centers, 7 Water Drainage Valve Centers
    더보기

    Gwangju Stream Purification Project

    Order
    Gwangju City
    Period
    2004.12~2009.12
    Scale
    Facility to Secure Additional Preservation Water (Conveying Pump Center and Conveying Pipe Road 18.4km) Stream Purification:19.15km (Gwangju River 18.2km, Jeungshimsa River 0.95km) Space and Ecological Environment Creation (Gwangju River:18.2km) Removal and New Construction of Gwangju Bridge (3 spans Rigid Frame Bridge, Expansion 60m, Width 15~36m) Facility to Secure Flood Allowance Amounts 3.6km Gwangchecon 2 Bridge Under-Road Construction (L=476m) Bridge View Improvement (3 Bridge View Lightings, Street Light 2.6km) Security, Sound Facility, Fountain and others
    더보기
  • Metropolitan Area Water Supply System Adjustment Project (North Gyeonggi)

    Order
    Korea Water Resource Corp.
    Period
    2002.10~2004.05
    Scale
    Pipe Line : L=28.42 km, D=700~1,100m/m Boosting Station : Q=152,000m3/day Structure W 43m x B 35m x H 11m

    Filtration Facility Improvement of Busan Myungjang Filtration Center

    Order
    Busan office of Waterworks
    Period
    2001.02~2005.02
    Scale
    Remove the existing filtration facility (Q=167,000 TON/day) Filtration Facility Construction (Q=170,000 TON/day) Consolidation of the existing and the current innovated facilities (Q=280,000 TON/day)
    더보기

    Sanchung-eub Wastewater Treatment Facility Construction

    Order
    Sanchung-gun office
    Period
    1999.04~2003.12
    Scale
    Wastewater Treatment Center (Oxidation Ditch) 2,800Ton/Day Intercepting Pipeline L=2.85km, Construction: Administration Boiling and 4 others Mechanical Work 1set Electrical work 1 set
    더보기
  • Yongyun Wastewater Treatment Center Project Phase 2

    Order
    Ulsan
    Period
    1999.03~2002.03
    Scale
    Aeration tank , Deep Aeration Tank, Final Sedimentation Tank, Gravity Rectangular Dehydrator room, High-voltage BELT PRESS
    더보기

    Sheonam Filtration Center Modernazation and Advanced Collection Facility

    Order
    Ulsan
    Period
    1997.03~2002.01
    Scale
    Capacity Q=60,000m3/DAY, Site Area 69,675m3 Earth Work 441,000m3
    더보기

    Metropolitan Regional Water Supply Phase 5 Section 9 Construction

    Order
    Korea Water Resource Corp.
    Period
    1996.01~1999.01
    Scale
    Water Supply Pipeline 1 D1800 L=13,266m D1500 L=3,258m Water Supply Pipeline 2 D1800 L=4,160m Surgetower 1 ea D1500 L=1,286m Civil Engineering 1 booster pump station 1 Approaching Road

Donghae sewer maintenance business (Cheongok , songjeong , samhwa mound)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Donghae cheongokdong , Songjeong , samhwadong sections
· Order Donghae-si, Gangwon-do, Korea
· Period 2014.07~2018.01
· Scale [ Donghae cheongokdong , Songjeong , samhwadong sections] - New installation (D80~D450): 45,583m - Replace (D300 ~ D1000): 11,562m - Bo Number: 208 places full complement 3,531m, REPAIR

Seongmun national industrial complex wastewater treatment plant construction work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sambong-ri, Seongmun-myeon, Dangjin-gun, Chungcheongnam-do, Korea
· Order LH Corporation
· Period 2012.06~2016.12
· Scale - Management equipment and copper, water treatment facilities - East Building Ground Floor 1,2 - Inflow pipe (D800mm, L = 79m) - Discharge pipe Athletics period D700mm, L = 666m : Maritime zone D700mm, L = 824m

Ulsan Industrial Water Road Facility Improvement (Phase 1) Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order Public Procurement Service
· Period 2006.11~2009.10
· Scale Aged Pipe Improvement 12ea, Total Expansion L=13,492m - Pipe Regeneration (D900mm) : L = 3,387m - Steel Pipe Connection and Attachment (D2,000mm) : L = 3,857m - Steel Pipe Connection and Attachment (D1,500mm) : L = 492m - Steel Pipe Connection and Attachment (D1,200mm) : L = 3,847m - Steel Pipe Connection and Attachment (D1,100mm) : L = 605m - Steel Pipe Connection and Attachment (D900mm) : L = 784m - KP Dock Tile Cast Iron Attachment (D700mm) : L = 520m

