  • Ulsan reserve base underground structure construction

    Order
    Korea National Oil Corporation
    Period
    2016.01~2020.12
    Scale
    - Civil : 1,030 million barrels of crude oil storage ( excavation volume : 189 million ㎥) - Mechanical : Oil / effusion can peomgak 8 , Fire / integer / non- waste - Electricity: process control equipment, measuring equipment outside the cave yuwi - Construction: haengjeongdong 13 buildings and support facilities - Parks and green space construction type 1
    더보기

    Busan Metro ( ever- lower) 1 tool construction

    Order
    Busan Transportation Corporation
    Period
    2015.12~2020.11
    Scale
    ○ Total length : 1.495km - Station ( 2 places ): 94.9m - Line ( excavation ): 1,332.7m - Main vents ( 4 places ): 67.4m - Mechatronics Corporation one way
    더보기

    Buoy Ulsan Relocation Corporation ( including Donghae-1 gas pipeline relocation )

    Order
    Korea National Oil Corporation
    Period
    2015.07~2017.10
    Scale
    ○New pipelines and oil relocation Buoy -BUOY Relocation : SPM Refur - New pipeline (3.6km), remove the existing pipeline (0.6km) ○ Pipeline relocation - New gas pipeline (5.6km), remove the existing pipe (1.7km) ○ 1 construction type (operating bases) ○ Soil Improvement : DCM Corporation (364m X 32m)
    더보기
  • Donghae line Pohang~Samcheok railway construction roadbed construction tools Article 11

    Order
    Korea Rail Network Authority
    Period
    2015.01~2019.01
    Scale
    - Extending a total of 9.050km ( disconnection) - Earthwork 2.964km - Bridge 2 places (0.465km) - Tunnel 4 places (5.621km) - Station 1 point (146m)
    더보기

    Bujeon- Masan Double Track Railway Concession construction

    Order
    Smart Rail Corp.,
    Period
    2014.05~2020.06
    Scale
    - Earthwork : L = 11.5㎞ - Bridge : L = 6.1㎞ ( up Nakdong River Bridge, Bridge joman Kanto Bridge, New Moon bridges , etc.) - Tunnel : L = 13.0㎞ (Shield: 2.7㎞, NATM: 10.3㎞) - Station 5 points ( failure, ideas , BM01, BM02, Jiang ) - Sharing section : L = 2.2㎞ - A signal in two places ( chilsan , jinrye )
    더보기

    Highway above the 14 line between Ulsan , Miryang - construction (fifth section)

    Order
    Korea Highway Corporation
    Period
    2014.02~2021.02
    Scale
    Total length L = 8.02km 1) Tunnel : 7,947km / 1 places 2) Earthwork : Cut 168,652m3 3) drain hole : the drain pipe (55.9m / 5 places) , culverts (15.6m / 1 places) 4) Ball Packaging : Packaging of cement (50,330m3), asphalt concrete pavement (3a) 5) ball bag : 1 set
    더보기
  • Bujeon~Masan double track electrification private capital project

    Order
    Smart Rail
    Period
    2013.02~2019.01
    Scale
    Earthwork: 11.5km Bridges: 6.1km (West Nakdong River Bridge, Joman Bridge, Gwandong Bridge, Sinwol Bridge, etc.) Tunnels: 13.0km (Shield 2.7km, NATM 10.3km) (Shield Nakdong Tunnel) (NATM ? Gaehwa Tunnel, Geumbyeong Tunnel, Yuha Tunnel) Stations: 5 (Bujeon, Sasang, Gimhae Airport, Garak IC and Jangyu) Signal boxes: 2 (Chilsan Signal Box, Jinrye Signal Box)

    Janglim - Jinhae main pipe construction

    Order
    Korea Gas Corporation
    Period
    2012.10~2016.03
    Scale
    Buried main pipe : 30"" ""× 16.96km - Supply Bureau : 2 new locations ( Chinhae G / S, the signal B / V) - Proven testing, installation and operation yard
    더보기

