We Build the Great Great Life, Great World

BUSINESS Business Performance

  • HongKong, Central Kowloon Route - Yau Ma Tei West

    Order
    Hong Kong Highways Department
    Period
    2018.11~2025.10
    Scale
    - 7 Interchange Bridges - Underpass 250m - Landscape Deck - Ventilating opening, Soundproof facilities etc.
    더보기

    HongKong, Central Kowloon Route - Yau Ma Tei East

    Order
    Hong Kong Highways Department
    Period
    2018.01~2025.11
    Scale
    - Cut & Cover Tunnel 390m - Access Shaft - Demolition and reconstruction of existing overpass 300m - Soundproof facilities etc.
    더보기

    Vietnam, NSRP Marine Works Project

    Order
    JGCS CONSORTIUM
    Period
    2013.07~2016.07
    Scale
    1. PKG B : Liquid Berth 2. PKG C : Crude Oil Pipelines (48” Pipe L=34.5km, 2 Lines) 3. PKG D : Breakwater(L=1,532m), Revetment (L=916m), Stormwater Outfall(L=216m)
    더보기
  • Singapore, Cable Tunnel EW2 Project

    Order
    SP POWER ASSETS
    Period
    2012.10~2016.12
    Scale
    1. The total length : 6.8km (Slurry TBM: 3 units) 2. Shafts: 4 points (Permanent 3 points , Temporary 1 point) 3. Utility Buildings: 3 points
    더보기

    Singapore, Cable Tunnel NS2 Project

    Order
    SP Power ASSETS
    Period
    2012.10~2018/05
    Scale
    1. totla length : 5.38 km (Slurry TBM : 2대) 2. Shaft 3 points (Permanent 3개소) 3. 3 Buildings (2 Ventilations + 1Equipment)
    더보기

    Singapore, Sentosa Gateway Tunnel Project

    Order
    Land Transport Authority
    Period
    2011.05~2017.03
    Scale
    1. The total length of 2.2km 2. Piped Box Tunnel: 95m + 93m = 188m 3. Cut & Cover Tunnel (D-wall): 830m
    더보기
  • Singapore DTL3 C930 Project

    Order
    Land Transport Authority (LTA)
    Period
    2011.04~2016.12
    Scale
    - TBM Tunnel: 940 m (2Lines) - Cut & Cover Tunnel: 39m - Station 1 location: 148m
    더보기

    India, Padur Oil storage site construction

    Order
    Indian Strategic Petroleum Reserves Limited
    Period
    2010.05~2015.04
    Scale
    1. crude oil storage 1.5MMT, saving Co- : 3.572km
    더보기

    Singapore, Down Town Line 2 C915 Project

    Order
    Land Transport Authority
    Period
    2009.06~2015.12
    Scale
    1. TBM Tunnel: 2.3 km 2 Lane (TBM 3 units) 2. Hume Shell Station: 30m × 164m 3. Cross Passage: Tunnel section 2 points 7 points (NATM) / C & C segment
    더보기
  • Singapore Downtown Line Stage-2 Contract 915

    Order
    Land Transport Authority (LTA)
    Period
    2009.06~2015.11
    Scale
    - TBM Tunnel: 2.3km (Line 2) - Cut & Cover Structure (30m×164m) - Cross Passage (NATM): 9 Nos
    더보기

    SingaporeDowntownLineStage-2Contract915

    Order
    Land Transport Authority (LTA)
    Period
    2009.06~2015.11
    Scale
    - TBM Tunnel : 2.3km (2Line) - Cut & Cover Structure(30m×164m) - Cross Passage(NATM) : 9 Nos

    Construction of the oil storage tank terminal in Mangalore, India

    Order
    ISPRL (Indian Strategic Petroleum Reserves Limited)
    Period
    2009.04~2012.04
    Scale
    - Underground oil storage tank terminal 1.5MMT (1,100 million barrels) - Cavern, Water Curtain Tunnel, Access Tunnel, Operation Shaft - Drilling (2,178,202㎥), reinforcement (rock bolt 2,620ton, shotcrete 342,215㎥, grouting 625MT)
    더보기

HongKong, Central Kowloon Route - Yau Ma Tei West

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yau Ma Tei, Kowloon, Hong Kong
· Order Hong Kong Highways Department
· Period 2018.11~2025.10
· Scale - 7 Interchange Bridges - Underpass 250m - Landscape Deck - Ventilating opening, Soundproof facilities etc.

