  • SK Corporate Pavilion, Expo 2012 Yeosu Korea

    Period
    2011.10~2012.04
    Scale
    34m x 43m (19.95m high) Total area: 2,211.71m2
    더보기

    SK Communications company building construction

    Period
    2011.09~2013.08
    Scale
    4 floors below ground ~ 10 floors above ground Total area: 49,789.27m2
    더보기

    Construction of the service area of the Okcheon Rest Area

    Period
    2011.09~2012.07
    Scale
    Various public amenities. Rest area bldg., gas station, repair shop Total area: 3,540.73m2
    더보기
  • Energy remodeling of Myoungryun Orphanage

    Period
    2011.07~2011.11
    Scale
    Two-story bldg. with one floor below ground Total area: 396㎡

    Construction of the main stadium for the 2014 Incheon Asian Games

    Period
    2011.06~2014.06
    Scale
    Main stadium (5 floors above ground, seats : 61,074 (including 30,770 variable seats)) Auxiliary stadium (1 floor below ground, seats : 5,034) Ancillary facilities (ticket booths, rest rooms, etc.) Total area: 113,620m2
    더보기

    Panama, PACO Coal Fired Power Plant

    Order
    Minera Panama, S. A
    Period
    2011.06~2015.08
    Scale
    * Power Bolier : 450t/h - Manufacturer : Seentec - Type : Pulverized-Bed * STG : 150MW x 2Units (Skoda)
    Perform Form
    EPC
    더보기
  • Esmeraldas O&M Service Project

    Order
    EPP
    Period
    2011.05~2014.04
    Perform Form
    EPC

    Suwon Gwanggyo Apartment construction A10 block (section 7)

    Period
    2011.04~2013.09
    Scale
    13 buildings (10 & 26 stories), 701 units total Total area: 111,262.69m2
    더보기

    Singapore DTL3 C930 Project

    Order
    Land Transport Authority (LTA)
    Period
    2011.04~2016.12
    Scale
    - TBM Tunnel: 940 m (2Lines) - Cut & Cover Tunnel: 39m - Station 1 location: 148m
    더보기
  • Construction of the 2nd phase facilities of the 2nd Osan Runway

    Order
    Defense Installation Agency
    Period
    2011.04~2013.09
    Scale
    - 2nd runway 2,743m, taxiway 470m - Rainwater pipes and culverts 10,146m - Water supply and drainage pipes 6,957m - Patriot/Vulcan cannon command post, accommodations and 33 buildings, Total area3,782㎡ - Flood control pump and air-conditioning, sanitary facilities - Electrical, communication and fire-fighting facilities
    더보기

    Construction of counter facilities to improve the calmness of Gamcheon Port

    Order
    Busan Port Construction Office, Busan Regional Maritime Affairs and Port Office
    Period
    2011.03~2013.09
    Scale
    - South breakwater (new): L=350m - Training dike (new): L=240m - Reinforcement of the existing East-West breakwater - Other appurtenant work
    더보기

    Gimcheon Community Energy Project

    Order
    Gimcheon Energy Co., Ltd
    Period
    2011.03~2013.07
    Scale
    * Power Bolier : 330t/h - Manufacturer : Hyundai HIC - Type : Circulating Fluidized-Bed * STG : 59MW x 1 (Siemens)
    더보기

SK Corporate Pavilion, Expo 2012 Yeosu Korea

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK Corporate Pavilion, Expo 2012 Yeosu Korea, 351-1, Deokchung-dong, Yeosu, Southern Jeolla-do
· Period 2011.10~2012.04
· Scale 34m x 43m (19.95m high) Total area: 2,211.71m2

SK Communications company building construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 623 & 623-1, Sampyeong-dong, Bundang-gu, Seongnam, Gyeonggi-do
· Period 2011.09~2013.08
· Scale 4 floors below ground ~ 10 floors above ground Total area: 49,789.27m2

Construction of the service area of the Okcheon Rest Area

The Business Performance details view. can you check Work Scope, Order, Period
· Location 122-11 and 27 lots, and 123-1, Samyang-ri, Okcheon-eup, Okcheon-gun, Northern Chungcheong-do 4 lots
· Period 2011.09~2012.07
· Scale Various public amenities. Rest area bldg., gas station, repair shop Total area: 3,540.73m2

Energy remodeling of Myoungryun Orphanage

The Business Performance details view. can you check Work Scope, Order, Period
· Location 286, Cheonggye-dong, Euiwang, Gyeonggi-do
· Period 2011.07~2011.11
· Scale Two-story bldg. with one floor below ground Total area: 396㎡

Construction of the main stadium for the 2014 Incheon Asian Games

The Business Performance details view. can you check Work Scope, Order, Period
· Location 378, Yeonhee-dong, Seo-gu, Incheon
· Period 2011.06~2014.06
· Scale Main stadium (5 floors above ground, seats : 61,074 (including 30,770 variable seats)) Auxiliary stadium (1 floor below ground, seats : 5,034) Ancillary facilities (ticket booths, rest rooms, etc.) Total area: 113,620m2

Panama, PACO Coal Fired Power Plant

The Business Performance details view. can you check Work Scope, Order, Period
· Location Panama
· Order Minera Panama, S. A
· Period 2011.06~2015.08
· Scale * Power Bolier : 450t/h - Manufacturer : Seentec - Type : Pulverized-Bed * STG : 150MW x 2Units (Skoda)
· Perform Form EPC

Esmeraldas O&M Service Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ecuador
· Order EPP
· Period 2011.05~2014.04
· Perform Form EPC

Suwon Gwanggyo Apartment construction A10 block (section 7)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Location 156, Yieui-dong, Yeongtong-gu, Suwon, Gyeonggi-do
· Period 2011.04~2013.09
· Scale 13 buildings (10 & 26 stories), 701 units total Total area: 111,262.69m2

Singapore DTL3 C930 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 40A Ubi Avenue 2, Singapore 408900
· Order Land Transport Authority (LTA)
· Period 2011.04~2016.12
· Scale - TBM Tunnel: 940 m (2Lines) - Cut & Cover Tunnel: 39m - Station 1 location: 148m

Construction of the 2nd phase facilities of the 2nd Osan Runway

The Business Performance details view. can you check Work Scope, Order, Period
· Location 700, Jeokbong-ri, Seotan-myeon, Pyeongtaek, Gyeonggi Province
· Order Defense Installation Agency
· Period 2011.04~2013.09
· Scale - 2nd runway 2,743m, taxiway 470m - Rainwater pipes and culverts 10,146m - Water supply and drainage pipes 6,957m - Patriot/Vulcan cannon command post, accommodations and 33 buildings, Total area3,782㎡ - Flood control pump and air-conditioning, sanitary facilities - Electrical, communication and fire-fighting facilities

Construction of counter facilities to improve the calmness of Gamcheon Port

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK E&C, 4th floor, 909-3, Dadae-dong, Saha-gu, Busan
· Order Busan Port Construction Office, Busan Regional Maritime Affairs and Port Office
· Period 2011.03~2013.09
· Scale - South breakwater (new): L=350m - Training dike (new): L=240m - Reinforcement of the existing East-West breakwater - Other appurtenant work

Gimcheon Community Energy Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gimcheon, Korea
· Order Gimcheon Energy Co., Ltd
· Period 2011.03~2013.07
· Scale * Power Bolier : 330t/h - Manufacturer : Hyundai HIC - Type : Circulating Fluidized-Bed * STG : 59MW x 1 (Siemens)