BUSINESS Business Performance

  • Sulfur Handling Expansion Phase II Project

    Work Scope
    7,650 MTPD
    Order
    ADNOC, UAE
    Period
    1999.05~2001.02
    Scale
    7,650 MTPD
    Perform Form
    EPC LSTK
    더보기

    Cyclohexane Dimethanol Manufacturing Facility Project

    Order
    Sk Chemical Co.
    Period
    1999.04~2000.03
    Scale
    CHDM 10,000 MTPY

    Madero Refinery Reconfiguration Project

    Work Scope
    Steam Turbine:32 x 2 MW
    Order
    PEMEX Refinacion(Petroleos Mexicanos), Mexico
    Period
    1999.03~2002.10
    Scale
    Steam Turbine:32 x 2 MW * New Plants 10 Units - Combined 100% Maya Plant 137,000 BPSD - Delayed Coker Plant 50,000 BPSD - DEA Treatment System 34,280 BPSD - Sour Water Treatment Unit 10,000 BPSD - Gas Oil HDS Plant 49,700 BPSD - Hydrogen Sweetening Unit 1,052 kg/h - Alkylation Plant 9,300 BPSD - MTBE Plant 2,600 BPSD - TAME Plant 2,600 BPSD - Hydrogen Plant U-801 42 MMSCFD - Sulfur Recovery Plant 600 T/D - Naphtha Reformer Plant U-901 10,000 BPSD - Fluidized Catalytic Cracking No. 2 Plant 30,500 BPSD * Modernization - Coker Naphtha Treatement Plant 12,000 BPSD - Combined BA Plant 40,000 BPSD - Fluidized Catalytic Cracking No. 1 Plant 30,000 BPSD - Combined MF Plant 13,000 BPSD - Turbosene HDS Plant U-500 15,000 BPSD - Kerosene / Diesel HDS Plant U-501 25,000 BPSD - Integration of CH Hydrocarbon Plant 58 Ton/h * Tankage and Integration
    Perform Form
    EPC LSTK+ Financing
    더보기
  • Madero Refinery Project

    Order
    PEMEX (Madero, Mexico)
    Period
    1999.02~2002.10
    Scale
    Crude & Vax. Unit 137,000BPSD Delayed Coker 50,000BPSD HDDS Plant 49,700BPSD Alkylation Plant 9,300BPSD Sour Water Treatment 10,000BPSD MTBE Plant 100,000BPSD TAME Plant 100,000BPSD
    Perform Form
    EPC
    더보기

    Sulfur Handling Facility Project

    Work Scope
    Liquid Sulfur Recovery 7,650 MTPD
    Order
    ADNOC (U.A.E)
    Period
    1999~2001
    Scale
    Liquid Sulfur Recovery 7,650 MTPD

    RFCC Project (Phase II)

    Work Scope
    14,000 BPSD
    Order
    Tema Oil Refinery Ltd., Ghana
    Period
    1998.12~2002.05
    Scale
    RFCC 14,000 BPSD LPG Merox 3,550 BPSD, Gasoline Merox 7,700 BPSD Sulfur Recovery 3.7 T/H Sour Water Treatment 10.5 T/H Fuel Gas/LPG Amine Treating Unit Amine Regeneration Unit
    Perform Form
    EPC LSTK + Financing
    더보기
  • RFCC Project (Phase II)

    Order
    Tema Oil Refinery Ltd., Ghana
    Period
    1998.12~2002.05
    Scale
    RFCC 14,000 BPSD LPG Merox 3,550 BPSD, Gasoline Merox 7,700 BPSD Sulfur Recovery 3.7 T/H Sour Water Treatment 10.5 T/H Fuel Gas/LPG Amine Treating Unit Amine Regeneration Unit
    Perform Form
    EPC LSTK + Financing

    Pipeline Works for Ghana RFCC Project

    Work Scope
    Capacity : 16"" Dia x 6.5 km
    Order
    Tema, (Ghana)
    Period
    1998.12~2001.05
    Scale
    Capacity : 16"" Dia x 6.5 km
    Perform Form
    LSTK

    ATK Merox Unit Project

    Work Scope
    20,000 BPSD x 2
    Order
    Kuwait National Petroleum Co.(KNPC), Kuwait
    Period
    1998.12~2000.11
    Scale
    Kerosene for Aviation Turbine 20,000 BPSD x 2 Units
    Perform Form
    EPC LSTK
  • ATK Merox Unit Project

    Work Scope
    20,000 BPSD x 2
    Order
    Kuwait National Petroleum Co.(KNPC), Kuwait
    Period
    1998.12~2000.11
    Scale
    Kerosene for Aviation Turbine 20,000 BPSD x 2 Units
    Perform Form
    EPC LSTK

    Design Outsourcing for Ordinary Distillation Unit Improvement Project

    Order
    Sk Corp.
    Period
    1998.02~1998.09
    Scale
    High value-added CDU Facility
    더보기

    Pohang LNG Connecting Pipeline

    Work Scope
    Capacity : - Gas Pipeline 16" x 12.5 km
    Order
    Pohang Steel Corp. (Korea)
    Period
    1998.02~1999.09
    Scale
    Capacity : - Gas Pipeline 16" x 12.5 km
    Perform Form
    ED,PR CN,CO

