본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Yesan New Material Complex Development Project

    Yesan New Material Complex Development Project

    Order
    Yesan New Material Complex Development Co.,ltd
    Period
    2016.12~2017.02
    Scale
    - Earthwork : cut 996,068㎥, embankment 841,760㎥ - Rainy work(D450~D1500) : L=4,054m - Sewage work(D300) : L=2,595m - Waterworks construction(D100) : L=3,459m - Paving work : 56,200㎡ - Landscape work : park and greenery construction - electric work, etc
    더보기

    Median line Dodam- Youngcheon second double track train roadbed construction tools

    Order
    Korea Rail Network Authority
    Period
    2014.01~2017.06
    Scale
    [ Total length : L = 14.675㎞] - Tunnel : L = 11.165㎞ (2 points inclined Gang) - Earthwork : L = 2.850㎞ - Bridge : L = 0.660㎞ (5 places) - Orbit : Main Line
    더보기

    Seongmun national industrial complex wastewater treatment plant construction work

    Order
    LH Corporation
    Period
    2012.06~2016.12
    Scale
    - Management equipment and copper, water treatment facilities - East Building Ground Floor 1,2 - Inflow pipe (D800mm, L = 79m) - Discharge pipe Athletics period D700mm, L = 666m : Maritime zone D700mm, L = 824m
    더보기
  • Construction of the roadbed for section 2-2 of the Honam High-Speed Railway

    Order
    Korea Rail Network Authority
    Period
    2009.11~2013.06
    Scale
    - Length 10.3km - 6 bridges (5.34㎞) - Earthwork: 8 locations (4.90㎞) - One tunnel (0.06㎞)
    더보기

    Section 7 (T/K) of the Geum River Revival Project

    Order
    Daejeon Regional Construction and Management Administration, Korea Water Resources Corporation
    Period
    2009.10~2011.12
    Scale
    - Length: 26.3km - Natural river improvement Improvement of the river channel (10.2 million ㎥) 18 interbed-storage protection structures 4 pier protection structures 52 drainage and sluice gates 4 water pumps and distribution system - Ecological stream - Multi-purpose movable weir (L=260M, H=7M) - pump/storage power station (1500KW×2기) - Structure (superintendent’s office)
    더보기

    Construction of Section 1-1 of the Honam High-Speed Railroad

    Order
    Korea Rail Network Authority
    Period
    2009.05~2013.05
    Scale
    - Total length: 7.9Km - Earthwork: 3.2Km - Bridges: 3.5Km (6 locations) - Tunnel: 1.16Km (NATM)
    더보기
  • Asan Beabang Area Development Project Section 3

    Order
    Korea National Housing Corporation
    Period
    2006.02~2009.04
    Scale
    Complex Construction:908,000m2 Drain pipe :17km, Conduit :1.4km Pavement :1,500a, Bridge :River Bridge 3ea (L=265m) IPC Girder 1 ea(L=40m) River work:594m
    더보기

    Gageum-Chilgeum Road Expansion and Pavement Project

    Order
    Chungju-city
    Period
    2005.03~2010.03
    Scale
    Total : Total Expansion 6.9Km(Road 6.13Km, Bridge 786m/3ea) Alternative: Road 1.094km(B=12.5~35m), Bridge 680/1ea)
    더보기

    Seosan-Gobuk Detour Road Construction

    Order
    Deajeon Regional Homeland Management Agency
    Period
    2002.09~2006.09
    Scale
    Road Construction and Pavement L = 4.18 km B = 20.0 m Bridge works: Bridge 220 m / 4 ea Drainage Work: Conduit 378 m / 12 ea, Drainage Pipe 868 m / 19 ea
  • Janghang Line (Onyang spa~Janghang) Section 1-1 Road Bed Improvement Project

