BUSINESS Business Performance

  • Yesan New Material Complex Development Project

    Yesan New Material Complex Development Project

    Order
    Yesan New Material Complex Development Co.,ltd
    Period
    2016.12~2017.02
    Scale
    - Earthwork : cut 996,068㎥, embankment 841,760㎥ - Rainy work(D450~D1500) : L=4,054m - Sewage work(D300) : L=2,595m - Waterworks construction(D100) : L=3,459m - Paving work : 56,200㎡ - Landscape work : park and greenery construction - electric work, etc
    더보기

    Hwaseong-Jeongnam Industrial Complex Development Project

    Order
    Hwaseong Jeongnam general industrial complex
    Period
    2016.07~2018.06
    Scale
    [ 17 pyeong industrial complex ] - Earthwork : 1,200,000㎥ - Constant ball : L = 3,634m - Excellent ball : L = 4,738m - Sewage ball : L = 4,515m - Ball Packaging : 59,069㎡ - Landscaping , street lighting and traffic light one way
    더보기

    Ulsan reserve base underground structure construction

    Order
    Korea National Oil Corporation
    Period
    2016.01~2020.12
    Scale
    - Civil : 1,030 million barrels of crude oil storage ( excavation volume : 189 million ㎥) - Mechanical : Oil / effusion can peomgak 8 , Fire / integer / non- waste - Electricity: process control equipment, measuring equipment outside the cave yuwi - Construction: haengjeongdong 13 buildings and support facilities - Parks and green space construction type 1
    더보기
  • Busan Metro ( ever- lower) 1 tool construction

    Order
    Busan Transportation Corporation
    Period
    2015.12~2020.11
    Scale
    ○ Total length : 1.495km - Station ( 2 places ): 94.9m - Line ( excavation ): 1,332.7m - Main vents ( 4 places ): 67.4m - Mechatronics Corporation one way
    더보기

    Buoy Ulsan Relocation Corporation ( including Donghae-1 gas pipeline relocation )

    Order
    Korea National Oil Corporation
    Period
    2015.07~2017.10
    Scale
    ○New pipelines and oil relocation Buoy -BUOY Relocation : SPM Refur - New pipeline (3.6km), remove the existing pipeline (0.6km) ○ Pipeline relocation - New gas pipeline (5.6km), remove the existing pipe (1.7km) ○ 1 construction type (operating bases) ○ Soil Improvement : DCM Corporation (364m X 32m)
    더보기

    Subway Jinjeop line(Danggogae ~ jinjeop ) double-track train the first tool construction

    Order
    Korea Rail Network Authority
    Period
    2015.06~2019.12
    Scale
    [ Total length L = 4.576Km] - Tunnel 3.801Km / 1 places - Station ( underground layer 3 ) 0.203Km / 1 places - Excavation Box 0.270Km - Main supply and exhaust ventilation small four places - Substations and other function rooms
    더보기
  • Donghae line Pohang~Samcheok railway construction roadbed construction tools Article 11

    Order
    Korea Rail Network Authority
    Period
    2015.01~2019.01
    Scale
    - Extending a total of 9.050km ( disconnection) - Earthwork 2.964km - Bridge 2 places (0.465km) - Tunnel 4 places (5.621km) - Station 1 point (146m)
    더보기

    Donghae sewer maintenance business (Cheongok , songjeong , samhwa mound)

    Order
    Donghae-si, Gangwon-do, Korea
    Period
    2014.07~2018.01
    Scale
    [ Donghae cheongokdong , Songjeong , samhwadong sections] - New installation (D80~D450): 45,583m - Replace (D300 ~ D1000): 11,562m - Bo Number: 208 places full complement 3,531m, REPAIR
    더보기

    Bujeon- Masan Double Track Railway Concession construction

    Order
    Smart Rail Corp.,
    Period
    2014.05~2020.06
    Scale
    - Earthwork : L = 11.5㎞ - Bridge : L = 6.1㎞ ( up Nakdong River Bridge, Bridge joman Kanto Bridge, New Moon bridges , etc.) - Tunnel : L = 13.0㎞ (Shield: 2.7㎞, NATM: 10.3㎞) - Station 5 points ( failure, ideas , BM01, BM02, Jiang ) - Sharing section : L = 2.2㎞ - A signal in two places ( chilsan , jinrye )
    더보기
  • Highway above the 14 line between Ulsan , Miryang - construction (fifth section)

