  • Ulsan reserve base underground structure construction

    Order
    Korea National Oil Corporation
    Period
    2016.01~2020.12
    Scale
    - Civil : 1,030 million barrels of crude oil storage ( excavation volume : 189 million ㎥) - Mechanical : Oil / effusion can peomgak 8 , Fire / integer / non- waste - Electricity: process control equipment, measuring equipment outside the cave yuwi - Construction: haengjeongdong 13 buildings and support facilities - Parks and green space construction type 1
    더보기

    Turkey, Eurasia Tunnel Project

    Order
    ATAS
    Period
    2013.04~2017.03
    Scale
    1. The total length of 14.6 km 2. TBM Tunnel 3.3 km / NATM Tunnel 1.9 km
    더보기

    Singapore, Cable Tunnel NS2 Project

    Order
    SP POWER ASSETS
    Period
    2012.10~2018.06
    Scale
    1. The total length : 5.38 km (Slurry TBM: 2 units) 2. Shaft 3 points (Permanent 3 places) 3. Building 3 points (Ventilation 2 points + Equipment 1 point)
    더보기
  • Singapore, Cable Tunnel EW2 Project

    Order
    SP POWER ASSETS
    Period
    2012.10~2016.12
    Scale
    1. The total length : 6.8km (Slurry TBM: 3 units) 2. Shafts: 4 points (Permanent 3 points , Temporary 1 point) 3. Utility Buildings: 3 points
    더보기

    Janglim - Jinhae main pipe construction

    Order
    Korea Gas Corporation
    Period
    2012.10~2016.03
    Scale
    Buried main pipe : 30"" ""× 16.96km - Supply Bureau : 2 new locations ( Chinhae G / S, the signal B / V) - Proven testing, installation and operation yard
    더보기

    India, Padur Oil storage site construction

    Order
    Indian Strategic Petroleum Reserves Limited
    Period
    2010.05~2015.04
    Scale
    1. crude oil storage 1.5MMT, saving Co- : 3.572km
    더보기
  • Yongma Privately Financed Construction Projects a tunnel.

    Order
    Yongma tunnel Corp.,
    Period
    2009.11~2014.11
    Scale
    - Extension L = 3.56km - 1 point tunnel (2.5km) - Three places Bridges
    더보기

    India, Mangalore Crude oil reserve base construction

    Order
    Indian Strategic Petroleum Reserves Limited
    Period
    2009.04~2015.10
    Scale
    1. crude oil storage 1.25MMT, saving Co- : 2.800km
    더보기

    Construction of the oil storage tank terminal in Mangalore, India

    Order
    ISPRL (Indian Strategic Petroleum Reserves Limited)
    Period
    2009.04~2012.04
    Scale
    - Underground oil storage tank terminal 1.5MMT (1,100 million barrels) - Cavern, Water Curtain Tunnel, Access Tunnel, Operation Shaft - Drilling (2,178,202㎥), reinforcement (rock bolt 2,620ton, shotcrete 342,215㎥, grouting 625MT)
    더보기
  • Construction of the electric power tunnel for supply of electric power to the Gangnam area (Nonil-Nonhyeon)

    Order
    KEPCO
    Period
    2008.12~2014.08
    Scale
    - Electric power tunnel L=3.344km - Increases power supply capacity to match increasing demand for electric power in Seocho-gu and Gangnam-gu, Seoul
    더보기

    Ulsan Extra Reserve Base Construction Project

    Order
    Korea National Oil Corporation
    Period
    2005.10~2010.02
    Scale
    Storage amount: 6.5m barrel
    더보기

    Siheung-Doksan Power Cable Construction

    Order
    KEPCO
    Period
    2001.04~2004.01
    Scale
    Gross Area: 2,836m Shield TBM Tunnel Part 2,739m, NATM Tunnel Part 56m, Open-cut Electric culvert 75m, Shield TBM Tunnel Work :Tunnel Diameter Ø3.5m , Vertical Culvert : 2 ea( Ø15.0m 1ea, Ø6.8m 1ea) Distribution Branch Sphere : 1 ea ( Steel Pipe Pressure L=57.0m), 2 Ventilators (Forced ventilation 1ea, Natural Charging 1ea), Facilities Transmission 3 cables, Distribution 12 cables, 1 Communication set
    더보기

Ulsan reserve base underground structure construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Hangnam-ri, Onsan-eup, Ulju-gun, Ulsan, Korea
· Order Korea National Oil Corporation
· Period 2016.01~2020.12
· Scale - Civil : 1,030 million barrels of crude oil storage ( excavation volume : 189 million ㎥) - Mechanical : Oil / effusion can peomgak 8 , Fire / integer / non- waste - Electricity: process control equipment, measuring equipment outside the cave yuwi - Construction: haengjeongdong 13 buildings and support facilities - Parks and green space construction type 1

