We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Gimje in vitro alternative Route detours(Heungsa-Yeonjeong) construction

    Order
    Iksan Regional Construction Management Administration
    Period
    2009.06~2016.05
    Scale
    - Extended 10.32km (B = 20m) - Bridge 21 places (801m) - Cloverleaf 4 places - Culvert 58 points (1,815m) - Soft ground 4.07㎞
    더보기

    Construction of the Korea F-1 International Circuit

    Order
    Korea Auto Valley Corporation
    Period
    2008.06~2011.03
    Scale
    - Site preparation (soft ground): 560,000 pyeong - Key facilities: Race track 5.615Km, Grand stand (16,000 spectators) and 22 other buildings, 3 bridges
    더보기

    Kwangyang Port West-side Connection Railway Construction Project

    Order
    MOMAF Yeosu Regioanl Maritime Affairs & Port Office
    Period
    2005.12~2009.09
    Scale
    Total Expansion 7.205km Earth work : 5.632km, Tunnel 0.890km/3ea, Bridge : 0.683km/5 ea Soil improving work 1set, signal station 1ea, railway station to transport containers 2ea
    더보기
  • New Harbor in Gunjang South Quay Wall (Section 3) Construction

    Order
    Kunsan Regional Maritime Affairs & Fisheries Office
    Period
    2005.12~2010.06
    Scale
    ◆ Major Work ○ Quay Wall Work: 50,000 D.W.T 2 berths (L=560M) 30,000 D.W.T 1 berth (L=240M) ○ Background Site: 452,000M² (Revetment: 173M) ○ Dreading and Back Filling Work: 5,323,000M³ ○ Pavement Work: 4,006a
    더보기

    Yeosu city Detour Road (Woodu~Jongwha) Construction

    Order
    Iksan Regional Homeland Management Agency
    Period
    2005.07~2010.06
    Scale
    Total : Total Expansion 1.94km(Tunnel 190km/1 ea, Bridge 630m/1ea) Alternative : Expansion 0,87km(Bridge 630m(2nd Dolsan Bridge )/1ea)

    Gwangju Stream Purification Project

    Order
    Gwangju
    Period
    2004.12~2009.12
    Scale
    Gwangju River Maintenance : L = 19.15km Bridge : 1 ea Water facility and Conveying Pump center
    더보기
  • Gwangju Stream Purification Project

    Order
    Gwangju City
    Period
    2004.12~2009.12
    Scale
    Facility to Secure Additional Preservation Water (Conveying Pump Center and Conveying Pipe Road 18.4km) Stream Purification:19.15km (Gwangju River 18.2km, Jeungshimsa River 0.95km) Space and Ecological Environment Creation (Gwangju River:18.2km) Removal and New Construction of Gwangju Bridge (3 spans Rigid Frame Bridge, Expansion 60m, Width 15~36m) Facility to Secure Flood Allowance Amounts 3.6km Gwangchecon 2 Bridge Under-Road Construction (L=476m) Bridge View Improvement (3 Bridge View Lightings, Street Light 2.6km) Security, Sound Facility, Fountain and others
    더보기

    Jeonju-Gwangyang National Highway No. 27 Construction

    Order
    Korea Expressway Corporation
    Period
    2004.12~2011.12
    Scale
    - Earth Work: Cutting: 2,153,000 ㎥ Banking: 2,206,000 ㎥ - Drainage Work: Drainage Pipeline : 54ea/1,799M Conduit : 23ea/973M - Structure Work: Bridge: 10ea/1261M - Pavement Work Concrete Pavement : 49,000㎥ Asphalt Pavement: 763 a - Tunnel Work: 2ea/268M - Related Facility: Entrance 2ea(Jeonju JCT, East Jeonju IC)

    Bosung-Imsungri Railway Section 2 (Jangheung~Jangdong)

    Order
    Korea Rail Network Authority
    Period
    2003.12~2009.12
    Scale
    1. Earth Work - Spoil 816,414㎥ 2. Bridge Work - Busan Bridge (Corrugated Steel Arch Bridge) : L= 10m - Simok Bridge (Concrete Arch Bridge) : L= 23m 3.Tunnel Work - Bukkyo Tunnel (Open Cut+NATM): L=1,940m - Jangdong Tunnel (Open Cut+NATM): L=5,960m
  • Bosung-Imseongri second tool(Jangdong- Jangheung) Railway construction

