BUSINESS Business Performance

  • Janglim - Jinhae main pipe construction

    Order
    Korea Gas Corporation
    Period
    2012.10~2016.03
    Scale
    Buried main pipe : 30"" ""× 16.96km - Supply Bureau : 2 new locations ( Chinhae G / S, the signal B / V) - Proven testing, installation and operation yard
    더보기

    Dangshan SK V1 Center

    Period
    2012.10~2015.02
    Scale
    Land Area : 4,768 pyung, Gross Area : 30,238 pyung
    더보기

    KES Project

    Order
    KOC
    Period
    2012.10~2017.12
    Perform Form
    EPC
  • Pangyo SK ECO HUB Construction

    Period
    2012.09~2014.11
    Scale
    Land Area : 18,594 pyung, Gross Area : 14,403 pyung, Business facilities
    더보기

    SK C&C Pangyo office

    Period
    2012.08~2014.02
    Scale
    Land Area : 3,695 pyung, Gross Area : 20,254 pyung, Parking Capacity 525
    더보기

    SK HUB Pangyo Station Construction of office building

    Period
    2012.07~2014.10
    Scale
    Land Area : 3,299 pyung, Gross Area : 28,628 pyung
  • Geoje - Masan construction Route 3

    Order
    Busan Regional Construction Management Administration
    Period
    2012.07~2020.06
    Scale
    - Extension 6.4km (B = 20.0m, round 4 lanes ) - Cut 1.25 million ㎥ - Fill 890 000 ㎥ - Sato 710 000 ㎥ - Culvert nine places (462m) - Bridge 11 points (1.88km) - 5 points tunnel (1.91km) - Packaging gongoe
    더보기

    Seongmun national industrial complex wastewater treatment plant construction work

    Order
    LH Corporation
    Period
    2012.06~2016.12
    Scale
    - Management equipment and copper, water treatment facilities - East Building Ground Floor 1,2 - Inflow pipe (D800mm, L = 79m) - Discharge pipe Athletics period D700mm, L = 666m : Maritime zone D700mm, L = 824m
    더보기

    Pangyo SK C&C IT Complex

    Period
    2012.06~2014.06
    Scale
    Land Area : 3,695 pyung, Gross Area : 20,254 pyung, Parking Capacity 525
    더보기
  • Step 2 Aewol port development projects

    Order
    Jeju Special Self-Governing Province
    Period
    2012.03~2017.02
    Scale
    ○ outside facilities : 1,465m - Joan seobangpa 513m, par northern breakwater 602m, Northern breakwater 250m, east breakwater 100m) ○ berthing facilities : 270m Sand Pier 110m, 160m cement pier ○ Water facility ( one way routes and marina ) ○ connecting Joan ( the upright ): 60m ○ dredging and reclamation : 1 set ○ existing breakwater and the pier removed : 1 set ○ Other troops ball ○ city planning road : one way
    더보기

    The Metropolitan Rail (Suseo~Pyeongtaek) Article 8 Other new tools roadbed construction

    Order
    Korea Rail Network Authority
    Period
    2012.01~2016.06
    Scale
    - Earthwork : 1,694m - U-Type: 486m - Excavation BOX: 100m - Excavation tunnel : 660m - NATM: 722m - Stereoscopic viaducts : one place
    더보기

    Turkey Istanbul Road Project (Turnkey EPC)

    Order
    DLH (General Directorate of Railways, Harbours, and Airports Construction under the Ministry of Transportation of Turkey)
    Period
    2012.01~2016.07
    Scale
    - Total length: 14.6km - Width extension section: 8.8km (6~8 lanes) - new section: 5.8km (4 lanes) (including TBM 3.340m)
    더보기

Janglim - Jinhae main pipe construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Songjeong-dong, Gangseo-gu, Busan, Korea
· Order Korea Gas Corporation
· Period 2012.10~2016.03
· Scale Buried main pipe : 30"" ""× 16.96km - Supply Bureau : 2 new locations ( Chinhae G / S, the signal B / V) - Proven testing, installation and operation yard

Dangshan SK V1 Center

The Business Performance details view. can you check Work Scope, Order, Period
· Location 80, Dangsan-dong 4(sa)-ga, Yeongdeungpo-gu, Seoul, Korea
· Period 2012.10~2015.02
· Scale Land Area : 4,768 pyung, Gross Area : 30,238 pyung

