  • Donghae sewer maintenance business (Cheongok , songjeong , samhwa mound)

    Order
    Donghae-si, Gangwon-do, Korea
    Period
    2014.07~2018.01
    Scale
    [ Donghae cheongokdong , Songjeong , samhwadong sections] - New installation (D80~D450): 45,583m - Replace (D300 ~ D1000): 11,562m - Bo Number: 208 places full complement 3,531m, REPAIR
    더보기

    Deagwanryung Alpensia Golf and Villa Section A Constructaion

    Order
    Kangwon Development Corporation
    Period
    2006.01~2008.06
    Scale
    Golf and Villa Area (573,255 Pyung) 27 holes of Membership Golf Club, Clubhouse (incl. Community center) etc, Hillside Villa 400 households
    더보기

    Road Improvement in Yanggu-eub (Woongjinri area) Project

    Order
    Wonju Regional Homeland Management Agency
    Period
    2001.08~2005.08
    Scale
    Expansion 7.44km Earth Work : cutting 560,000m3, banking 126,000m3, Spoil 681,000m3 Bridge : 6 bridges 684m Tunnel : 2 tunnels 2,240m Ascon : 43,881 ton
  • Youngdong Line (Dongbeaksan-Dogye) Railroad Shifting Construction

    Order
    Korea Rail Network Authority Youngnam Region Office
    Period
    1999.12~2007.09
    Scale
    Expansion : 17.84Km Earth Work : 1.6Km Tunnel : 16.24Km 2 Inclined shafts, 2 Stations, 1 Vertical Culvert
    더보기

    Gyungchun Line Double-track Railway Section 7 Construction

    Order
    Korea Rail Network Authrotiy Metropolitan Office
    Period
    1999.12~2007.11
    Scale
    Railway Expansion12.146km Bridge: 3,224m 5 bridges, Tunnel: 8,198m 4 Tunnels

    Sigok-Yeondang Road Expansion and Pavement Works

    Order
    Wonju Regional Homeland Management Agency
    Period
    1998.08~2005.01
    Scale
    Road Expansion L=8.33Km, B=20m Earth work: Cutting 2,321,253㎥, Banking 2,248,177㎥ Structure work: S.T BOX 1,255m/6 ea R.C Rigid Frame 87m/3ea Solid-Rib Arch type 35m/1 ea Strong π-type Rigid Frame 60m/1 ea Pavement work: surface 600a base 403a
    더보기
  • Bukpyung Industrial Complex Access Road Open and Pavement Project

    Order
    Wonju Regional Homeland Management Agency
    Period
    1997.12~2001.04
    Scale
    Bridge Work: L=135m & L=270M STEEL BOX 3,225Ton R.C.D 48 ea, ALL CASING 114 ea, Earth Work: 1,175m, Reinforced Earth Wall 409m Packaging Work: Auxiliary Base 7,417m3

    Mooneuijea Tunnel Construction

    Order
    Gangwon-do
    Period
    1996.09~2002.09
    Scale
    Total Expansion 3.5Km (2 Lanes) Tunnel: 1,360m Approaching Road 2,140m Earth work: Cutting173,124m3, Banking 321,501m3 Structure work: 2 bridges Maeub 1 240m, Maeub 2 30m
    더보기

    Jeacheon-Sigok Road Construction

    Order
    Deajun Agency
    Period
    1995.12~2001.05

Donghae sewer maintenance business (Cheongok , songjeong , samhwa mound)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Donghae cheongokdong , Songjeong , samhwadong sections
· Order Donghae-si, Gangwon-do, Korea
· Period 2014.07~2018.01
· Scale [ Donghae cheongokdong , Songjeong , samhwadong sections] - New installation (D80~D450): 45,583m - Replace (D300 ~ D1000): 11,562m - Bo Number: 208 places full complement 3,531m, REPAIR

Deagwanryung Alpensia Golf and Villa Section A Constructaion

The Business Performance details view. can you check Work Scope, Order, Period
· Location Suha-ri and Yongsan-ri area, Doam-myeon, Pyungchang-gun, Gangwon-do
· Order Kangwon Development Corporation
· Period 2006.01~2008.06
· Scale Golf and Villa Area (573,255 Pyung) 27 holes of Membership Golf Club, Clubhouse (incl. Community center) etc, Hillside Villa 400 households

Road Improvement in Yanggu-eub (Woongjinri area) Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Woongjin-ri~Juk-ri, Yanggu-eub, Yanggu-gun, Gangwon
· Order Wonju Regional Homeland Management Agency
· Period 2001.08~2005.08
· Scale Expansion 7.44km Earth Work : cutting 560,000m3, banking 126,000m3, Spoil 681,000m3 Bridge : 6 bridges 684m Tunnel : 2 tunnels 2,240m Ascon : 43,881 ton

Youngdong Line (Dongbeaksan-Dogye) Railroad Shifting Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Beaksan-dong, Taebeak-si~Dogye-eub, Samchuck-si, Gangwon-do
· Order Korea Rail Network Authority Youngnam Region Office
· Period 1999.12~2007.09
· Scale Expansion : 17.84Km Earth Work : 1.6Km Tunnel : 16.24Km 2 Inclined shafts, 2 Stations, 1 Vertical Culvert

Gyungchun Line Double-track Railway Section 7 Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Namsan-myeon~Shindong-myeon, Chuncheon-si, Gangwon
· Order Korea Rail Network Authrotiy Metropolitan Office
· Period 1999.12~2007.11
· Scale Railway Expansion12.146km Bridge: 3,224m 5 bridges, Tunnel: 8,198m 4 Tunnels

Sigok-Yeondang Road Expansion and Pavement Works

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ssangyong-ri, Seo-myeon~Yeondang-ri, Nam-myeon, Youngwal-gun, Gangwondo
· Order Wonju Regional Homeland Management Agency
· Period 1998.08~2005.01
· Scale Road Expansion L=8.33Km, B=20m Earth work: Cutting 2,321,253㎥, Banking 2,248,177㎥ Structure work: S.T BOX 1,255m/6 ea R.C Rigid Frame 87m/3ea Solid-Rib Arch type 35m/1 ea Strong π-type Rigid Frame 60m/1 ea Pavement work: surface 600a base 403a

Bukpyung Industrial Complex Access Road Open and Pavement Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Songjeong-dong, Donghae-si, Gangwon
· Order Wonju Regional Homeland Management Agency
· Period 1997.12~2001.04
· Scale Bridge Work: L=135m & L=270M STEEL BOX 3,225Ton R.C.D 48 ea, ALL CASING 114 ea, Earth Work: 1,175m, Reinforced Earth Wall 409m Packaging Work: Auxiliary Base 7,417m3

Mooneuijea Tunnel Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Shin-ri, Dogye-eub~Sangmaeub-ri, Nogok-myeon, Samchuk-si, Gangwon-do
· Order Gangwon-do
· Period 1996.09~2002.09
· Scale Total Expansion 3.5Km (2 Lanes) Tunnel: 1,360m Approaching Road 2,140m Earth work: Cutting173,124m3, Banking 321,501m3 Structure work: 2 bridges Maeub 1 240m, Maeub 2 30m

Jeacheon-Sigok Road Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Donghyun-dong, Jaecheon-si, Chungbuk~Ssangyong-ri, Seo-myeon, Youngwol-gun, Gangwon
· Order Deajun Agency
· Period 1995.12~2001.05