    Order
    Korea Rail Network Authority
    Period
    2003.12~2016.12
    Scale
    - Construction extension L = 8.12km - Earthwork : 3 points clippers 22,895m3, Sato 816,414m3, ditches bet, 4 points the way bet, L = 12m Catholics in one place - Tunnel : two places , L = 7,900m [ Nationalities tunnel L = 1,944m, nutation tunnel L = 5,954m vertical gang one place ; - Bridge : 2 points , L = 34.4m [ Simok bridge L = 23.4m Concrete Frame Bridge , Busan corrugated steel pipe arch bridge L = 10m ; - Orbit : L = 8.12km - Additional balls: one way

    Junra Line (Yeocheon-Yeosu) Railroad Improvement Construction

    Order
    KORAIL
    Period
    2003.06~2009.06
    Scale
    Railway Road Bed 10,377m Bridge work 600M 1ea Tunnel work 7,450m 2ea

    Junra Line (Sungsan-Shinpoong) Railroad Improvement Construction

    Order
    KORAIL
    Period
    2002.12~2008.12
    Scale
    Total Expanstion 12.547Km Main Track 9.589Km Delta Track 2.957Km Earth Work: Cutting 802,436 m3 head-up 999,758m3 Bridge work: 8ea 350m Tunnel Work: 3ea 4,774Km(NATM) 2 Stations
    더보기

Gimje in vitro alternative Route detours(Heungsa-Yeonjeong) construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Baeksan-myeon, Gimje-si, Jeollabuk-do, Korea
· Order Iksan Regional Construction Management Administration
· Period 2009.06~2016.05
· Scale - Extended 10.32km (B = 20m) - Bridge 21 places (801m) - Cloverleaf 4 places - Culvert 58 points (1,815m) - Soft ground 4.07㎞

Construction of the Korea F-1 International Circuit

The Business Performance details view. can you check Work Scope, Order, Period
· Location 745-1, Sampo-ri, Samho-eup, Yeongam-gun, Southern Jeolla-do
· Order Korea Auto Valley Corporation
· Period 2008.06~2011.03
· Scale - Site preparation (soft ground): 560,000 pyeong - Key facilities: Race track 5.615Km, Grand stand (16,000 spectators) and 22 other buildings, 3 bridges

Kwangyang Port West-side Connection Railway Construction Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Phase 3 of Container wharf between Chonam-ri, Gwangyang-si, Junnam and Gwangyang Port Container Pier Phase 3 Front
· Order MOMAF Yeosu Regioanl Maritime Affairs & Port Office
· Period 2005.12~2009.09
· Scale Total Expansion 7.205km Earth work : 5.632km, Tunnel 0.890km/3ea, Bridge : 0.683km/5 ea Soil improving work 1set, signal station 1ea, railway station to transport containers 2ea

New Harbor in Gunjang South Quay Wall (Section 3) Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Construction Area for New Harbor In Gunjang, Osikdo-dong ,Gunsan-si, Jeonbuk
· Order Kunsan Regional Maritime Affairs & Fisheries Office
· Period 2005.12~2010.06
· Scale ◆ Major Work ○ Quay Wall Work: 50,000 D.W.T 2 berths (L=560M) 30,000 D.W.T 1 berth (L=240M) ○ Background Site: 452,000M² (Revetment: 173M) ○ Dreading and Back Filling Work: 5,323,000M³ ○ Pavement Work: 4,006a

Yeosu city Detour Road (Woodu~Jongwha) Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Woodu-ri~Jonghwa-dong, Dolsan-eub, Yeosu-si, Junnam
· Order Iksan Regional Homeland Management Agency
· Period 2005.07~2010.06
· Scale Total : Total Expansion 1.94km(Tunnel 190km/1 ea, Bridge 630m/1ea) Alternative : Expansion 0,87km(Bridge 630m(2nd Dolsan Bridge )/1ea)