HongKong, Central Kowloon Route - Yau Ma Tei East

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yau Ma Tei East, Hong Kong
· Order Hong Kong Highways Department
· Period 2018.01~2025.11
· Scale - Cut & Cover Tunnel 390m - Access Shaft - Demolition and reconstruction of existing overpass 300m - Soundproof facilities etc.

Vietnam, NSRP Marine Works Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Nghi Son Economic Zone, Hai Yen Commune, Tinh Gia District, Thanh Hoa Province,Vietnam. (opposite of Nghi Son Police)
· Order JGCS CONSORTIUM
· Period 2013.07~2016.07
· Scale 1. PKG B : Liquid Berth 2. PKG C : Crude Oil Pipelines (48” Pipe L=34.5km, 2 Lines) 3. PKG D : Breakwater(L=1,532m), Revetment (L=916m), Stormwater Outfall(L=216m)

Singapore, Cable Tunnel EW2 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 5 May Road, Singapore 328593
· Order SP POWER ASSETS
· Period 2012.10~2016.12
· Scale 1. The total length : 6.8km (Slurry TBM: 3 units) 2. Shafts: 4 points (Permanent 3 points , Temporary 1 point) 3. Utility Buildings: 3 points

Singapore, Cable Tunnel NS2 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 15a Ang Mo Kio Avenue 1 singapore
· Order SP Power ASSETS
· Period 2012.10~2018/05
· Scale 1. totla length : 5.38 km (Slurry TBM : 2대) 2. Shaft 3 points (Permanent 3개소) 3. 3 Buildings (2 Ventilations + 1Equipment)

Singapore, Sentosa Gateway Tunnel Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Telok Blangah Road (Beside Prima Flour Mill)
· Order Land Transport Authority
· Period 2011.05~2017.03
· Scale 1. The total length of 2.2km 2. Piped Box Tunnel: 95m + 93m = 188m 3. Cut & Cover Tunnel (D-wall): 830m

Singapore DTL3 C930 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 40A Ubi Avenue 2, Singapore 408900
· Order Land Transport Authority (LTA)
· Period 2011.04~2016.12
· Scale - TBM Tunnel: 940 m (2Lines) - Cut & Cover Tunnel: 39m - Station 1 location: 148m

India, Padur Oil storage site construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Padur, Karnataka India
· Order Indian Strategic Petroleum Reserves Limited
· Period 2010.05~2015.04
· Scale 1. crude oil storage 1.5MMT, saving Co- : 3.572km

Singapore, Down Town Line 2 C915 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 320A Upper Bukit Timah Road Singapore 588217
· Order Land Transport Authority
· Period 2009.06~2015.12
· Scale 1. TBM Tunnel: 2.3 km 2 Lane (TBM 3 units) 2. Hume Shell Station: 30m × 164m 3. Cross Passage: Tunnel section 2 points 7 points (NATM) / C & C segment

Singapore Downtown Line Stage-2 Contract 915

The Business Performance details view. can you check Work Scope, Order, Period
· Location 200 Petir Road, Singapore, 678271, SK E&C Project Office
· Order Land Transport Authority (LTA)
· Period 2009.06~2015.11
· Scale - TBM Tunnel: 2.3km (Line 2) - Cut & Cover Structure (30m×164m) - Cross Passage (NATM): 9 Nos

SingaporeDowntownLineStage-2Contract915

The Business Performance details view. can you check Work Scope, Order, Period
· Location 200 Petir Road Singapore 678271 SK E&C Project Office
· Order Land Transport Authority (LTA)
· Period 2009.06~2015.11
· Scale - TBM Tunnel : 2.3km (2Line) - Cut & Cover Structure(30m×164m) - Cross Passage(NATM) : 9 Nos

Construction of the oil storage tank terminal in Mangalore, India

The Business Performance details view. can you check Work Scope, Order, Period
· Location Chandrahas Nagar, Permude, Bajpe, Mangalore
· Order ISPRL (Indian Strategic Petroleum Reserves Limited)
· Period 2009.04~2012.04
· Scale - Underground oil storage tank terminal 1.5MMT (1,100 million barrels) - Cavern, Water Curtain Tunnel, Access Tunnel, Operation Shaft - Drilling (2,178,202㎥), reinforcement (rock bolt 2,620ton, shotcrete 342,215㎥, grouting 625MT)