  • Busan Metro ( ever- lower) 1 tool construction

    Order
    Busan Transportation Corporation
    Period
    2015.12~2020.11
    Scale
    ○ Total length : 1.495km - Station ( 2 places ): 94.9m - Line ( excavation ): 1,332.7m - Main vents ( 4 places ): 67.4m - Mechatronics Corporation one way
    더보기

    Subway Jinjeop line(Danggogae ~ jinjeop ) double-track train the first tool construction

    Order
    Korea Rail Network Authority
    Period
    2015.06~2019.12
    Scale
    [ Total length L = 4.576Km] - Tunnel 3.801Km / 1 places - Station ( underground layer 3 ) 0.203Km / 1 places - Excavation Box 0.270Km - Main supply and exhaust ventilation small four places - Substations and other function rooms
    더보기

    Donghae line Pohang~Samcheok railway construction roadbed construction tools Article 11

    Order
    Korea Rail Network Authority
    Period
    2015.01~2019.01
    Scale
    - Extending a total of 9.050km ( disconnection) - Earthwork 2.964km - Bridge 2 places (0.465km) - Tunnel 4 places (5.621km) - Station 1 point (146m)
    더보기
  • Bujeon- Masan Double Track Railway Concession construction

    Order
    Smart Rail Corp.,
    Period
    2014.05~2020.06
    Scale
    - Earthwork : L = 11.5㎞ - Bridge : L = 6.1㎞ ( up Nakdong River Bridge, Bridge joman Kanto Bridge, New Moon bridges , etc.) - Tunnel : L = 13.0㎞ (Shield: 2.7㎞, NATM: 10.3㎞) - Station 5 points ( failure, ideas , BM01, BM02, Jiang ) - Sharing section : L = 2.2㎞ - A signal in two places ( chilsan , jinrye )
    더보기

    Median line Dodam- Youngcheon second double track train roadbed construction tools

    Order
    Korea Rail Network Authority
    Period
    2014.01~2017.06
    Scale
    [ Total length : L = 14.675㎞] - Tunnel : L = 11.165㎞ (2 points inclined Gang) - Earthwork : L = 2.850㎞ - Bridge : L = 0.660㎞ (5 places) - Orbit : Main Line
    더보기

    Qatar, Doha Metro Red Line North Project

    DECC station

    Order
    Qatar Railways Company
    Period
    2013.06~2018.08
    Scale
    1. Twin TBM Tunnel (11.69km, TBM : 4대 ) 2. 6 Station (1.74km) 3. Trough Structure, Emergency Exit 2개소
    더보기
  • Bujeon~Masan double track electrification private capital project

    Order
    Smart Rail
    Period
    2013.02~2019.01
    Scale
    Earthwork: 11.5km Bridges: 6.1km (West Nakdong River Bridge, Joman Bridge, Gwandong Bridge, Sinwol Bridge, etc.) Tunnels: 13.0km (Shield 2.7km, NATM 10.3km) (Shield Nakdong Tunnel) (NATM ? Gaehwa Tunnel, Geumbyeong Tunnel, Yuha Tunnel) Stations: 5 (Bujeon, Sasang, Gimhae Airport, Garak IC and Jangyu) Signal boxes: 2 (Chilsan Signal Box, Jinrye Signal Box)

    The Metropolitan Rail (Suseo~Pyeongtaek) Article 8 Other new tools roadbed construction

    Order
    Korea Rail Network Authority
    Period
    2012.01~2016.06
    Scale
    - Earthwork : 1,694m - U-Type: 486m - Excavation BOX: 100m - Excavation tunnel : 660m - NATM: 722m - Stereoscopic viaducts : one place
    더보기

    Singapore DTL3 C930 Project

    Order
    Land Transport Authority (LTA)
    Period
    2011.04~2016.12
    Scale
    - TBM Tunnel: 940 m (2Lines) - Cut & Cover Tunnel: 39m - Station 1 location: 148m
    더보기
  • Daegu Line East Daegu and Youngchun roadbed double-track first tool, a Corporation

    Order
    Korea Rail Network Authority
    Period
    2011.02~2016.12
    Scale
    [ Total length : 9.45km] - Earthwork : 2.68km - Bridge : 4.51km (5 places) - Station : 2.26km (2 places) - Temporary Line : 0.66km (1 point)
    더보기

    Phase 3 to build 918 Seoul Subway Line 9 Corporation

    Order
    The Seoul Metropolitan Office of Urban Infrastructure Division
    Period
    2010.02~2017.02
    Scale
    - Metro extension L = 1.29㎞ - 3 points excavation zone - Stops in one place - Vent 3 points - 2 points tunnel
    더보기

    Construction of Section 918 of Phase-III of Seoul Subway Line 9

    Order
    Seoul Metropolitan Infrastructure Headquarters
    Period
    2010.02~2016.02
    Scale
    - Subway length L=1.29㎞ - 1 station - 3 ventilation openings
    더보기

Busan Metro ( ever- lower) 1 tool construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Busan Sasang Station (Line 2) ~ Gamjeon-dong, Sasang-gu, Busan, Korea
· Order Busan Transportation Corporation
· Period 2015.12~2020.11
· Scale ○ Total length : 1.495km - Station ( 2 places ): 94.9m - Line ( excavation ): 1,332.7m - Main vents ( 4 places ): 67.4m - Mechatronics Corporation one way