Turkey, Eurasia Tunnel Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Burhan Felek Caddesi, 1. Cevreyolu Sokak, 34668 Haydarpa?a, Uskudar / ?stanbul
· Order ATAS
· Period 2013.04~2017.03
· Scale 1. The total length of 14.6 km 2. TBM Tunnel 3.3 km / NATM Tunnel 1.9 km

Singapore, Cable Tunnel NS2 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 15A Ang Mo Kio Avenue 1 singapore 569984
· Order SP POWER ASSETS
· Period 2012.10~2018.06
· Scale 1. The total length : 5.38 km (Slurry TBM: 2 units) 2. Shaft 3 points (Permanent 3 places) 3. Building 3 points (Ventilation 2 points + Equipment 1 point)

Singapore, Cable Tunnel EW2 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 5 May Road, Singapore 328593
· Order SP POWER ASSETS
· Period 2012.10~2016.12
· Scale 1. The total length : 6.8km (Slurry TBM: 3 units) 2. Shafts: 4 points (Permanent 3 points , Temporary 1 point) 3. Utility Buildings: 3 points

Janglim - Jinhae main pipe construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Songjeong-dong, Gangseo-gu, Busan, Korea
· Order Korea Gas Corporation
· Period 2012.10~2016.03
· Scale Buried main pipe : 30"" ""× 16.96km - Supply Bureau : 2 new locations ( Chinhae G / S, the signal B / V) - Proven testing, installation and operation yard

India, Padur Oil storage site construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Padur, Karnataka India
· Order Indian Strategic Petroleum Reserves Limited
· Period 2010.05~2015.04
· Scale 1. crude oil storage 1.5MMT, saving Co- : 3.572km

Yongma Privately Financed Construction Projects a tunnel.

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jungnang-gu, Seoul, Korea
· Order Yongma tunnel Corp.,
· Period 2009.11~2014.11
· Scale - Extension L = 3.56km - 1 point tunnel (2.5km) - Three places Bridges

India, Mangalore Crude oil reserve base construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Mangalore, Karnataka, India
· Order Indian Strategic Petroleum Reserves Limited
· Period 2009.04~2015.10
· Scale 1. crude oil storage 1.25MMT, saving Co- : 2.800km

Construction of the oil storage tank terminal in Mangalore, India

The Business Performance details view. can you check Work Scope, Order, Period
· Location Chandrahas Nagar, Permude, Bajpe, Mangalore
· Order ISPRL (Indian Strategic Petroleum Reserves Limited)
· Period 2009.04~2012.04
· Scale - Underground oil storage tank terminal 1.5MMT (1,100 million barrels) - Cavern, Water Curtain Tunnel, Access Tunnel, Operation Shaft - Drilling (2,178,202㎥), reinforcement (rock bolt 2,620ton, shotcrete 342,215㎥, grouting 625MT)

Construction of the electric power tunnel for supply of electric power to the Gangnam area (Nonil-Nonhyeon)

The Business Performance details view. can you check Work Scope, Order, Period
· Location 7th floor, Yoheyon Building, 242-29, Nonhyeon-2-dong, Gangnam-gu, Seoul
· Order KEPCO
· Period 2008.12~2014.08
· Scale - Electric power tunnel L=3.344km - Increases power supply capacity to match increasing demand for electric power in Seocho-gu and Gangnam-gu, Seoul

Ulsan Extra Reserve Base Construction Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 300, Hangnam-ri ,Onsan-eup ,Ulju-gun, Ulsan
· Order Korea National Oil Corporation
· Period 2005.10~2010.02
· Scale Storage amount: 6.5m barrel

Siheung-Doksan Power Cable Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Shiheung Substation, Shieung 1dong ~ Doksan Substation, Doksan 1 dong, Gumcheon-gu, Seoul
· Order KEPCO
· Period 2001.04~2004.01
· Scale Gross Area: 2,836m Shield TBM Tunnel Part 2,739m, NATM Tunnel Part 56m, Open-cut Electric culvert 75m, Shield TBM Tunnel Work :Tunnel Diameter Ø3.5m , Vertical Culvert : 2 ea( Ø15.0m 1ea, Ø6.8m 1ea) Distribution Branch Sphere : 1 ea ( Steel Pipe Pressure L=57.0m), 2 Ventilators (Forced ventilation 1ea, Natural Charging 1ea), Facilities Transmission 3 cables, Distribution 12 cables, 1 Communication set