    Order
    KORAIL
    Period
    2001.11~2006.12
    Scale
    Total Expansion: Cheongi ( current)16km220~23km680 (L = 7.46Km) Earth Work: Cutting 763,891 m3 Head up 498,815 m3 Bridge Work: 7 Bridges 1,185m, 2nd Onyangoncheon Elevated Bridge 982m, Hangmok Elevated Bridge 173m, Culvert 5ea Tunnel Work: 3 Tunnels 3,730m, Deuksan Tunnel 640m, Shinchang Tunnel 2,840m Dogo Tunnel 250m Station: 1 ea (Shinchang Station) Grade Seperation: 2ea

    Hongsan-Guryong Road Expansion and Pavement

    Order
    Deajeon Regional Homeland Management Agency
    Period
    2001.10~2006.12
    Scale
    Road Expansion and pavement L=12.88km Earth Work: Cutting 976,125㎥, Banking 1,370,510㎥ Bridge work : 21 Bridges/687m Pavement Work : Surface3,624a
    더보기

    Chungwon-Sangju Highway Section 3 Construction

    Order
    Korea Expressway Corp.
    Period
    2001.09~2006.09
    Scale
    Road Expantion L = 8.6 km Earth work : Cutting 3,050,000 m3, Banking 3,030,000 m3 Constrruction Work : 7 Long-span Bridges / 3,170 m, 8 Small Bridges / 250 m Tunnel Work : 3 ea / 2,402 m
    더보기

Yesan New Material Complex Development Project

  • Yesan New Material Complex Development Project
The Business Performance details view. can you check Work Scope, Order, Period
· Order Yesan New Material Complex Development Co.,ltd
· Period 2016.12~2017.02
· Scale - Earthwork : cut 996,068㎥, embankment 841,760㎥ - Rainy work(D450~D1500) : L=4,054m - Sewage work(D300) : L=2,595m - Waterworks construction(D100) : L=3,459m - Paving work : 56,200㎡ - Landscape work : park and greenery construction - electric work, etc

Median line Dodam- Youngcheon second double track train roadbed construction tools

The Business Performance details view. can you check Work Scope, Order, Period
· Location Daegang-myeon, Danyang-gun, Chungbuk ~ Punggi-eup, Yeongju-si, Gyeongbuk, Korea.
· Order Korea Rail Network Authority
· Period 2014.01~2017.06
· Scale [ Total length : L = 14.675㎞] - Tunnel : L = 11.165㎞ (2 points inclined Gang) - Earthwork : L = 2.850㎞ - Bridge : L = 0.660㎞ (5 places) - Orbit : Main Line

Seongmun national industrial complex wastewater treatment plant construction work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sambong-ri, Seongmun-myeon, Dangjin-gun, Chungcheongnam-do, Korea
· Order LH Corporation
· Period 2012.06~2016.12
· Scale - Management equipment and copper, water treatment facilities - East Building Ground Floor 1,2 - Inflow pipe (D800mm, L = 79m) - Discharge pipe Athletics period D700mm, L = 666m : Maritime zone D700mm, L = 824m

Construction of the roadbed for section 2-2 of the Honam High-Speed Railway

The Business Performance details view. can you check Work Scope, Order, Period
· Location 358, Sindang-ri, Gwangseok-myeon, Nonsan, Southern Chungcheong-do
· Order Korea Rail Network Authority
· Period 2009.11~2013.06
· Scale - Length 10.3km - 6 bridges (5.34㎞) - Earthwork: 8 locations (4.90㎞) - One tunnel (0.06㎞)

Section 7 (T/K) of the Geum River Revival Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 890, Cheongryong-ri, Euidang-myeon, Gongju, Southern Chungcheong-do
· Order Daejeon Regional Construction and Management Administration, Korea Water Resources Corporation
· Period 2009.10~2011.12
· Scale - Length: 26.3km - Natural river improvement Improvement of the river channel (10.2 million ㎥) 18 interbed-storage protection structures 4 pier protection structures 52 drainage and sluice gates 4 water pumps and distribution system - Ecological stream - Multi-purpose movable weir (L=260M, H=7M) - pump/storage power station (1500KW×2기) - Structure (superintendent’s office)

