본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Turkey, 3rd Bosporus Bridge Project

    Order
    ICA Ictas-Astaldi JV
    Period
    2013.06~2016.11
    Scale
    1. The total length of 2,164m ( main span 1,408m), Bridge width 54.4m ( eight lane road + railway 2tracks) 2. A complex geometry pylons world's largest suspension bridge , president of the 322m high
    더보기

    Turkey, Eurasia Tunnel Project

    Order
    ATAS
    Period
    2013.04~2017.03
    Scale
    1. The total length of 14.6 km 2. TBM Tunnel 3.3 km / NATM Tunnel 1.9 km
    더보기

Turkey, 3rd Bosporus Bridge Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location oyrazkoy 3rd bosphorus bridge construction site inside military zone, Beykoz, Istanbul (Asian Side)
· Order ICA Ictas-Astaldi JV
· Period 2013.06~2016.11
· Scale 1. The total length of 2,164m ( main span 1,408m), Bridge width 54.4m ( eight lane road + railway 2tracks) 2. A complex geometry pylons world's largest suspension bridge , president of the 322m high

Turkey, Eurasia Tunnel Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Burhan Felek Caddesi, 1. Cevreyolu Sokak, 34668 Haydarpa?a, Uskudar / ?stanbul
· Order ATAS
· Period 2013.04~2017.03
· Scale 1. The total length of 14.6 km 2. TBM Tunnel 3.3 km / NATM Tunnel 1.9 km