    Order
    Korea Highway Corporation
    Period
    2014.02~2021.02
    Scale
    Total length L = 8.02km 1) Tunnel : 7,947km / 1 places 2) Earthwork : Cut 168,652m3 3) drain hole : the drain pipe (55.9m / 5 places) , culverts (15.6m / 1 places) 4) Ball Packaging : Packaging of cement (50,330m3), asphalt concrete pavement (3a) 5) ball bag : 1 set
    더보기

    Median line Dodam- Youngcheon second double track train roadbed construction tools

    Order
    Korea Rail Network Authority
    Period
    2014.01~2017.06
    Scale
    [ Total length : L = 14.675㎞] - Tunnel : L = 11.165㎞ (2 points inclined Gang) - Earthwork : L = 2.850㎞ - Bridge : L = 0.660㎞ (5 places) - Orbit : Main Line
    더보기

    Vietnam, NSRP Marine Works Project

    Order
    JGCS CONSORTIUM
    Period
    2013.07~2016.07
    Scale
    1. PKG B : Liquid Berth 2. PKG C : Crude Oil Pipelines (48” Pipe L=34.5km, 2 Lines) 3. PKG D : Breakwater(L=1,532m), Revetment (L=916m), Stormwater Outfall(L=216m)
    더보기

Yesan New Material Complex Development Project

  • Yesan New Material Complex Development Project
The Business Performance details view. can you check Work Scope, Order, Period
· Order Yesan New Material Complex Development Co.,ltd
· Period 2016.12~2017.02
· Scale - Earthwork : cut 996,068㎥, embankment 841,760㎥ - Rainy work(D450~D1500) : L=4,054m - Sewage work(D300) : L=2,595m - Waterworks construction(D100) : L=3,459m - Paving work : 56,200㎡ - Landscape work : park and greenery construction - electric work, etc

Hwaseong-Jeongnam Industrial Complex Development Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jeongnam-myeon, Hwaseong-si, Gyeonggi-do, Korea
· Order Hwaseong Jeongnam general industrial complex
· Period 2016.07~2018.06
· Scale [ 17 pyeong industrial complex ] - Earthwork : 1,200,000㎥ - Constant ball : L = 3,634m - Excellent ball : L = 4,738m - Sewage ball : L = 4,515m - Ball Packaging : 59,069㎡ - Landscaping , street lighting and traffic light one way

Ulsan reserve base underground structure construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Hangnam-ri, Onsan-eup, Ulju-gun, Ulsan, Korea
· Order Korea National Oil Corporation
· Period 2016.01~2020.12
· Scale - Civil : 1,030 million barrels of crude oil storage ( excavation volume : 189 million ㎥) - Mechanical : Oil / effusion can peomgak 8 , Fire / integer / non- waste - Electricity: process control equipment, measuring equipment outside the cave yuwi - Construction: haengjeongdong 13 buildings and support facilities - Parks and green space construction type 1

Busan Metro ( ever- lower) 1 tool construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Busan Sasang Station (Line 2) ~ Gamjeon-dong, Sasang-gu, Busan, Korea
· Order Busan Transportation Corporation
· Period 2015.12~2020.11
· Scale ○ Total length : 1.495km - Station ( 2 places ): 94.9m - Line ( excavation ): 1,332.7m - Main vents ( 4 places ): 67.4m - Mechatronics Corporation one way

Buoy Ulsan Relocation Corporation ( including Donghae-1 gas pipeline relocation )

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dang-wol-ri, Ulju-gun, Ulsan, Korea land and sea area.
· Order Korea National Oil Corporation
· Period 2015.07~2017.10
· Scale ○New pipelines and oil relocation Buoy -BUOY Relocation : SPM Refur - New pipeline (3.6km), remove the existing pipeline (0.6km) ○ Pipeline relocation - New gas pipeline (5.6km), remove the existing pipe (1.7km) ○ 1 construction type (operating bases) ○ Soil Improvement : DCM Corporation (364m X 32m)