    Geoje - Masan construction Route 3

    Order
    Busan Regional Construction Management Administration
    Period
    2012.07~2020.06
    Scale
    - Extension 6.4km (B = 20.0m, round 4 lanes ) - Cut 1.25 million ㎥ - Fill 890 000 ㎥ - Sato 710 000 ㎥ - Culvert nine places (462m) - Bridge 11 points (1.88km) - 5 points tunnel (1.91km) - Packaging gongoe
    더보기
  • Construction of counter facilities to improve the calmness of Gamcheon Port

    Order
    Busan Port Construction Office, Busan Regional Maritime Affairs and Port Office
    Period
    2011.03~2013.09
    Scale
    - South breakwater (new): L=350m - Training dike (new): L=240m - Reinforcement of the existing East-West breakwater - Other appurtenant work
    더보기

    Daegu Line East Daegu and Youngchun roadbed double-track first tool, a Corporation

    Order
    Korea Rail Network Authority
    Period
    2011.02~2016.12
    Scale
    [ Total length : 9.45km] - Earthwork : 2.68km - Bridge : 4.51km (5 places) - Station : 2.26km (2 places) - Temporary Line : 0.66km (1 point)
    더보기

    The tool Highway Route 30 (Sangju-Yeongdeok) Between construction

    Order
    Korea Highway Corporation
    Period
    2010.07~2016.12
    Scale
    - Extended 4.34km - Bridge three places (0.945㎞) - Tunnel 2 points (2.969㎞)
    더보기

Ulsan reserve base underground structure construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Hangnam-ri, Onsan-eup, Ulju-gun, Ulsan, Korea
· Order Korea National Oil Corporation
· Period 2016.01~2020.12
· Scale - Civil : 1,030 million barrels of crude oil storage ( excavation volume : 189 million ㎥) - Mechanical : Oil / effusion can peomgak 8 , Fire / integer / non- waste - Electricity: process control equipment, measuring equipment outside the cave yuwi - Construction: haengjeongdong 13 buildings and support facilities - Parks and green space construction type 1

Busan Metro ( ever- lower) 1 tool construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Busan Sasang Station (Line 2) ~ Gamjeon-dong, Sasang-gu, Busan, Korea
· Order Busan Transportation Corporation
· Period 2015.12~2020.11
· Scale ○ Total length : 1.495km - Station ( 2 places ): 94.9m - Line ( excavation ): 1,332.7m - Main vents ( 4 places ): 67.4m - Mechatronics Corporation one way

Buoy Ulsan Relocation Corporation ( including Donghae-1 gas pipeline relocation )

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dang-wol-ri, Ulju-gun, Ulsan, Korea land and sea area.
· Order Korea National Oil Corporation
· Period 2015.07~2017.10
· Scale ○New pipelines and oil relocation Buoy -BUOY Relocation : SPM Refur - New pipeline (3.6km), remove the existing pipeline (0.6km) ○ Pipeline relocation - New gas pipeline (5.6km), remove the existing pipe (1.7km) ○ 1 construction type (operating bases) ○ Soil Improvement : DCM Corporation (364m X 32m)

Donghae line Pohang~Samcheok railway construction roadbed construction tools Article 11

The Business Performance details view. can you check Work Scope, Order, Period
· Location Wonnam-myeon ~ Geunnam-myeon, Uljin-gun, Gyeongbuk, Korea
· Order Korea Rail Network Authority
· Period 2015.01~2019.01
· Scale - Extending a total of 9.050km ( disconnection) - Earthwork 2.964km - Bridge 2 places (0.465km) - Tunnel 4 places (5.621km) - Station 1 point (146m)

Bujeon- Masan Double Track Railway Concession construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Busanjin-gu ~ Gangseo-gu, Busan, Korea
· Order Smart Rail Corp.,
· Period 2014.05~2020.06
· Scale - Earthwork : L = 11.5㎞ - Bridge : L = 6.1㎞ ( up Nakdong River Bridge, Bridge joman Kanto Bridge, New Moon bridges , etc.) - Tunnel : L = 13.0㎞ (Shield: 2.7㎞, NATM: 10.3㎞) - Station 5 points ( failure, ideas , BM01, BM02, Jiang ) - Sharing section : L = 2.2㎞ - A signal in two places ( chilsan , jinrye )

