본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Junra Line (Yeocheon-Yeosu) Railroad Improvement Construction

    Order
    KORAIL
    Period
    2003.06~2009.06
    Scale
    Railway Road Bed 10,377m Bridge work 600M 1ea Tunnel work 7,450m 2ea

    Busan Shinhangman railway Section 4 Construction

    Order
    Korea Railroad Authority Youngnam Region Office
    Period
    2003.06~2009.06
    Scale
    Total expansion of Road bed 8,050M Bridge 551M / 3 ea Tunnel 5820M / 3 ea

    Sihwa Multitechno Valley Section 5 Construction

    Order
    Korea Water Resource Corp.
    Period
    2003.06~2010.06
    Scale
    Complex Construction :2,139,000m2, Revetment Construction:4.3Km, Waterworks and sewage:39.5Km, Outer Road:3.9Km, Bridge(5ea)
    더보기
  • Rebuilding of Damaged Facilities at GC-15 & BS-130 for KOC

    Work Scope
    380 MTPD, 230 MMSCFD
    Order
    KOC(Kuwait)
    Period
    2003.01~2005.06
    Scale
    380 MTPD, 230 MMSCFD
    Perform Form
    ED,PR CN,CM

    Junra Line (Sungsan-Shinpoong) Railroad Improvement Construction

    Order
    KORAIL
    Period
    2002.12~2008.12
    Scale
    Total Expanstion 12.547Km Main Track 9.589Km Delta Track 2.957Km Earth Work: Cutting 802,436 m3 head-up 999,758m3 Bridge work: 8ea 350m Tunnel Work: 3ea 4,774Km(NATM) 2 Stations
    더보기

    Gochang~Damyang and Gochang~Jangsung Section 2 Construction in National Highway No. 14

    Order
    Korea Expressway Corporation
    Period
    2002.12~2007.11
    Scale
    Earth Work: Cutting 406,198m3, Banking 77,870m3, Export to Other Sections 942,983m3 Drainage Work: L-type Side Gutter 2,667M, Underground Drainage Structure 1,675M Pavement Work : Concrete Pavement 26,126m3, Auxiliary Base 2,810m3 Base 4,332m3, Frostbite Prevention Base 14,109m3 Tunnel Work : Total Expansion 7,625M (Up Line 3,820M, Down Line 3,805M)
    더보기
  • Geojae-si Detour Road (Sangdong-Shinhyun) Construction

    Order
    Busan Regional Homeland Management Agency
    Period
    2002.12~2007.12
    Scale
    Road Expansion and Pavement L=6.41 Km B=20 m Structure Work: Bridge 1,475m 10ea interchange 2ea Earth Work : Cutting 402,222㎥ Banking 806,306㎥ Drainage work: Passage Conduit 2 ea Passage Conduit 2ea /106m Drainage Pipe 17 ea/403.22m Drainage Conduit 2ea /117.69m
    더보기

    Wonpyung-Geumgu Road Expansion and Pavement Construction

    Order
    Iksan Regional Homeland Management Agency
    Period
    2002.12~2007.12
    Scale
    Road Expansion : L = 10.16km, B = 20.0m Bridge work : 643m/12ea Tunnel Work : 1,480m/ 1 ea
    더보기

    Gyungbu High Speed Railway Section14-2 Road Bed Project

    Order
    Korea Rail Network Authority Gangwon Region Office
    Period
    2002.11~2007.11
    Scale
    Total Expansion : 9,973km Main Track Tunnel: 1ea 9,973m NATM Inclined Shaft : 2ea 488m 909m
  • Metropolitan Area Water Supply System Adjustment Project (North Gyeonggi)

    Order
    Korea Water Resource Corp.
    Period
    2002.10~2004.05
    Scale
    Pipe Line : L=28.42 km, D=700~1,100m/m Boosting Station : Q=152,000m3/day Structure W 43m x B 35m x H 11m

    Seosan-Gobuk Detour Road Construction

    Order
    Deajeon Regional Homeland Management Agency
    Period
    2002.09~2006.09
    Scale
    Road Construction and Pavement L = 4.18 km B = 20.0 m Bridge works: Bridge 220 m / 4 ea Drainage Work: Conduit 378 m / 12 ea, Drainage Pipe 868 m / 19 ea

    Seoul Subway Section 912 Construction

    Order
    Seoul Metropolitan Government Office of Subway Construction
    Period
    2002.07~2007.12
    Scale
    Total Expansion : 1.72km Main Track: 1.39km Open cut 272.6m Tunnel 1,117.4m Station : 2ea 330m 920 Station 921 Station Other Facility : Mainline Ventillator 6ea Line 4 Dongjak station Transfer bridge 43m

Junra Line (Yeocheon-Yeosu) Railroad Improvement Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yeosu-si area, Junnam
· Order KORAIL
· Period 2003.06~2009.06
· Scale Railway Road Bed 10,377m Bridge work 600M 1ea Tunnel work 7,450m 2ea

