  • Hwaseong-Jeongnam Industrial Complex Development Project

    Order
    Hwaseong Jeongnam general industrial complex
    Period
    2016.07~2018.06
    Scale
    [ 17 pyeong industrial complex ] - Earthwork : 1,200,000㎥ - Constant ball : L = 3,634m - Excellent ball : L = 4,738m - Sewage ball : L = 4,515m - Ball Packaging : 59,069㎡ - Landscaping , street lighting and traffic light one way
    더보기

    Subway Jinjeop line(Danggogae ~ jinjeop ) double-track train the first tool construction

    Order
    Korea Rail Network Authority
    Period
    2015.06~2019.12
    Scale
    [ Total length L = 4.576Km] - Tunnel 3.801Km / 1 places - Station ( underground layer 3 ) 0.203Km / 1 places - Excavation Box 0.270Km - Main supply and exhaust ventilation small four places - Substations and other function rooms
    더보기

    The Metropolitan Rail (Suseo~Pyeongtaek) Article 8 Other new tools roadbed construction

    Order
    Korea Rail Network Authority
    Period
    2012.01~2016.06
    Scale
    - Earthwork : 1,694m - U-Type: 486m - Excavation BOX: 100m - Excavation tunnel : 660m - NATM: 722m - Stereoscopic viaducts : one place
    더보기
  • Opo-Pogok period (2nd) extended road paving work

    Order
    Construction Headquarters, Gyeonggi Province
    Period
    2011.11~2017.10
    Scale
    Road extension : 6.2Km, 4 car (B = 18.5m) - 2 points span bridge (720m) - Sogyoryang 11 points (453.5m) - Cloverleaf four places ( Pogok IC, Sinwon IC, Dongrim IC, Rngwon IC)
    더보기

    Construction of the 2nd phase facilities of the 2nd Osan Runway

    Order
    Defense Installation Agency
    Period
    2011.04~2013.09
    Scale
    - 2nd runway 2,743m, taxiway 470m - Rainwater pipes and culverts 10,146m - Water supply and drainage pipes 6,957m - Patriot/Vulcan cannon command post, accommodations and 33 buildings, Total area3,782㎡ - Flood control pump and air-conditioning, sanitary facilities - Electrical, communication and fire-fighting facilities
    더보기

    Construction of Section 918 of Phase-III of Seoul Subway Line 9

    Order
    Seoul Metropolitan Infrastructure Headquarters
    Period
    2010.02~2016.02
    Scale
    - Subway length L=1.29㎞ - 1 station - 3 ventilation openings
    더보기
  • Phase 3 to build 918 Seoul Subway Line 9 Corporation

    Order
    The Seoul Metropolitan Office of Urban Infrastructure Division
    Period
    2010.02~2017.02
    Scale
    - Metro extension L = 1.29㎞ - 3 points excavation zone - Stops in one place - Vent 3 points - 2 points tunnel
    더보기

    Paengseong - Oseong road construction

    Order
    Busan Jinhae Free Economic Zone Authority
    Period
    2009.12~2016.12
    Scale
    [ Chapter opened L = 5.60km] (B = 27.00m 6 round trip by car) - Section Sat : 410,348㎥, - Sat. gender : 1,189,673㎥, net banking : 1,237,332㎥ - Cancer going : 1,156m / 25 points, - Drain : 1,608m / 33 points - Sogyoryang : 137m / 5 points, - Span bridge : 1,210m / 1 places (Pyeongtaek Bridge: 110 + 160 + 90 + 50 @ 6 cursed tower cable-stayed bridge girder + PF ) - Ball Packaging Others
    더보기

    Yongma Privately Financed Construction Projects a tunnel.

    Order
    Yongma tunnel Corp.,
    Period
    2009.11~2014.11
    Scale
    - Extension L = 3.56km - 1 point tunnel (2.5km) - Three places Bridges
    더보기
  • Incheon Metropolitan Urban Railroad Line2

    Incheon Metropolitan Urban Railroad Line2

    Order
    Incheon Metropolitan City
    Period
    2009.06~2016.10
    Scale
    - Total Length 1.890km - Tunnel 1.630km - Station 2ea - Ventilation 6ea
    Perform Form
    Bidding
    더보기

    Construction (T/K) of facilities in Section 6 of the Gyeongin Ara Waterway Project

    Order
    Korea Water Resources Corporation
    Period
    2009.06~2011.12
    Scale
    - 4 container berths: 1.2km - Sore protection: 4,923m - Road facilities: 5.8km/10 location - Han River floodgate: 5 mitergates - Unloading facilities: (2 WSG cranes) - Structures: Passenger terminal bldg. and 8 other buildings
    더보기

    Construction of the electric power tunnel for supply of electric power to the Gangnam area (Nonil-Nonhyeon)

    Order
    KEPCO
    Period
    2008.12~2014.08
    Scale
    - Electric power tunnel L=3.344km - Increases power supply capacity to match increasing demand for electric power in Seocho-gu and Gangnam-gu, Seoul
    더보기

Hwaseong-Jeongnam Industrial Complex Development Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jeongnam-myeon, Hwaseong-si, Gyeonggi-do, Korea
· Order Hwaseong Jeongnam general industrial complex
· Period 2016.07~2018.06
· Scale [ 17 pyeong industrial complex ] - Earthwork : 1,200,000㎥ - Constant ball : L = 3,634m - Excellent ball : L = 4,738m - Sewage ball : L = 4,515m - Ball Packaging : 59,069㎡ - Landscaping , street lighting and traffic light one way