Highway above the 14 line between Ulsan , Miryang - construction (fifth section)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gorye-ri, Danjang-myeon, Miryang-si ~ Seon-ri, Wondong-myeon, Yangsan-si, Gyeongsangnam-do, Korea
· Order Korea Highway Corporation
· Period 2014.02~2021.02
· Scale Total length L = 8.02km 1) Tunnel : 7,947km / 1 places 2) Earthwork : Cut 168,652m3 3) drain hole : the drain pipe (55.9m / 5 places) , culverts (15.6m / 1 places) 4) Ball Packaging : Packaging of cement (50,330m3), asphalt concrete pavement (3a) 5) ball bag : 1 set

Bujeon~Masan double track electrification private capital project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Bucheon-dong, Busanjin-gu ~ Jinrye-myeon, Gimhae, Southern Gyeongsang-do
· Order Smart Rail
· Period 2013.02~2019.01
· Scale Earthwork: 11.5km Bridges: 6.1km (West Nakdong River Bridge, Joman Bridge, Gwandong Bridge, Sinwol Bridge, etc.) Tunnels: 13.0km (Shield 2.7km, NATM 10.3km) (Shield Nakdong Tunnel) (NATM ? Gaehwa Tunnel, Geumbyeong Tunnel, Yuha Tunnel) Stations: 5 (Bujeon, Sasang, Gimhae Airport, Garak IC and Jangyu) Signal boxes: 2 (Chilsan Signal Box, Jinrye Signal Box)

Janglim - Jinhae main pipe construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Songjeong-dong, Gangseo-gu, Busan, Korea
· Order Korea Gas Corporation
· Period 2012.10~2016.03
· Scale Buried main pipe : 30"" ""× 16.96km - Supply Bureau : 2 new locations ( Chinhae G / S, the signal B / V) - Proven testing, installation and operation yard

Geoje - Masan construction Route 3

The Business Performance details view. can you check Work Scope, Order, Period
· Location Naepo-ri, Gusan-myeon ~ Hyeondong, Masanhappo-gu, Changwon-si, Gyeongsangnam-do, Korea.
· Order Busan Regional Construction Management Administration
· Period 2012.07~2020.06
· Scale - Extension 6.4km (B = 20.0m, round 4 lanes ) - Cut 1.25 million ㎥ - Fill 890 000 ㎥ - Sato 710 000 ㎥ - Culvert nine places (462m) - Bridge 11 points (1.88km) - 5 points tunnel (1.91km) - Packaging gongoe

Construction of counter facilities to improve the calmness of Gamcheon Port

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK E&C, 4th floor, 909-3, Dadae-dong, Saha-gu, Busan
· Order Busan Port Construction Office, Busan Regional Maritime Affairs and Port Office
· Period 2011.03~2013.09
· Scale - South breakwater (new): L=350m - Training dike (new): L=240m - Reinforcement of the existing East-West breakwater - Other appurtenant work

Daegu Line East Daegu and Youngchun roadbed double-track first tool, a Corporation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do ~ Dong-gu, Daegu, Korea
· Order Korea Rail Network Authority
· Period 2011.02~2016.12
· Scale [ Total length : 9.45km] - Earthwork : 2.68km - Bridge : 4.51km (5 places) - Station : 2.26km (2 places) - Temporary Line : 0.66km (1 point)

The tool Highway Route 30 (Sangju-Yeongdeok) Between construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dalsan-myeon, Yeongdeok-gun, Gyeongsangbuk-do, Korea
· Order Korea Highway Corporation
· Period 2010.07~2016.12
· Scale - Extended 4.34km - Bridge three places (0.945㎞) - Tunnel 2 points (2.969㎞)