  • Sihwa MTV Seohaean Detour Road Construction Project

    Order
    Korea Water Resources Corporation
    Period
    2019.11~2023.08
    Scale
    1 Bridge(688m), 1 Underpass(80m)
    더보기

    Silvertown Tunnel

    Order
    Riverlink
    Period
    2019.11~2025.01
    Scale
    TBM Tunnel 1.4km Cut and Cover Tunnel 0.3km Open-cut Section 0.5km 9 Cross passages 2 Tunnel services buildings 2 Bridges(Overbridge/ Footbridge)
    더보기

    Great Train Express A-Line Section 3, Section 4

    Order
    SG-Rail Corporation
    Period
    2019.06~2024.06
    Scale
    Main Tunnel(NATM) 16.88km 2 Stations 10 Ventilation Shafts, 1 Temporary Shaft Rail, Architecture, Mechanic, Electric, Telecom, Landscape etc.
    더보기
  • Gwangmyeong Seoul Highway by Private Investment Project(Section No.3)

    Order
    Seoseoul Expressway Corporation
    Period
    2019.03~2024.03
    Scale
    Tunnel 2,670m 1 Interchange 3 Bridges 1 Underpass
    더보기

    UAE, Etihad Rail Stage 2 Package A

    Order
    Etihad Rail
    Period
    2019.03~2022.12
    Scale
    Railroad 139km
    더보기

    HongKong, Central Kowloon Route - Yau Ma Tei West

    Order
    Hong Kong Highways Department
    Period
    2018.11~2025.10
    Scale
    - 7 Interchange Bridges - Underpass 250m - Landscape Deck - Ventilating opening, Soundproof facilities etc.
    더보기
  • Sejong High-Tech Industrial Complex Development Project

    Order
    Sejong High-Tech Industrial Complex Corporation
    Period
    2018.10~2019.10
    Scale
    - Industrial Complex Site Development 243,483㎡ - Earthwork 482,813㎥ - Pavement 27,238㎡ - Pipeline(rain/sewage flow, water supply), Landscape, Electric
    더보기

    HongKong, Central Kowloon Route - Yau Ma Tei East

    Order
    Hong Kong Highways Department
    Period
    2018.01~2025.11
    Scale
    - Cut & Cover Tunnel 390m - Access Shaft - Demolition and reconstruction of existing overpass 300m - Soundproof facilities etc.
    더보기

    Yesan New Material Complex Development Project

    Yesan New Material Complex Development Project

    Order
    Yesan New Material Complex Development Co.,ltd
    Period
    2016.12~2017.02
    Scale
    - Earthwork : cut 996,068㎥, embankment 841,760㎥ - Rainy work(D450~D1500) : L=4,054m - Sewage work(D300) : L=2,595m - Waterworks construction(D100) : L=3,459m - Paving work : 56,200㎡ - Landscape work : park and greenery construction - electric work, etc
    더보기
  • Hwaseong-Jeongnam Industrial Complex Development Project

    Order
    Hwaseong Jeongnam general industrial complex
    Period
    2016.07~2018.06
    Scale
    [ 17 pyeong industrial complex ] - Earthwork : 1,200,000㎥ - Constant ball : L = 3,634m - Excellent ball : L = 4,738m - Sewage ball : L = 4,515m - Ball Packaging : 59,069㎡ - Landscaping , street lighting and traffic light one way
    더보기

    Ulsan reserve base underground structure construction

    Order
    Korea National Oil Corporation
    Period
    2016.01~2020.12
    Scale
    - Civil : 1,030 million barrels of crude oil storage ( excavation volume : 189 million ㎥) - Mechanical : Oil / effusion can peomgak 8 , Fire / integer / non- waste - Electricity: process control equipment, measuring equipment outside the cave yuwi - Construction: haengjeongdong 13 buildings and support facilities - Parks and green space construction type 1
    더보기

    Busan Metro ( ever- lower) 1 tool construction

    Order
    Busan Transportation Corporation
    Period
    2015.12~2020.11
    Scale
    ○ Total length : 1.495km - Station ( 2 places ): 94.9m - Line ( excavation ): 1,332.7m - Main vents ( 4 places ): 67.4m - Mechatronics Corporation one way
    더보기

Sihwa MTV Seohaean Detour Road Construction Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Wolgot-dong, Siheung-si, Gyeonggi-do
· Order Korea Water Resources Corporation
· Period 2019.11~2023.08
· Scale 1 Bridge(688m), 1 Underpass(80m)

