  • Taean Thermal Power Unit 9,10 civil Phase 1 construction

    Work Scope
    PC
    Order
    Korea Western Power
    Period
    2012.01~2015.01
    Scale
    2,100MW(1,050 MW x 2)
    Perform Form
    Construction

    Tongyeong production base vaporization of liquefied natural gas transmission facilities construction work

    Period
    2011.12~2013.12

    Daechi-dong SKN new company building construction

    Period
    2011.12~2014.01
    Scale
    5 floors below ground ~ 9 floors above ground Total area: 47,638.21m2
    더보기
  • LiBS #8,9 PROJECT

    Order
    SK Innovation
    Period
    2011.11~2013.12
    Scale
    Total floor area of ??24,214m2
    Perform Form
    EPC
    더보기

    Opo-Pogok period (2nd) extended road paving work

    Order
    Construction Headquarters, Gyeonggi Province
    Period
    2011.11~2017.10
    Scale
    Road extension : 6.2Km, 4 car (B = 18.5m) - 2 points span bridge (720m) - Sogyoryang 11 points (453.5m) - Cloverleaf four places ( Pogok IC, Sinwon IC, Dongrim IC, Rngwon IC)
    더보기

    SK Corporate Pavilion, Expo 2012 Yeosu Korea

    Period
    2011.10~2012.04
    Scale
    34m x 43m (19.95m high) Total area: 2,211.71m2
    더보기
  • SK Communications company building construction

    Period
    2011.09~2013.08
    Scale
    4 floors below ground ~ 10 floors above ground Total area: 49,789.27m2
    더보기

    Construction of the service area of the Okcheon Rest Area

    Period
    2011.09~2012.07
    Scale
    Various public amenities. Rest area bldg., gas station, repair shop Total area: 3,540.73m2
    더보기

    Energy remodeling of Myoungryun Orphanage

    Period
    2011.07~2011.11
    Scale
    Two-story bldg. with one floor below ground Total area: 396㎡
  • Construction of the main stadium for the 2014 Incheon Asian Games

    Period
    2011.06~2014.06
    Scale
    Main stadium (5 floors above ground, seats : 61,074 (including 30,770 variable seats)) Auxiliary stadium (1 floor below ground, seats : 5,034) Ancillary facilities (ticket booths, rest rooms, etc.) Total area: 113,620m2
    더보기

    Panama, PACO Coal Fired Power Plant

    Order
    Minera Panama, S. A
    Period
    2011.06~2015.08
    Scale
    * Power Bolier : 450t/h - Manufacturer : Seentec - Type : Pulverized-Bed * STG : 150MW x 2Units (Skoda)
    Perform Form
    EPC
    더보기

    Esmeraldas O&M Service Project

    Order
    EPP
    Period
    2011.05~2014.04
    Perform Form
    EPC

Taean Thermal Power Unit 9,10 civil Phase 1 construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Taean-gun, Chungcheongnam-do, Korea
· Work Scope PC
· Order Korea Western Power
· Period 2012.01~2015.01
· Scale 2,100MW(1,050 MW x 2)
· Perform Form Construction

Tongyeong production base vaporization of liquefied natural gas transmission facilities construction work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Tongyeong-si, Gyeongsangnam-do, Korea
· Period 2011.12~2013.12

Daechi-dong SKN new company building construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 948, Daechi-dong, Gangnam-gu, Seoul
· Period 2011.12~2014.01
· Scale 5 floors below ground ~ 9 floors above ground Total area: 47,638.21m2

LiBS #8,9 PROJECT

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jeungpyeong-gun, Chungcheongbuk-do, Korea
· Order SK Innovation
· Period 2011.11~2013.12
· Scale Total floor area of ??24,214m2
· Perform Form EPC

Opo-Pogok period (2nd) extended road paving work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Pogok-eup, Cheoin-gu, Yongin-si, Gyeonggi-do, Korea
· Order Construction Headquarters, Gyeonggi Province
· Period 2011.11~2017.10
· Scale Road extension : 6.2Km, 4 car (B = 18.5m) - 2 points span bridge (720m) - Sogyoryang 11 points (453.5m) - Cloverleaf four places ( Pogok IC, Sinwon IC, Dongrim IC, Rngwon IC)

SK Corporate Pavilion, Expo 2012 Yeosu Korea

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK Corporate Pavilion, Expo 2012 Yeosu Korea, 351-1, Deokchung-dong, Yeosu, Southern Jeolla-do
· Period 2011.10~2012.04
· Scale 34m x 43m (19.95m high) Total area: 2,211.71m2

SK Communications company building construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 623 & 623-1, Sampyeong-dong, Bundang-gu, Seongnam, Gyeonggi-do
· Period 2011.09~2013.08
· Scale 4 floors below ground ~ 10 floors above ground Total area: 49,789.27m2

Construction of the service area of the Okcheon Rest Area

The Business Performance details view. can you check Work Scope, Order, Period
· Location 122-11 and 27 lots, and 123-1, Samyang-ri, Okcheon-eup, Okcheon-gun, Northern Chungcheong-do 4 lots
· Period 2011.09~2012.07
· Scale Various public amenities. Rest area bldg., gas station, repair shop Total area: 3,540.73m2

Energy remodeling of Myoungryun Orphanage

The Business Performance details view. can you check Work Scope, Order, Period
· Location 286, Cheonggye-dong, Euiwang, Gyeonggi-do
· Period 2011.07~2011.11
· Scale Two-story bldg. with one floor below ground Total area: 396㎡

Construction of the main stadium for the 2014 Incheon Asian Games

The Business Performance details view. can you check Work Scope, Order, Period
· Location 378, Yeonhee-dong, Seo-gu, Incheon
· Period 2011.06~2014.06
· Scale Main stadium (5 floors above ground, seats : 61,074 (including 30,770 variable seats)) Auxiliary stadium (1 floor below ground, seats : 5,034) Ancillary facilities (ticket booths, rest rooms, etc.) Total area: 113,620m2

Panama, PACO Coal Fired Power Plant

The Business Performance details view. can you check Work Scope, Order, Period
· Location Panama
· Order Minera Panama, S. A
· Period 2011.06~2015.08
· Scale * Power Bolier : 450t/h - Manufacturer : Seentec - Type : Pulverized-Bed * STG : 150MW x 2Units (Skoda)
· Perform Form EPC

Esmeraldas O&M Service Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ecuador
· Order EPP
· Period 2011.05~2014.04
· Perform Form EPC