Construction of Section 1-1 of the Honam High-Speed Railroad

The Business Performance details view. can you check Work Scope, Order, Period
· Location 269-6, Darak-ri, Gangnae-myeon, Cheongwon-gun, Northern Chungcheong-do
· Order Korea Rail Network Authority
· Period 2009.05~2013.05
· Scale - Total length: 7.9Km - Earthwork: 3.2Km - Bridges: 3.5Km (6 locations) - Tunnel: 1.16Km (NATM)

Asan Beabang Area Development Project Section 3

The Business Performance details view. can you check Work Scope, Order, Period
· Location Baebang-myeon, Asan-si, Chungnam
· Order Korea National Housing Corporation
· Period 2006.02~2009.04
· Scale Complex Construction:908,000m2 Drain pipe :17km, Conduit :1.4km Pavement :1,500a, Bridge :River Bridge 3ea (L=265m) IPC Girder 1 ea(L=40m) River work:594m

Gageum-Chilgeum Road Expansion and Pavement Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gaguem-myeon ~ Chilgum-dong area, Chungju-si, Chungbuk
· Order Chungju-city
· Period 2005.03~2010.03
· Scale Total : Total Expansion 6.9Km(Road 6.13Km, Bridge 786m/3ea) Alternative: Road 1.094km(B=12.5~35m), Bridge 680/1ea)

Seosan-Gobuk Detour Road Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Shinsong-ri~Shingsang-ri, Gobuk-myeon, Seosan-si, Chungnam
· Order Deajeon Regional Homeland Management Agency
· Period 2002.09~2006.09
· Scale Road Construction and Pavement L = 4.18 km B = 20.0 m Bridge works: Bridge 220 m / 4 ea Drainage Work: Conduit 378 m / 12 ea, Drainage Pipe 868 m / 19 ea

Janghang Line (Onyang spa~Janghang) Section 1-1 Road Bed Improvement Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Bangchuk-dong, Duksan-dong, Shinchang-myeon, Dogo-myeon area, Asan-si
· Order KORAIL
· Period 2001.11~2006.12
· Scale Total Expansion: Cheongi ( current)16km220~23km680 (L = 7.46Km) Earth Work: Cutting 763,891 m3 Head up 498,815 m3 Bridge Work: 7 Bridges 1,185m, 2nd Onyangoncheon Elevated Bridge 982m, Hangmok Elevated Bridge 173m, Culvert 5ea Tunnel Work: 3 Tunnels 3,730m, Deuksan Tunnel 640m, Shinchang Tunnel 2,840m Dogo Tunnel 250m Station: 1 ea (Shinchang Station) Grade Seperation: 2ea

Hongsan-Guryong Road Expansion and Pavement

The Business Performance details view. can you check Work Scope, Order, Period
· Location Bokdaeri, Pangyo-myeon, Seocheon-gun~Dongbang-ri, Guryong-myeon, Buyeo-gun, Chungnam
· Order Deajeon Regional Homeland Management Agency
· Period 2001.10~2006.12
· Scale Road Expansion and pavement L=12.88km Earth Work: Cutting 976,125㎥, Banking 1,370,510㎥ Bridge work : 21 Bridges/687m Pavement Work : Surface3,624a

Chungwon-Sangju Highway Section 3 Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Songpyung-ri, Hoibuk-myeon, Boeun-gun, Chungbuk
· Order Korea Expressway Corp.
· Period 2001.09~2006.09
· Scale Road Expantion L = 8.6 km Earth work : Cutting 3,050,000 m3, Banking 3,030,000 m3 Constrruction Work : 7 Long-span Bridges / 3,170 m, 8 Small Bridges / 250 m Tunnel Work : 3 ea / 2,402 m