  • Buoy Ulsan Relocation Corporation ( including Donghae-1 gas pipeline relocation )

    Order
    Korea National Oil Corporation
    Period
    2015.07~2017.10
    Scale
    ○New pipelines and oil relocation Buoy -BUOY Relocation : SPM Refur - New pipeline (3.6km), remove the existing pipeline (0.6km) ○ Pipeline relocation - New gas pipeline (5.6km), remove the existing pipe (1.7km) ○ 1 construction type (operating bases) ○ Soil Improvement : DCM Corporation (364m X 32m)
    더보기

    Vietnam, NSRP Marine Works Project

    Order
    JGCS CONSORTIUM
    Period
    2013.07~2016.07
    Scale
    1. PKG B : Liquid Berth 2. PKG C : Crude Oil Pipelines (48” Pipe L=34.5km, 2 Lines) 3. PKG D : Breakwater(L=1,532m), Revetment (L=916m), Stormwater Outfall(L=216m)
    더보기

    Step 2 Aewol port development projects

    Order
    Jeju Special Self-Governing Province
    Period
    2012.03~2017.02
    Scale
    ○ outside facilities : 1,465m - Joan seobangpa 513m, par northern breakwater 602m, Northern breakwater 250m, east breakwater 100m) ○ berthing facilities : 270m Sand Pier 110m, 160m cement pier ○ Water facility ( one way routes and marina ) ○ connecting Joan ( the upright ): 60m ○ dredging and reclamation : 1 set ○ existing breakwater and the pier removed : 1 set ○ Other troops ball ○ city planning road : one way
    더보기
  • Construction of counter facilities to improve the calmness of Gamcheon Port

    Order
    Busan Port Construction Office, Busan Regional Maritime Affairs and Port Office
    Period
    2011.03~2013.09
    Scale
    - South breakwater (new): L=350m - Training dike (new): L=240m - Reinforcement of the existing East-West breakwater - Other appurtenant work
    더보기

    Construction of the counter facilities (phase 2-1) of the Pohang Yeongil Bay Port

    Order
    Pohang Regional Maritime Affairs & Port Office
    Period
    2010.03~2012.11
    Scale
    - Counter facilities: 1,026m (including connectors of 25.64m) - Reinforcement of the existing north breakwater 50m (reinforcement of the front wave dissipation block and superstructure) - Other appurtenant work: Aids to Navigation

    Section 20 (T/K) of the Nakdong River Revival Project

    Order
    Korea Water Resources Corporation
    Period
    2009.10~2011.12
    Scale
    - Total length: 21.21Km - Movable weir: 138m (including piers) - Fixed weir: 184.5m - Fishway: One natural/Borland fishway - Kong-do Public bridge: 675m - Improvement of the river channel: dredge amount (18,940,000㎥) - 2 Bridge protection structures (Yulji bridge, Jeokpo bridge) - 4 riverbed maintenance structures (Hwang River, etc.) - Ecological stream: one - 11 water pumps and distribution system - Structures: 3 buildings including the integrated management bldg., etc. - Pump/storage power station: 2,500Kw×2
    더보기
  • Section 7 (T/K) of the Geum River Revival Project

    Order
    Daejeon Regional Construction and Management Administration, Korea Water Resources Corporation
    Period
    2009.10~2011.12
    Scale
    - Length: 26.3km - Natural river improvement Improvement of the river channel (10.2 million ㎥) 18 interbed-storage protection structures 4 pier protection structures 52 drainage and sluice gates 4 water pumps and distribution system - Ecological stream - Multi-purpose movable weir (L=260M, H=7M) - pump/storage power station (1500KW×2기) - Structure (superintendent’s office)
    더보기

    Construction (T/K) of facilities in Section 6 of the Gyeongin Ara Waterway Project

    Order
    Korea Water Resources Corporation
    Period
    2009.06~2011.12
    Scale
    - 4 container berths: 1.2km - Sore protection: 4,923m - Road facilities: 5.8km/10 location - Han River floodgate: 5 mitergates - Unloading facilities: (2 WSG cranes) - Structures: Passenger terminal bldg. and 8 other buildings
    더보기

