  • Gwangju Stream Purification Project

    Order
    Gwangju
    Period
    2004.12~2009.12
    Scale
    Gwangju River Maintenance : L = 19.15km Bridge : 1 ea Water facility and Conveying Pump center
    더보기

    Gwangju Stream Purification Project

    Order
    Gwangju City
    Period
    2004.12~2009.12
    Scale
    Facility to Secure Additional Preservation Water (Conveying Pump Center and Conveying Pipe Road 18.4km) Stream Purification:19.15km (Gwangju River 18.2km, Jeungshimsa River 0.95km) Space and Ecological Environment Creation (Gwangju River:18.2km) Removal and New Construction of Gwangju Bridge (3 spans Rigid Frame Bridge, Expansion 60m, Width 15~36m) Facility to Secure Flood Allowance Amounts 3.6km Gwangchecon 2 Bridge Under-Road Construction (L=476m) Bridge View Improvement (3 Bridge View Lightings, Street Light 2.6km) Security, Sound Facility, Fountain and others
    더보기

    Gyungbu High Speed Rail Section14-3 Road Bed Work and other construction work

    Order
    Korea Railroad Authority Youngnam Region Office
    Period
    2004.11~2009.07
    Scale
    Total Expansion : 6.410km (403k 490~409k 900) Original : Open cut (760m), Appurtenant Work 1 set Alternative : Tunnel Work (5,650m, Vertical Culvert 3 ea)
    더보기
  • Gimcheon city Detour Road (Yangcheon-Walgok) Construction

    Order
    Busan Regional Construction and Management Administration
    Period
    2004.11~2009.11
    Scale
    Construction and Pavement: L = 5.42km (B=20.0m) Bridge : 1,155m / 6ea Underground Road :?? 540m / 1ea Tunnel : 1,790m / 2ea (Up/Down Line)
    더보기

    Deagu Yeulha 2 Area Development Site Preparation Work

    Order
    Korea National Housing Corporation
    Period
    2004.10~2008.03
    Scale
    Site :1,029,000 m2 Drain Pipe line:25.0km, Conduit :2.2km Service Water Pipeline :10.2km, Pavement :1,250a Drainage Pump Center:520ton/min
    더보기

    Busan Subway 310 Dukcheon Stop

    Order
    Busan Transportation Corp.
    Period
    2003.12~2005.07
    Scale
    Station : 3 basements Gross area 11,498M2 Finishing work : Jungsun marble, Extruding Cement ,Marblite Facility work : Sanitary, Fire Protection, Electrical Fire Protection, Ventilation, Septic tank
  • Bosung-Imsungri Railway Section 2 (Jangheung~Jangdong)

    Order
    Korea Rail Network Authority
    Period
    2003.12~2009.12
    Scale
    1. Earth Work - Spoil 816,414㎥ 2. Bridge Work - Busan Bridge (Corrugated Steel Arch Bridge) : L= 10m - Simok Bridge (Concrete Arch Bridge) : L= 23m 3.Tunnel Work - Bukkyo Tunnel (Open Cut+NATM): L=1,940m - Jangdong Tunnel (Open Cut+NATM): L=5,960m

    Gyeongjeon Lin Samrangjin~Jinju Double-Track Railway Section 3 (Jinyoung~Changwon)

    Order
    Korea Rail Network Authority
    Period
    2003.12~2009.12
    Scale
    Construction Amounts: 163,920mn KWN (VAT included, SK quota 40% : 65,568 mn KWN) ○Earth Work: Cutting(469,000㎥) / Banking(823,000㎥) ○Tunnel: 2ea, L = 7.446Km (Jinrie tunnel, Bongrim Tunnel) ○Bridge: 3ea (L=24m) · B(함) : 3ea ○Station: ·1ea(Bukchangwon) ○Track Work: L=21.080Km ○Appurtenant Work: 1 set
    더보기

    Machng Bridge Connection Road (Guisan-Yangok)

    Order
    Gyungnam
    Period
    2003.12~2008.02
    Scale
    L = 5.58KM Earth work : Cutting 1,610,000M3 Banking 760,000M3 Spoil 1,180,000M3 Bridge work : 12ea L=2,947M Tunnel work : 2ea L=1,413M
  • Bosung-Imseongri second tool(Jangdong- Jangheung) Railway construction