Subway Jinjeop line(Danggogae ~ jinjeop ) double-track train the first tool construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sanggye-dong, Nowon-gu, Seoul. ~ Jinjeop-eup, Namyangju-si, Gyeonggi-do, Korea
· Order Korea Rail Network Authority
· Period 2015.06~2019.12
· Scale [ Total length L = 4.576Km] - Tunnel 3.801Km / 1 places - Station ( underground layer 3 ) 0.203Km / 1 places - Excavation Box 0.270Km - Main supply and exhaust ventilation small four places - Substations and other function rooms

The Metropolitan Rail (Suseo~Pyeongtaek) Article 8 Other new tools roadbed construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jije-dong, Pyeongtaek-si, Gyeonggi-do, Korea
· Order Korea Rail Network Authority
· Period 2012.01~2016.06
· Scale - Earthwork : 1,694m - U-Type: 486m - Excavation BOX: 100m - Excavation tunnel : 660m - NATM: 722m - Stereoscopic viaducts : one place

Opo-Pogok period (2nd) extended road paving work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Pogok-eup, Cheoin-gu, Yongin-si, Gyeonggi-do, Korea
· Order Construction Headquarters, Gyeonggi Province
· Period 2011.11~2017.10
· Scale Road extension : 6.2Km, 4 car (B = 18.5m) - 2 points span bridge (720m) - Sogyoryang 11 points (453.5m) - Cloverleaf four places ( Pogok IC, Sinwon IC, Dongrim IC, Rngwon IC)

Construction of the 2nd phase facilities of the 2nd Osan Runway

The Business Performance details view. can you check Work Scope, Order, Period
· Location 700, Jeokbong-ri, Seotan-myeon, Pyeongtaek, Gyeonggi Province
· Order Defense Installation Agency
· Period 2011.04~2013.09
· Scale - 2nd runway 2,743m, taxiway 470m - Rainwater pipes and culverts 10,146m - Water supply and drainage pipes 6,957m - Patriot/Vulcan cannon command post, accommodations and 33 buildings, Total area3,782㎡ - Flood control pump and air-conditioning, sanitary facilities - Electrical, communication and fire-fighting facilities

Construction of Section 918 of Phase-III of Seoul Subway Line 9

The Business Performance details view. can you check Work Scope, Order, Period
· Location Seongji Bldg., 193-9, Jamsil-dong, Songpa-gu, Seoul
· Order Seoul Metropolitan Infrastructure Headquarters
· Period 2010.02~2016.02
· Scale - Subway length L=1.29㎞ - 1 station - 3 ventilation openings

Phase 3 to build 918 Seoul Subway Line 9 Corporation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Samjeon-dong (District) at Jamsil hospital ~ 86, Jamsil-dong, Songpa-gu, Seoul, Korea ~
· Order The Seoul Metropolitan Office of Urban Infrastructure Division
· Period 2010.02~2017.02
· Scale - Metro extension L = 1.29㎞ - 3 points excavation zone - Stops in one place - Vent 3 points - 2 points tunnel

Paengseong - Oseong road construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dujeong-ri, Paengseong-eup, Pyeongtaek-si, Gyeonggi-do, Korea
· Order Busan Jinhae Free Economic Zone Authority
· Period 2009.12~2016.12
· Scale [ Chapter opened L = 5.60km] (B = 27.00m 6 round trip by car) - Section Sat : 410,348㎥, - Sat. gender : 1,189,673㎥, net banking : 1,237,332㎥ - Cancer going : 1,156m / 25 points, - Drain : 1,608m / 33 points - Sogyoryang : 137m / 5 points, - Span bridge : 1,210m / 1 places (Pyeongtaek Bridge: 110 + 160 + 90 + 50 @ 6 cursed tower cable-stayed bridge girder + PF ) - Ball Packaging Others

Yongma Privately Financed Construction Projects a tunnel.

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jungnang-gu, Seoul, Korea
· Order Yongma tunnel Corp.,
· Period 2009.11~2014.11
· Scale - Extension L = 3.56km - 1 point tunnel (2.5km) - Three places Bridges

Incheon Metropolitan Urban Railroad Line2

  • Incheon Metropolitan Urban Railroad Line2
The Business Performance details view. can you check Work Scope, Order, Period
· Location Incheon Metropolitan City, Korea
· Order Incheon Metropolitan City
· Period 2009.06~2016.10
· Scale - Total Length 1.890km - Tunnel 1.630km - Station 2ea - Ventilation 6ea
· Perform Form Bidding

Construction (T/K) of facilities in Section 6 of the Gyeongin Ara Waterway Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 454-24, Singok-ri, Gochon-eup, Gimpo, Gyeonggi-do
· Order Korea Water Resources Corporation
· Period 2009.06~2011.12
· Scale - 4 container berths: 1.2km - Sore protection: 4,923m - Road facilities: 5.8km/10 location - Han River floodgate: 5 mitergates - Unloading facilities: (2 WSG cranes) - Structures: Passenger terminal bldg. and 8 other buildings

Construction of the electric power tunnel for supply of electric power to the Gangnam area (Nonil-Nonhyeon)

The Business Performance details view. can you check Work Scope, Order, Period
· Location 7th floor, Yoheyon Building, 242-29, Nonhyeon-2-dong, Gangnam-gu, Seoul
· Order KEPCO
· Period 2008.12~2014.08
· Scale - Electric power tunnel L=3.344km - Increases power supply capacity to match increasing demand for electric power in Seocho-gu and Gangnam-gu, Seoul