    SK Oil Loading Facility Relocation Project

    Order
    SK Corporation
    Period
    2007.06~2009.06
    Scale
    Length (Land + Sea) SK#2 = 1.85km + 4.6 km=6.45km(PLEM) SK#3 = 1.85km + 5.8 km=7.65km(PLEM/Anchor/Chain) Total = 6.45Km + 7.65Km =14.1Km SK #2,3 Bouy Refurbishment 1 set
    더보기
  • New Harbor in Gunjang South Quay Wall (Section 3) Construction

    Order
    Kunsan Regional Maritime Affairs & Fisheries Office
    Period
    2005.12~2010.06
    Scale
    ◆ Major Work ○ Quay Wall Work: 50,000 D.W.T 2 berths (L=560M) 30,000 D.W.T 1 berth (L=240M) ○ Background Site: 452,000M² (Revetment: 173M) ○ Dreading and Back Filling Work: 5,323,000M³ ○ Pavement Work: 4,006a
    더보기

    Masan Port Development (Phase 1-1) PFI

    Order
    Masan Container Terminal Co.
    Period
    2005.04~2011.03
    Scale
    Query Wall 980m(Container Pier 500m, Multi-Pier 480m) Container Pier 20,000DWT 2 berths Multi-purpose pier 30,000DWT 2 berths, Management Pier (320m) 1Berth Site Construction : 122,891 pyung(406,253㎡) - Container and hitreland:115,949 pyung(383,304㎡) - Management Pier:6,942 pyung(22,949㎡)
    더보기

    Gwangju Stream Purification Project

    Order
    Gwangju
    Period
    2004.12~2009.12
    Scale
    Gwangju River Maintenance : L = 19.15km Bridge : 1 ea Water facility and Conveying Pump center
    더보기

Buoy Ulsan Relocation Corporation ( including Donghae-1 gas pipeline relocation )

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dang-wol-ri, Ulju-gun, Ulsan, Korea land and sea area.
· Order Korea National Oil Corporation
· Period 2015.07~2017.10
· Scale ○New pipelines and oil relocation Buoy -BUOY Relocation : SPM Refur - New pipeline (3.6km), remove the existing pipeline (0.6km) ○ Pipeline relocation - New gas pipeline (5.6km), remove the existing pipe (1.7km) ○ 1 construction type (operating bases) ○ Soil Improvement : DCM Corporation (364m X 32m)

Vietnam, NSRP Marine Works Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Nghi Son Economic Zone, Hai Yen Commune, Tinh Gia District, Thanh Hoa Province,Vietnam. (opposite of Nghi Son Police)
· Order JGCS CONSORTIUM
· Period 2013.07~2016.07
· Scale 1. PKG B : Liquid Berth 2. PKG C : Crude Oil Pipelines (48” Pipe L=34.5km, 2 Lines) 3. PKG D : Breakwater(L=1,532m), Revetment (L=916m), Stormwater Outfall(L=216m)

Step 2 Aewol port development projects

The Business Performance details view. can you check Work Scope, Order, Period
· Location Aewol port, Aewol-eup, Jeju-si, Jeju Special Self-Governing Province, Korea
· Order Jeju Special Self-Governing Province
· Period 2012.03~2017.02
· Scale ○ outside facilities : 1,465m - Joan seobangpa 513m, par northern breakwater 602m, Northern breakwater 250m, east breakwater 100m) ○ berthing facilities : 270m Sand Pier 110m, 160m cement pier ○ Water facility ( one way routes and marina ) ○ connecting Joan ( the upright ): 60m ○ dredging and reclamation : 1 set ○ existing breakwater and the pier removed : 1 set ○ Other troops ball ○ city planning road : one way

Construction of counter facilities to improve the calmness of Gamcheon Port

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK E&C, 4th floor, 909-3, Dadae-dong, Saha-gu, Busan
· Order Busan Port Construction Office, Busan Regional Maritime Affairs and Port Office
· Period 2011.03~2013.09
· Scale - South breakwater (new): L=350m - Training dike (new): L=240m - Reinforcement of the existing East-West breakwater - Other appurtenant work

Construction of the counter facilities (phase 2-1) of the Pohang Yeongil Bay Port