Busan Shinhangman railway Section 4 Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Songjung-dong~Busan New Port area, Gangseo-gu, Busan
· Order Korea Railroad Authority Youngnam Region Office
· Period 2003.06~2009.06
· Scale Total expansion of Road bed 8,050M Bridge 551M / 3 ea Tunnel 5820M / 3 ea

Sihwa Multitechno Valley Section 5 Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sihwa area, Ansan, Gyeonggi-do
· Order Korea Water Resource Corp.
· Period 2003.06~2010.06
· Scale Complex Construction :2,139,000m2, Revetment Construction:4.3Km, Waterworks and sewage:39.5Km, Outer Road:3.9Km, Bridge(5ea)

Rebuilding of Damaged Facilities at GC-15 & BS-130 for KOC

The Business Performance details view. can you check Work Scope, Order, Period
· Location Kuweit
· Work Scope 380 MTPD, 230 MMSCFD
· Order KOC(Kuwait)
· Period 2003.01~2005.06
· Scale 380 MTPD, 230 MMSCFD
· Perform Form ED,PR CN,CM

Junra Line (Sungsan-Shinpoong) Railroad Improvement Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Hearong-myeon, Suncheon-si and Yulcho-myeon, Yeosu-si area, Junnam
· Order KORAIL
· Period 2002.12~2008.12
· Scale Total Expanstion 12.547Km Main Track 9.589Km Delta Track 2.957Km Earth Work: Cutting 802,436 m3 head-up 999,758m3 Bridge work: 8ea 350m Tunnel Work: 3ea 4,774Km(NATM) 2 Stations

Gochang~Damyang and Gochang~Jangsung Section 2 Construction in National Highway No. 14

The Business Performance details view. can you check Work Scope, Order, Period
· Location Eunsa-ri ,Gosu-myeon ,Gochang-gun, Jeonbuk~ Jangsan-ri ,Seosam-myeon ,Jangseong-gun, Jeollanam-do
· Order Korea Expressway Corporation
· Period 2002.12~2007.11
· Scale Earth Work: Cutting 406,198m3, Banking 77,870m3, Export to Other Sections 942,983m3 Drainage Work: L-type Side Gutter 2,667M, Underground Drainage Structure 1,675M Pavement Work : Concrete Pavement 26,126m3, Auxiliary Base 2,810m3 Base 4,332m3, Frostbite Prevention Base 14,109m3 Tunnel Work : Total Expansion 7,625M (Up Line 3,820M, Down Line 3,805M)

Geojae-si Detour Road (Sangdong-Shinhyun) Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sangdong-ri~Jangpyung-ri, Shinhyun-eub, Geojea-si, Gyungnam
· Order Busan Regional Homeland Management Agency
· Period 2002.12~2007.12
· Scale Road Expansion and Pavement L=6.41 Km B=20 m Structure Work: Bridge 1,475m 10ea interchange 2ea Earth Work : Cutting 402,222㎥ Banking 806,306㎥ Drainage work: Passage Conduit 2 ea Passage Conduit 2ea /106m Drainage Pipe 17 ea/403.22m Drainage Conduit 2ea /117.69m

Wonpyung-Geumgu Road Expansion and Pavement Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 101-1, Guwal-ri, Geumsan-myeon, Gimjae-si, Junbuk
· Order Iksan Regional Homeland Management Agency
· Period 2002.12~2007.12
· Scale Road Expansion : L = 10.16km, B = 20.0m Bridge work : 643m/12ea Tunnel Work : 1,480m/ 1 ea

Gyungbu High Speed Railway Section14-2 Road Bed Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 1033-2, Guseo-dong, Geumjung-gu, Busan
· Order Korea Rail Network Authority Gangwon Region Office
· Period 2002.11~2007.11
· Scale Total Expansion : 9,973km Main Track Tunnel: 1ea 9,973m NATM Inclined Shaft : 2ea 488m 909m

Metropolitan Area Water Supply System Adjustment Project (North Gyeonggi)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Euijungbu, Pocheon, Dongducheon area , Gyeonggi
· Order Korea Water Resource Corp.
· Period 2002.10~2004.05
· Scale Pipe Line : L=28.42 km, D=700~1,100m/m Boosting Station : Q=152,000m3/day Structure W 43m x B 35m x H 11m

Seosan-Gobuk Detour Road Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Shinsong-ri~Shingsang-ri, Gobuk-myeon, Seosan-si, Chungnam
· Order Deajeon Regional Homeland Management Agency
· Period 2002.09~2006.09
· Scale Road Construction and Pavement L = 4.18 km B = 20.0 m Bridge works: Bridge 220 m / 4 ea Drainage Work: Conduit 378 m / 12 ea, Drainage Pipe 868 m / 19 ea

Seoul Subway Section 912 Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Heukseok-dong, Dongjak-gu~Banpo-dong, Seocho-gu, Seoul
· Order Seoul Metropolitan Government Office of Subway Construction
· Period 2002.07~2007.12
· Scale Total Expansion : 1.72km Main Track: 1.39km Open cut 272.6m Tunnel 1,117.4m Station : 2ea 330m 920 Station 921 Station Other Facility : Mainline Ventillator 6ea Line 4 Dongjak station Transfer bridge 43m