KES Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Kuwait
· Order KOC
· Period 2012.10~2017.12
· Perform Form EPC

Pangyo SK ECO HUB Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 687, Sampyeong-dong, Bundang-gu, Seongnam-si, Gyeonggi-do, Korea
· Period 2012.09~2014.11
· Scale Land Area : 18,594 pyung, Gross Area : 14,403 pyung, Business facilities

SK C&C Pangyo office

The Business Performance details view. can you check Work Scope, Order, Period
· Location 613, Sampyeong-dong, Bundang-gu, Seongnam-si, Gyeonggi-do, Korea
· Period 2012.08~2014.02
· Scale Land Area : 3,695 pyung, Gross Area : 20,254 pyung, Parking Capacity 525

SK HUB Pangyo Station Construction of office building

The Business Performance details view. can you check Work Scope, Order, Period
· Location 529, Baekhyeon-dong, Bundang-gu, Seongnam-si, Gyeonggi-do, Korea
· Period 2012.07~2014.10
· Scale Land Area : 3,299 pyung, Gross Area : 28,628 pyung

Geoje - Masan construction Route 3

The Business Performance details view. can you check Work Scope, Order, Period
· Location Naepo-ri, Gusan-myeon ~ Hyeondong, Masanhappo-gu, Changwon-si, Gyeongsangnam-do, Korea.
· Order Busan Regional Construction Management Administration
· Period 2012.07~2020.06
· Scale - Extension 6.4km (B = 20.0m, round 4 lanes ) - Cut 1.25 million ㎥ - Fill 890 000 ㎥ - Sato 710 000 ㎥ - Culvert nine places (462m) - Bridge 11 points (1.88km) - 5 points tunnel (1.91km) - Packaging gongoe

Seongmun national industrial complex wastewater treatment plant construction work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sambong-ri, Seongmun-myeon, Dangjin-gun, Chungcheongnam-do, Korea
· Order LH Corporation
· Period 2012.06~2016.12
· Scale - Management equipment and copper, water treatment facilities - East Building Ground Floor 1,2 - Inflow pipe (D800mm, L = 79m) - Discharge pipe Athletics period D700mm, L = 666m : Maritime zone D700mm, L = 824m

Pangyo SK C&C IT Complex

The Business Performance details view. can you check Work Scope, Order, Period
· Location 611, Sampyeong-dong, Bundang-gu, Seongnam-si, Gyeonggi-do, Korea
· Period 2012.06~2014.06
· Scale Land Area : 3,695 pyung, Gross Area : 20,254 pyung, Parking Capacity 525

Step 2 Aewol port development projects

The Business Performance details view. can you check Work Scope, Order, Period
· Location Aewol port, Aewol-eup, Jeju-si, Jeju Special Self-Governing Province, Korea
· Order Jeju Special Self-Governing Province
· Period 2012.03~2017.02
· Scale ○ outside facilities : 1,465m - Joan seobangpa 513m, par northern breakwater 602m, Northern breakwater 250m, east breakwater 100m) ○ berthing facilities : 270m Sand Pier 110m, 160m cement pier ○ Water facility ( one way routes and marina ) ○ connecting Joan ( the upright ): 60m ○ dredging and reclamation : 1 set ○ existing breakwater and the pier removed : 1 set ○ Other troops ball ○ city planning road : one way

The Metropolitan Rail (Suseo~Pyeongtaek) Article 8 Other new tools roadbed construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jije-dong, Pyeongtaek-si, Gyeonggi-do, Korea
· Order Korea Rail Network Authority
· Period 2012.01~2016.06
· Scale - Earthwork : 1,694m - U-Type: 486m - Excavation BOX: 100m - Excavation tunnel : 660m - NATM: 722m - Stereoscopic viaducts : one place

Turkey Istanbul Road Project (Turnkey EPC)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Kısıklı Cad. Tekin-Ak ?? Merkezi No:3 K:1 D:5 34662 Altunizade, Istanbul
· Order DLH (General Directorate of Railways, Harbours, and Airports Construction under the Ministry of Transportation of Turkey)
· Period 2012.01~2016.07
· Scale - Total length: 14.6km - Width extension section: 8.8km (6~8 lanes) - new section: 5.8km (4 lanes) (including TBM 3.340m)