Gwangju Stream Purification Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yongyeon-dong, Dong-gu~Yucheon-dong, Seo-gu, Gwangju
· Order Gwangju
· Period 2004.12~2009.12
· Scale Gwangju River Maintenance : L = 19.15km Bridge : 1 ea Water facility and Conveying Pump center

Gwangju Stream Purification Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gwangju Stream : Yongyeon Filteration Plant, Yongyeon-dong ,Dong-gu, Gwangju ~The Confluence of Yeongsangang, Yuduk-dong, Seo-gu, Gwangju
· Order Gwangju City
· Period 2004.12~2009.12
· Scale Facility to Secure Additional Preservation Water (Conveying Pump Center and Conveying Pipe Road 18.4km) Stream Purification:19.15km (Gwangju River 18.2km, Jeungshimsa River 0.95km) Space and Ecological Environment Creation (Gwangju River:18.2km) Removal and New Construction of Gwangju Bridge (3 spans Rigid Frame Bridge, Expansion 60m, Width 15~36m) Facility to Secure Flood Allowance Amounts 3.6km Gwangchecon 2 Bridge Under-Road Construction (L=476m) Bridge View Improvement (3 Bridge View Lightings, Street Light 2.6km) Security, Sound Facility, Fountain and others

Jeonju-Gwangyang National Highway No. 27 Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Starting Point :Geumsang-dong ,Deokjin-gu, Jeonju-si, Jeonbuk Ending Point: Yongheung-ri ,Yongjin-myeon ,Wanju-gun, Jeonbuk
· Order Korea Expressway Corporation
· Period 2004.12~2011.12
· Scale - Earth Work: Cutting: 2,153,000 ㎥ Banking: 2,206,000 ㎥ - Drainage Work: Drainage Pipeline : 54ea/1,799M Conduit : 23ea/973M - Structure Work: Bridge: 10ea/1261M - Pavement Work Concrete Pavement : 49,000㎥ Asphalt Pavement: 763 a - Tunnel Work: 2ea/268M - Related Facility: Entrance 2ea(Jeonju JCT, East Jeonju IC)

Bosung-Imsungri Railway Section 2 (Jangheung~Jangdong)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jangdong-myeon ~ Geumsan-ri, Jangheung-eup, Jangheung-gun, Jeollanam-do
· Order Korea Rail Network Authority
· Period 2003.12~2009.12
· Scale 1. Earth Work - Spoil 816,414㎥ 2. Bridge Work - Busan Bridge (Corrugated Steel Arch Bridge) : L= 10m - Simok Bridge (Concrete Arch Bridge) : L= 23m 3.Tunnel Work - Bukkyo Tunnel (Open Cut+NATM): L=1,940m - Jangdong Tunnel (Open Cut+NATM): L=5,960m

Bosung-Imseongri second tool(Jangdong- Jangheung) Railway construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jangdong-myeon, Jangheung-gun, Jeollanam-do, Korea
· Order Korea Rail Network Authority
· Period 2003.12~2016.12
· Scale - Construction extension L = 8.12km - Earthwork : 3 points clippers 22,895m3, Sato 816,414m3, ditches bet, 4 points the way bet, L = 12m Catholics in one place - Tunnel : two places , L = 7,900m [ Nationalities tunnel L = 1,944m, nutation tunnel L = 5,954m vertical gang one place ; - Bridge : 2 points , L = 34.4m [ Simok bridge L = 23.4m Concrete Frame Bridge , Busan corrugated steel pipe arch bridge L = 10m ; - Orbit : L = 8.12km - Additional balls: one way

Junra Line (Yeocheon-Yeosu) Railroad Improvement Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yeosu-si area, Junnam
· Order KORAIL
· Period 2003.06~2009.06
· Scale Railway Road Bed 10,377m Bridge work 600M 1ea Tunnel work 7,450m 2ea

Junra Line (Sungsan-Shinpoong) Railroad Improvement Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Hearong-myeon, Suncheon-si and Yulcho-myeon, Yeosu-si area, Junnam
· Order KORAIL
· Period 2002.12~2008.12
· Scale Total Expanstion 12.547Km Main Track 9.589Km Delta Track 2.957Km Earth Work: Cutting 802,436 m3 head-up 999,758m3 Bridge work: 8ea 350m Tunnel Work: 3ea 4,774Km(NATM) 2 Stations