The Business Performance details view. can you check Work Scope, Order, Period
· Location (791-948) 14-3, Yonghan-ri, Heunghae-eup, Buk-gu, Pohang, Northern Gyeongsang-do
· Order Pohang Regional Maritime Affairs & Port Office
· Period 2010.03~2012.11
· Scale - Counter facilities: 1,026m (including connectors of 25.64m) - Reinforcement of the existing north breakwater 50m (reinforcement of the front wave dissipation block and superstructure) - Other appurtenant work: Aids to Navigation

Section 20 (T/K) of the Nakdong River Revival Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 420, Hyeonchang-ri, Changnyeong-gun, Souther Gyeongsang-do
· Order Korea Water Resources Corporation
· Period 2009.10~2011.12
· Scale - Total length: 21.21Km - Movable weir: 138m (including piers) - Fixed weir: 184.5m - Fishway: One natural/Borland fishway - Kong-do Public bridge: 675m - Improvement of the river channel: dredge amount (18,940,000㎥) - 2 Bridge protection structures (Yulji bridge, Jeokpo bridge) - 4 riverbed maintenance structures (Hwang River, etc.) - Ecological stream: one - 11 water pumps and distribution system - Structures: 3 buildings including the integrated management bldg., etc. - Pump/storage power station: 2,500Kw×2

Section 7 (T/K) of the Geum River Revival Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 890, Cheongryong-ri, Euidang-myeon, Gongju, Southern Chungcheong-do
· Order Daejeon Regional Construction and Management Administration, Korea Water Resources Corporation
· Period 2009.10~2011.12
· Scale - Length: 26.3km - Natural river improvement Improvement of the river channel (10.2 million ㎥) 18 interbed-storage protection structures 4 pier protection structures 52 drainage and sluice gates 4 water pumps and distribution system - Ecological stream - Multi-purpose movable weir (L=260M, H=7M) - pump/storage power station (1500KW×2기) - Structure (superintendent’s office)

Construction (T/K) of facilities in Section 6 of the Gyeongin Ara Waterway Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 454-24, Singok-ri, Gochon-eup, Gimpo, Gyeonggi-do
· Order Korea Water Resources Corporation
· Period 2009.06~2011.12
· Scale - 4 container berths: 1.2km - Sore protection: 4,923m - Road facilities: 5.8km/10 location - Han River floodgate: 5 mitergates - Unloading facilities: (2 WSG cranes) - Structures: Passenger terminal bldg. and 8 other buildings

SK Oil Loading Facility Relocation Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Namhwa-dong, Nam-gu, Ulsan
· Order SK Corporation
· Period 2007.06~2009.06
· Scale Length (Land + Sea) SK#2 = 1.85km + 4.6 km=6.45km(PLEM) SK#3 = 1.85km + 5.8 km=7.65km(PLEM/Anchor/Chain) Total = 6.45Km + 7.65Km =14.1Km SK #2,3 Bouy Refurbishment 1 set

New Harbor in Gunjang South Quay Wall (Section 3) Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Construction Area for New Harbor In Gunjang, Osikdo-dong ,Gunsan-si, Jeonbuk
· Order Kunsan Regional Maritime Affairs & Fisheries Office
· Period 2005.12~2010.06
· Scale ◆ Major Work ○ Quay Wall Work: 50,000 D.W.T 2 berths (L=560M) 30,000 D.W.T 1 berth (L=240M) ○ Background Site: 452,000M² (Revetment: 173M) ○ Dreading and Back Filling Work: 5,323,000M³ ○ Pavement Work: 4,006a

Masan Port Development (Phase 1-1) PFI

The Business Performance details view. can you check Work Scope, Order, Period
· Location Public water, Gapo-dong, Masan-si, Gyungnam
· Order Masan Container Terminal Co.
· Period 2005.04~2011.03
· Scale Query Wall 980m(Container Pier 500m, Multi-Pier 480m) Container Pier 20,000DWT 2 berths Multi-purpose pier 30,000DWT 2 berths, Management Pier (320m) 1Berth Site Construction : 122,891 pyung(406,253㎡) - Container and hitreland:115,949 pyung(383,304㎡) - Management Pier:6,942 pyung(22,949㎡)

Gwangju Stream Purification Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yongyeon-dong, Dong-gu~Yucheon-dong, Seo-gu, Gwangju
· Order Gwangju
· Period 2004.12~2009.12
· Scale Gwangju River Maintenance : L = 19.15km Bridge : 1 ea Water facility and Conveying Pump center