Incheon Depot Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK Logistics Center (previous) 604-1 Yonghyeon 5-dong ,Nam-gu, Incheon
· Order Infort Co.,Ltd.
· Period 2005.10~2008.12
· Scale 1) Soil Purification Process - Soil Cultivation (456,000m3) - Soil Washing (165,000m3) - Pre-Stabilization (130,000m3) - In-Situ Stabilization (16,000m3) - Thermal Desorption(6,800m3) 2) Civil Engineering Process - Earth Work (885,000m3) - Dismentaling and disposal of waste (14 Storage tanks to keep previous facilities and oil) - Structures reinforcement (Sheet Pile 1,120 Ton) - Other appurtenant work (1 set)

Driving Facility Construction for Water Supply System of Han River Downstream Area Phase 1 Section 1

The Business Performance details view. can you check Work Scope, Order, Period
· Location Seoul (Korea Life Insurance 63 Bldg., Yeouido-dong ~ The Northern End of Gayang Bridge)
· Order Korea Water Resouces Corporation
· Period 2005.06~2007.12
· Scale 1.Driving Channel Pipe Line (D2,600mm) : Total Expansion L=10.30km 2.Riverbed Tunnel of Han River (D3,600mm) : Shield TBM, L=1.31km 3.Driving Part: Semi Shield (Pacheon 430m, 88 Road Crossing 182m) , Box Driving 26m 4.Structure: 2 Maintenance Manholes, 3 Water Flow Controlling Valve Centers, 14 Air Controlling Valve Centers, 7 Water Drainage Valve Centers

Gwangju Stream Purification Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gwangju Stream : Yongyeon Filteration Plant, Yongyeon-dong ,Dong-gu, Gwangju ~The Confluence of Yeongsangang, Yuduk-dong, Seo-gu, Gwangju
· Order Gwangju City
· Period 2004.12~2009.12
· Scale Facility to Secure Additional Preservation Water (Conveying Pump Center and Conveying Pipe Road 18.4km) Stream Purification:19.15km (Gwangju River 18.2km, Jeungshimsa River 0.95km) Space and Ecological Environment Creation (Gwangju River:18.2km) Removal and New Construction of Gwangju Bridge (3 spans Rigid Frame Bridge, Expansion 60m, Width 15~36m) Facility to Secure Flood Allowance Amounts 3.6km Gwangchecon 2 Bridge Under-Road Construction (L=476m) Bridge View Improvement (3 Bridge View Lightings, Street Light 2.6km) Security, Sound Facility, Fountain and others

Metropolitan Area Water Supply System Adjustment Project (North Gyeonggi)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Euijungbu, Pocheon, Dongducheon area , Gyeonggi
· Order Korea Water Resource Corp.
· Period 2002.10~2004.05
· Scale Pipe Line : L=28.42 km, D=700~1,100m/m Boosting Station : Q=152,000m3/day Structure W 43m x B 35m x H 11m

Filtration Facility Improvement of Busan Myungjang Filtration Center

The Business Performance details view. can you check Work Scope, Order, Period
· Location Myungjang Filtration Cetner, 345, Myungjang-dong, Dongrae-gu, Busan
· Order Busan office of Waterworks
· Period 2001.02~2005.02
· Scale Remove the existing filtration facility (Q=167,000 TON/day) Filtration Facility Construction (Q=170,000 TON/day) Consolidation of the existing and the current innovated facilities (Q=280,000 TON/day)

Sanchung-eub Wastewater Treatment Facility Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Oksan-ri, Sancheong-eub, Sancheong-gun, Gyungnam area
· Order Sanchung-gun office
· Period 1999.04~2003.12
· Scale Wastewater Treatment Center (Oxidation Ditch) 2,800Ton/Day Intercepting Pipeline L=2.85km, Construction: Administration Boiling and 4 others Mechanical Work 1set Electrical work 1 set

Yongyun Wastewater Treatment Center Project Phase 2

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yongyung-dong, Nam-gu, Ulsan
· Order Ulsan
· Period 1999.03~2002.03
· Scale Aeration tank , Deep Aeration Tank, Final Sedimentation Tank, Gravity Rectangular Dehydrator room, High-voltage BELT PRESS

Sheonam Filtration Center Modernazation and Advanced Collection Facility

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sunam-dong, Nam-gu, Ulsan
· Order Ulsan
· Period 1997.03~2002.01
· Scale Capacity Q=60,000m3/DAY, Site Area 69,675m3 Earth Work 441,000m3

Metropolitan Regional Water Supply Phase 5 Section 9 Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dogok-ri, Wabu-eub, Namyangju-si~Ganueng-dong, Euijungbu-si, Gyeonggi (City border)
· Order Korea Water Resource Corp.
· Period 1996.01~1999.01
· Scale Water Supply Pipeline 1 D1800 L=13,266m D1500 L=3,258m Water Supply Pipeline 2 D1800 L=4,160m Surgetower 1 ea D1500 L=1,286m Civil Engineering 1 booster pump station 1 Approaching Road