Sulfur Handling Expansion Phase II Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ruwais, UAE
· Work Scope 7,650 MTPD
· Order ADNOC, UAE
· Period 1999.05~2001.02
· Scale 7,650 MTPD
· Perform Form EPC LSTK

Cyclohexane Dimethanol Manufacturing Facility Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order Sk Chemical Co.
· Period 1999.04~2000.03
· Scale CHDM 10,000 MTPY

Madero Refinery Reconfiguration Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Madero, Mexico
· Work Scope Steam Turbine:32 x 2 MW
· Order PEMEX Refinacion(Petroleos Mexicanos), Mexico
· Period 1999.03~2002.10
· Scale Steam Turbine:32 x 2 MW * New Plants 10 Units - Combined 100% Maya Plant 137,000 BPSD - Delayed Coker Plant 50,000 BPSD - DEA Treatment System 34,280 BPSD - Sour Water Treatment Unit 10,000 BPSD - Gas Oil HDS Plant 49,700 BPSD - Hydrogen Sweetening Unit 1,052 kg/h - Alkylation Plant 9,300 BPSD - MTBE Plant 2,600 BPSD - TAME Plant 2,600 BPSD - Hydrogen Plant U-801 42 MMSCFD - Sulfur Recovery Plant 600 T/D - Naphtha Reformer Plant U-901 10,000 BPSD - Fluidized Catalytic Cracking No. 2 Plant 30,500 BPSD * Modernization - Coker Naphtha Treatement Plant 12,000 BPSD - Combined BA Plant 40,000 BPSD - Fluidized Catalytic Cracking No. 1 Plant 30,000 BPSD - Combined MF Plant 13,000 BPSD - Turbosene HDS Plant U-500 15,000 BPSD - Kerosene / Diesel HDS Plant U-501 25,000 BPSD - Integration of CH Hydrocarbon Plant 58 Ton/h * Tankage and Integration
· Perform Form EPC LSTK+ Financing

Madero Refinery Project

The Business Performance details view. can you check Work Scope, Order, Period
· Order PEMEX (Madero, Mexico)
· Period 1999.02~2002.10
· Scale Crude & Vax. Unit 137,000BPSD Delayed Coker 50,000BPSD HDDS Plant 49,700BPSD Alkylation Plant 9,300BPSD Sour Water Treatment 10,000BPSD MTBE Plant 100,000BPSD TAME Plant 100,000BPSD
· Perform Form EPC

Sulfur Handling Facility Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location U.A.E
· Work Scope Liquid Sulfur Recovery 7,650 MTPD
· Order ADNOC (U.A.E)
· Period 1999~2001
· Scale Liquid Sulfur Recovery 7,650 MTPD

RFCC Project (Phase II)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Tema, Ghana
· Work Scope 14,000 BPSD
· Order Tema Oil Refinery Ltd., Ghana
· Period 1998.12~2002.05
· Scale RFCC 14,000 BPSD LPG Merox 3,550 BPSD, Gasoline Merox 7,700 BPSD Sulfur Recovery 3.7 T/H Sour Water Treatment 10.5 T/H Fuel Gas/LPG Amine Treating Unit Amine Regeneration Unit
· Perform Form EPC LSTK + Financing

RFCC Project (Phase II)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Tema, Ghana
· Order Tema Oil Refinery Ltd., Ghana
· Period 1998.12~2002.05
· Scale RFCC 14,000 BPSD LPG Merox 3,550 BPSD, Gasoline Merox 7,700 BPSD Sulfur Recovery 3.7 T/H Sour Water Treatment 10.5 T/H Fuel Gas/LPG Amine Treating Unit Amine Regeneration Unit
· Perform Form EPC LSTK + Financing

Pipeline Works for Ghana RFCC Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ghana
· Work Scope Capacity : 16"" Dia x 6.5 km
· Order Tema, (Ghana)
· Period 1998.12~2001.05
· Scale Capacity : 16"" Dia x 6.5 km
· Perform Form LSTK

ATK Merox Unit Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Mina Al-Ahmadi & Shuaiba Refinery, Kuwait
· Work Scope 20,000 BPSD x 2
· Order Kuwait National Petroleum Co.(KNPC), Kuwait
· Period 1998.12~2000.11
· Scale Kerosene for Aviation Turbine 20,000 BPSD x 2 Units
· Perform Form EPC LSTK

ATK Merox Unit Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Mina Al-Ahmadi & Shuaiba Refinery, Kuwait
· Work Scope 20,000 BPSD x 2
· Order Kuwait National Petroleum Co.(KNPC), Kuwait
· Period 1998.12~2000.11
· Scale Kerosene for Aviation Turbine 20,000 BPSD x 2 Units
· Perform Form EPC LSTK

Design Outsourcing for Ordinary Distillation Unit Improvement Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order Sk Corp.
· Period 1998.02~1998.09
· Scale High value-added CDU Facility

Pohang LNG Connecting Pipeline

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope Capacity : - Gas Pipeline 16" x 12.5 km
· Order Pohang Steel Corp. (Korea)
· Period 1998.02~1999.09
· Scale Capacity : - Gas Pipeline 16" x 12.5 km
· Perform Form ED,PR CN,CO