Subway Jinjeop line(Danggogae ~ jinjeop ) double-track train the first tool construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sanggye-dong, Nowon-gu, Seoul. ~ Jinjeop-eup, Namyangju-si, Gyeonggi-do, Korea
· Order Korea Rail Network Authority
· Period 2015.06~2019.12
· Scale [ Total length L = 4.576Km] - Tunnel 3.801Km / 1 places - Station ( underground layer 3 ) 0.203Km / 1 places - Excavation Box 0.270Km - Main supply and exhaust ventilation small four places - Substations and other function rooms

Donghae line Pohang~Samcheok railway construction roadbed construction tools Article 11

The Business Performance details view. can you check Work Scope, Order, Period
· Location Wonnam-myeon ~ Geunnam-myeon, Uljin-gun, Gyeongbuk, Korea
· Order Korea Rail Network Authority
· Period 2015.01~2019.01
· Scale - Extending a total of 9.050km ( disconnection) - Earthwork 2.964km - Bridge 2 places (0.465km) - Tunnel 4 places (5.621km) - Station 1 point (146m)

Bujeon- Masan Double Track Railway Concession construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Busanjin-gu ~ Gangseo-gu, Busan, Korea
· Order Smart Rail Corp.,
· Period 2014.05~2020.06
· Scale - Earthwork : L = 11.5㎞ - Bridge : L = 6.1㎞ ( up Nakdong River Bridge, Bridge joman Kanto Bridge, New Moon bridges , etc.) - Tunnel : L = 13.0㎞ (Shield: 2.7㎞, NATM: 10.3㎞) - Station 5 points ( failure, ideas , BM01, BM02, Jiang ) - Sharing section : L = 2.2㎞ - A signal in two places ( chilsan , jinrye )

Median line Dodam- Youngcheon second double track train roadbed construction tools

The Business Performance details view. can you check Work Scope, Order, Period
· Location Daegang-myeon, Danyang-gun, Chungbuk ~ Punggi-eup, Yeongju-si, Gyeongbuk, Korea.
· Order Korea Rail Network Authority
· Period 2014.01~2017.06
· Scale [ Total length : L = 14.675㎞] - Tunnel : L = 11.165㎞ (2 points inclined Gang) - Earthwork : L = 2.850㎞ - Bridge : L = 0.660㎞ (5 places) - Orbit : Main Line

Qatar, Doha Metro Red Line North Project

  • DECC station
  • Qassar Station
The Business Performance details view. can you check Work Scope, Order, Period
· Location Al Mara Business Tower, Suhaim Bin Hamad Street
· Order Qatar Railways Company
· Period 2013.06~2018.08
· Scale 1. Twin TBM Tunnel (11.69km, TBM : 4대 ) 2. 6 Station (1.74km) 3. Trough Structure, Emergency Exit 2개소

Bujeon~Masan double track electrification private capital project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Bucheon-dong, Busanjin-gu ~ Jinrye-myeon, Gimhae, Southern Gyeongsang-do
· Order Smart Rail
· Period 2013.02~2019.01
· Scale Earthwork: 11.5km Bridges: 6.1km (West Nakdong River Bridge, Joman Bridge, Gwandong Bridge, Sinwol Bridge, etc.) Tunnels: 13.0km (Shield 2.7km, NATM 10.3km) (Shield Nakdong Tunnel) (NATM ? Gaehwa Tunnel, Geumbyeong Tunnel, Yuha Tunnel) Stations: 5 (Bujeon, Sasang, Gimhae Airport, Garak IC and Jangyu) Signal boxes: 2 (Chilsan Signal Box, Jinrye Signal Box)

The Metropolitan Rail (Suseo~Pyeongtaek) Article 8 Other new tools roadbed construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jije-dong, Pyeongtaek-si, Gyeonggi-do, Korea
· Order Korea Rail Network Authority
· Period 2012.01~2016.06
· Scale - Earthwork : 1,694m - U-Type: 486m - Excavation BOX: 100m - Excavation tunnel : 660m - NATM: 722m - Stereoscopic viaducts : one place

Singapore DTL3 C930 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 40A Ubi Avenue 2, Singapore 408900
· Order Land Transport Authority (LTA)
· Period 2011.04~2016.12
· Scale - TBM Tunnel: 940 m (2Lines) - Cut & Cover Tunnel: 39m - Station 1 location: 148m

Daegu Line East Daegu and Youngchun roadbed double-track first tool, a Corporation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do ~ Dong-gu, Daegu, Korea
· Order Korea Rail Network Authority
· Period 2011.02~2016.12
· Scale [ Total length : 9.45km] - Earthwork : 2.68km - Bridge : 4.51km (5 places) - Station : 2.26km (2 places) - Temporary Line : 0.66km (1 point)

Phase 3 to build 918 Seoul Subway Line 9 Corporation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Samjeon-dong (District) at Jamsil hospital ~ 86, Jamsil-dong, Songpa-gu, Seoul, Korea ~
· Order The Seoul Metropolitan Office of Urban Infrastructure Division
· Period 2010.02~2017.02
· Scale - Metro extension L = 1.29㎞ - 3 points excavation zone - Stops in one place - Vent 3 points - 2 points tunnel

Construction of Section 918 of Phase-III of Seoul Subway Line 9

The Business Performance details view. can you check Work Scope, Order, Period
· Location Seongji Bldg., 193-9, Jamsil-dong, Songpa-gu, Seoul
· Order Seoul Metropolitan Infrastructure Headquarters
· Period 2010.02~2016.02
· Scale - Subway length L=1.29㎞ - 1 station - 3 ventilation openings