    Order
    Korea Rail Network Authority
    Period
    2003.12~2016.12
    Scale
    - Construction extension L = 8.12km - Earthwork : 3 points clippers 22,895m3, Sato 816,414m3, ditches bet, 4 points the way bet, L = 12m Catholics in one place - Tunnel : two places , L = 7,900m [ Nationalities tunnel L = 1,944m, nutation tunnel L = 5,954m vertical gang one place ; - Bridge : 2 points , L = 34.4m [ Simok bridge L = 23.4m Concrete Frame Bridge , Busan corrugated steel pipe arch bridge L = 10m ; - Orbit : L = 8.12km - Additional balls: one way

    Gyungbu High Speed Rail Section13-3 Road Bed Work and other construction work

    Order
    Korea Railroad Authority Youngnam Region Office
    Period
    2003.11~2009.06
    Scale
    Total Expansion: 8.830km (364k 770~373k 600) Original : Earth work 2 ea (150m), Tunnel (1 ea 235m) Alternative : Tunnel 1 ea( 8,445m), Inclined shaft (2 ea 1,918m)
    더보기

    Gyeongbu High Speed Railway Section 13-4 Road Bed and Other construction Works

    Order
    Korea Rail Network Authority
    Period
    2003.11~2008.02
    Scale
    2 Tunnels L=7,515m (Wonhyo Tunnel L=4,835m, Pyeongsan Tunnel L=2,680m) 2 Bridges L=468m (Pyeongsan Elevated Bridge L=271.5m, Gaegok Elevated Bridge L=196.5m) Earth Work 4 Sections L=1,017m 1 Inclined Shaft L=931m 2 Approaching Roads (Approaching Road for Inclined Shaft, Temporary Road for Construction, Wonhoy Road Making)
    더보기

Gwangju Stream Purification Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yongyeon-dong, Dong-gu~Yucheon-dong, Seo-gu, Gwangju
· Order Gwangju
· Period 2004.12~2009.12
· Scale Gwangju River Maintenance : L = 19.15km Bridge : 1 ea Water facility and Conveying Pump center

Gwangju Stream Purification Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gwangju Stream : Yongyeon Filteration Plant, Yongyeon-dong ,Dong-gu, Gwangju ~The Confluence of Yeongsangang, Yuduk-dong, Seo-gu, Gwangju
· Order Gwangju City
· Period 2004.12~2009.12
· Scale Facility to Secure Additional Preservation Water (Conveying Pump Center and Conveying Pipe Road 18.4km) Stream Purification:19.15km (Gwangju River 18.2km, Jeungshimsa River 0.95km) Space and Ecological Environment Creation (Gwangju River:18.2km) Removal and New Construction of Gwangju Bridge (3 spans Rigid Frame Bridge, Expansion 60m, Width 15~36m) Facility to Secure Flood Allowance Amounts 3.6km Gwangchecon 2 Bridge Under-Road Construction (L=476m) Bridge View Improvement (3 Bridge View Lightings, Street Light 2.6km) Security, Sound Facility, Fountain and others

Gyungbu High Speed Rail Section14-3 Road Bed Work and other construction work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yangjung-dong, Busanjin-gu~Chorang-dong, Dong-gu, Busan
· Order Korea Railroad Authority Youngnam Region Office
· Period 2004.11~2009.07
· Scale Total Expansion : 6.410km (403k 490~409k 900) Original : Open cut (760m), Appurtenant Work 1 set Alternative : Tunnel Work (5,650m, Vertical Culvert 3 ea)

Gimcheon city Detour Road (Yangcheon-Walgok) Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yangcheon-dong, Gimcheon-si, Gyeongbuk ~ Wolgok-ri, Nongso-myeon, Gimcheon-si, Gyeongbuk
· Order Busan Regional Construction and Management Administration
· Period 2004.11~2009.11
· Scale Construction and Pavement: L = 5.42km (B=20.0m) Bridge : 1,155m / 6ea Underground Road :?? 540m / 1ea Tunnel : 1,790m / 2ea (Up/Down Line)

Deagu Yeulha 2 Area Development Site Preparation Work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Area near Yulha-dong, Shingi-dong, Seoho-dong Ilwon, Dong-gu, Daegu
· Order Korea National Housing Corporation
· Period 2004.10~2008.03
· Scale Site :1,029,000 m2 Drain Pipe line:25.0km, Conduit :2.2km Service Water Pipeline :10.2km, Pavement :1,250a Drainage Pump Center:520ton/min