Subway Jinjeop line(Danggogae ~ jinjeop ) double-track train the first tool construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sanggye-dong, Nowon-gu, Seoul. ~ Jinjeop-eup, Namyangju-si, Gyeonggi-do, Korea
· Order Korea Rail Network Authority
· Period 2015.06~2019.12
· Scale [ Total length L = 4.576Km] - Tunnel 3.801Km / 1 places - Station ( underground layer 3 ) 0.203Km / 1 places - Excavation Box 0.270Km - Main supply and exhaust ventilation small four places - Substations and other function rooms

Donghae line Pohang~Samcheok railway construction roadbed construction tools Article 11

The Business Performance details view. can you check Work Scope, Order, Period
· Location Wonnam-myeon ~ Geunnam-myeon, Uljin-gun, Gyeongbuk, Korea
· Order Korea Rail Network Authority
· Period 2015.01~2019.01
· Scale - Extending a total of 9.050km ( disconnection) - Earthwork 2.964km - Bridge 2 places (0.465km) - Tunnel 4 places (5.621km) - Station 1 point (146m)

Donghae sewer maintenance business (Cheongok , songjeong , samhwa mound)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Donghae cheongokdong , Songjeong , samhwadong sections
· Order Donghae-si, Gangwon-do, Korea
· Period 2014.07~2018.01
· Scale [ Donghae cheongokdong , Songjeong , samhwadong sections] - New installation (D80~D450): 45,583m - Replace (D300 ~ D1000): 11,562m - Bo Number: 208 places full complement 3,531m, REPAIR

Bujeon- Masan Double Track Railway Concession construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Busanjin-gu ~ Gangseo-gu, Busan, Korea
· Order Smart Rail Corp.,
· Period 2014.05~2020.06
· Scale - Earthwork : L = 11.5㎞ - Bridge : L = 6.1㎞ ( up Nakdong River Bridge, Bridge joman Kanto Bridge, New Moon bridges , etc.) - Tunnel : L = 13.0㎞ (Shield: 2.7㎞, NATM: 10.3㎞) - Station 5 points ( failure, ideas , BM01, BM02, Jiang ) - Sharing section : L = 2.2㎞ - A signal in two places ( chilsan , jinrye )

Highway above the 14 line between Ulsan , Miryang - construction (fifth section)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gorye-ri, Danjang-myeon, Miryang-si ~ Seon-ri, Wondong-myeon, Yangsan-si, Gyeongsangnam-do, Korea
· Order Korea Highway Corporation
· Period 2014.02~2021.02
· Scale Total length L = 8.02km 1) Tunnel : 7,947km / 1 places 2) Earthwork : Cut 168,652m3 3) drain hole : the drain pipe (55.9m / 5 places) , culverts (15.6m / 1 places) 4) Ball Packaging : Packaging of cement (50,330m3), asphalt concrete pavement (3a) 5) ball bag : 1 set

Median line Dodam- Youngcheon second double track train roadbed construction tools

The Business Performance details view. can you check Work Scope, Order, Period
· Location Daegang-myeon, Danyang-gun, Chungbuk ~ Punggi-eup, Yeongju-si, Gyeongbuk, Korea.
· Order Korea Rail Network Authority
· Period 2014.01~2017.06
· Scale [ Total length : L = 14.675㎞] - Tunnel : L = 11.165㎞ (2 points inclined Gang) - Earthwork : L = 2.850㎞ - Bridge : L = 0.660㎞ (5 places) - Orbit : Main Line

Vietnam, NSRP Marine Works Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Nghi Son Economic Zone, Hai Yen Commune, Tinh Gia District, Thanh Hoa Province,Vietnam. (opposite of Nghi Son Police)
· Order JGCS CONSORTIUM
· Period 2013.07~2016.07
· Scale 1. PKG B : Liquid Berth 2. PKG C : Crude Oil Pipelines (48” Pipe L=34.5km, 2 Lines) 3. PKG D : Breakwater(L=1,532m), Revetment (L=916m), Stormwater Outfall(L=216m)