Silvertown Tunnel

The Business Performance details view. can you check Work Scope, Order, Period
· Location London, UK
· Order Riverlink
· Period 2019.11~2025.01
· Scale TBM Tunnel 1.4km Cut and Cover Tunnel 0.3km Open-cut Section 0.5km 9 Cross passages 2 Tunnel services buildings 2 Bridges(Overbridge/ Footbridge)

Great Train Express A-Line Section 3, Section 4

The Business Performance details view. can you check Work Scope, Order, Period
· Location Goyang-si, Gyeonggi-do & Seoul
· Order SG-Rail Corporation
· Period 2019.06~2024.06
· Scale Main Tunnel(NATM) 16.88km 2 Stations 10 Ventilation Shafts, 1 Temporary Shaft Rail, Architecture, Mechanic, Electric, Telecom, Landscape etc.

Gwangmyeong Seoul Highway by Private Investment Project(Section No.3)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Choonui-dong, Bucheon-si, Gyeonggi-do
· Order Seoseoul Expressway Corporation
· Period 2019.03~2024.03
· Scale Tunnel 2,670m 1 Interchange 3 Bridges 1 Underpass

UAE, Etihad Rail Stage 2 Package A

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ghweifat~Ruwais Section
· Order Etihad Rail
· Period 2019.03~2022.12
· Scale Railroad 139km

HongKong, Central Kowloon Route - Yau Ma Tei West

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yau Ma Tei, Kowloon, Hong Kong
· Order Hong Kong Highways Department
· Period 2018.11~2025.10
· Scale - 7 Interchange Bridges - Underpass 250m - Landscape Deck - Ventilating opening, Soundproof facilities etc.

Sejong High-Tech Industrial Complex Development Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Godeung-ri, Sojeong-myeon, Sejong
· Order Sejong High-Tech Industrial Complex Corporation
· Period 2018.10~2019.10
· Scale - Industrial Complex Site Development 243,483㎡ - Earthwork 482,813㎥ - Pavement 27,238㎡ - Pipeline(rain/sewage flow, water supply), Landscape, Electric

HongKong, Central Kowloon Route - Yau Ma Tei East

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yau Ma Tei East, Hong Kong
· Order Hong Kong Highways Department
· Period 2018.01~2025.11
· Scale - Cut & Cover Tunnel 390m - Access Shaft - Demolition and reconstruction of existing overpass 300m - Soundproof facilities etc.

Yesan New Material Complex Development Project

  • Yesan New Material Complex Development Project
The Business Performance details view. can you check Work Scope, Order, Period
· Order Yesan New Material Complex Development Co.,ltd
· Period 2016.12~2017.02
· Scale - Earthwork : cut 996,068㎥, embankment 841,760㎥ - Rainy work(D450~D1500) : L=4,054m - Sewage work(D300) : L=2,595m - Waterworks construction(D100) : L=3,459m - Paving work : 56,200㎡ - Landscape work : park and greenery construction - electric work, etc

Hwaseong-Jeongnam Industrial Complex Development Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jeongnam-myeon, Hwaseong-si, Gyeonggi-do, Korea
· Order Hwaseong Jeongnam general industrial complex
· Period 2016.07~2018.06
· Scale [ 17 pyeong industrial complex ] - Earthwork : 1,200,000㎥ - Constant ball : L = 3,634m - Excellent ball : L = 4,738m - Sewage ball : L = 4,515m - Ball Packaging : 59,069㎡ - Landscaping , street lighting and traffic light one way

Ulsan reserve base underground structure construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Hangnam-ri, Onsan-eup, Ulju-gun, Ulsan, Korea
· Order Korea National Oil Corporation
· Period 2016.01~2020.12
· Scale - Civil : 1,030 million barrels of crude oil storage ( excavation volume : 189 million ㎥) - Mechanical : Oil / effusion can peomgak 8 , Fire / integer / non- waste - Electricity: process control equipment, measuring equipment outside the cave yuwi - Construction: haengjeongdong 13 buildings and support facilities - Parks and green space construction type 1

Busan Metro ( ever- lower) 1 tool construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Busan Sasang Station (Line 2) ~ Gamjeon-dong, Sasang-gu, Busan, Korea
· Order Busan Transportation Corporation
· Period 2015.12~2020.11
· Scale ○ Total length : 1.495km - Station ( 2 places ): 94.9m - Line ( excavation ): 1,332.7m - Main vents ( 4 places ): 67.4m - Mechatronics Corporation one way