Busan Subway 310 Dukcheon Stop

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dukcheon-dong, Buk-gu, Busan
· Order Busan Transportation Corp.
· Period 2003.12~2005.07
· Scale Station : 3 basements Gross area 11,498M2 Finishing work : Jungsun marble, Extruding Cement ,Marblite Facility work : Sanitary, Fire Protection, Electrical Fire Protection, Ventilation, Septic tank

Bosung-Imsungri Railway Section 2 (Jangheung~Jangdong)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jangdong-myeon ~ Geumsan-ri, Jangheung-eup, Jangheung-gun, Jeollanam-do
· Order Korea Rail Network Authority
· Period 2003.12~2009.12
· Scale 1. Earth Work - Spoil 816,414㎥ 2. Bridge Work - Busan Bridge (Corrugated Steel Arch Bridge) : L= 10m - Simok Bridge (Concrete Arch Bridge) : L= 23m 3.Tunnel Work - Bukkyo Tunnel (Open Cut+NATM): L=1,940m - Jangdong Tunnel (Open Cut+NATM): L=5,960m

Gyeongjeon Lin Samrangjin~Jinju Double-Track Railway Section 3 (Jinyoung~Changwon)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sinan-ri ,Jillye-myeon ,Gimhae-si, Gyeongsangnam-do ~ Namsan-ri ,Dong-eup ,Changwon-si, Gyeongsangnam-do
· Order Korea Rail Network Authority
· Period 2003.12~2009.12
· Scale Construction Amounts: 163,920mn KWN (VAT included, SK quota 40% : 65,568 mn KWN) ○Earth Work: Cutting(469,000㎥) / Banking(823,000㎥) ○Tunnel: 2ea, L = 7.446Km (Jinrie tunnel, Bongrim Tunnel) ○Bridge: 3ea (L=24m) · B(함) : 3ea ○Station: ·1ea(Bukchangwon) ○Track Work: L=21.080Km ○Appurtenant Work: 1 set

Machng Bridge Connection Road (Guisan-Yangok)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Changwon-gun, Gyungnam]
· Order Gyungnam
· Period 2003.12~2008.02
· Scale L = 5.58KM Earth work : Cutting 1,610,000M3 Banking 760,000M3 Spoil 1,180,000M3 Bridge work : 12ea L=2,947M Tunnel work : 2ea L=1,413M

Bosung-Imseongri second tool(Jangdong- Jangheung) Railway construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jangdong-myeon, Jangheung-gun, Jeollanam-do, Korea
· Order Korea Rail Network Authority
· Period 2003.12~2016.12
· Scale - Construction extension L = 8.12km - Earthwork : 3 points clippers 22,895m3, Sato 816,414m3, ditches bet, 4 points the way bet, L = 12m Catholics in one place - Tunnel : two places , L = 7,900m [ Nationalities tunnel L = 1,944m, nutation tunnel L = 5,954m vertical gang one place ; - Bridge : 2 points , L = 34.4m [ Simok bridge L = 23.4m Concrete Frame Bridge , Busan corrugated steel pipe arch bridge L = 10m ; - Orbit : L = 8.12km - Additional balls: one way

Gyungbu High Speed Rail Section13-3 Road Bed Work and other construction work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Boeun-ri, Sammeyon-dong, Ulju-gun, Ulsan~Woongsang-eub, Yangsan-gun, Gyungnam
· Order Korea Railroad Authority Youngnam Region Office
· Period 2003.11~2009.06
· Scale Total Expansion: 8.830km (364k 770~373k 600) Original : Earth work 2 ea (150m), Tunnel (1 ea 235m) Alternative : Tunnel 1 ea( 8,445m), Inclined shaft (2 ea 1,918m)

Gyeongbu High Speed Railway Section 13-4 Road Bed and Other construction Works

The Business Performance details view. can you check Work Scope, Order, Period
· Location Junam-ri, Woonsang-eup, Yangsan-si, Gyeongsangnam-do ~ Beopgi-ri, Dong-myeon, Yangsan-si, Gyeongsangnam-do
· Order Korea Rail Network Authority
· Period 2003.11~2008.02
· Scale 2 Tunnels L=7,515m (Wonhyo Tunnel L=4,835m, Pyeongsan Tunnel L=2,680m) 2 Bridges L=468m (Pyeongsan Elevated Bridge L=271.5m, Gaegok Elevated Bridge L=196.5m) Earth Work 4 Sections L=1,017m 1 Inclined Shaft L=931m 2 Approaching Roads (Approaching Road for Inclined Shaft, Temporary Road for Construction, Wonhoy Road Making)