  • Ghana Petroleum Products Pipeline

    Order
    MOE, Ghana
    Scale
    - Pipeline:8"" x 275km, - Pump station:2 Nos, - Valve Station:12 Nos
    Perform Form
    EPC LSTK

    GDSK China LINE#4, 5 Expansion Project

    Period
    ~2005.02
    Scale
    Special Polymer Production Plant Installation of 2 Extruders for Production Installation of 6 Feeders Installation of Pneumatic Conveying System Promoter : Gwagndong SK Special Polymer Corporation Period : 2005.02(3.23bn)
    더보기

    Pulmuone Depot (Freezer, Refrigerator)

    Period
    ~1994.08
    Scale
    - Location | Deague - Completed | 1994. 8 - Work Amount | * Agro-Fisheries products center - Freezer, Refrigerator warehouse : 1,400 pyung - Manual Warehouse : 600pyung - 1 Basement, 3 Floors
    더보기
  • Nowon Heat Source Facility Construction

    Commercialization
    1996. 12
    Scale
    - Capacity: 390Gcal/h - Major Composition - Main boiler:150t/h x 40kg/cm g x 400℃ x 1 unit - Aux. boiler:150t/h x 12kg/cm g x sat.steam x 4 units - Heat Source Capacity: 390Gcal/h
    더보기

    Logistics Analysis of Logistics Complex Project

    Period
    ~2000.01
    Scale
    Korea High Speed Railway Corporation 2000.01(60 million) Logistics Analysis
    더보기

    MTBE / TAME Project

    Work Scope
    60,000 BPSD,60,000 BPSD
    Order
    PEMEX (Mexico)
    Scale
    60,000 BPSD, 60,000 BPSD
    Perform Form
    EPC LSTK
  • Jangryu Refrigerator Automated Warehouse

    Period
    ~2000.10
    Scale
    Haechandle 2000.10 Turn-Key -S/C : 1 unit
    더보기

    Jeonju Wastewater Treatment Facility DCS

    Period
    ~1995.08
    Scale
    Korea Veterans Association 1995.08 Manufacture, Delivery, Commissioning -200,000ton/Day

    Ilwon Heat Source Facility Construction

    Commercialization
    1999. 6
    Scale
    - Capacity: 240Gcal/h - Major Composition - Boiler:200t/h x 10kg/cm g x sat.steam x 2 units - Heat Source Capacity: 240Gcal/h
    더보기
  • Gunjang National Industry Complex (Janghang Area) Revetment Road Construction

    Order
    Korea Land Corporation
    Scale
    ○ Revetment (L=6,032M) - Soft Ground Work: S.C.P 98,218m, S.C.P Sandmat 267,034㎥, P.B.D 37,487m - Riprap and Armor Stones: Riprap 1,270,553㎥, Armor Stones 168,659㎥, Sediments 223,118㎥ - T.T.P(3.2~12.5TON) : 59,397EA - Surface Concrete: 133,951㎥ ○ Revetment Road Construction (L=5,906M, B=32M) - Earth Work: Cutting 111,878㎥, VTM 130,930㎡, Dredging Back Filling 1,938,543㎥ ○ 2 Lock Gates
    더보기

    Gwangju Hwani Department Store

    Period
    ~1997.11
    Scale
    - Gwangju City - 1997.11(22bn) - Turn-Key - Gross Area : 15,000 pyeong
    더보기

    Gwangyang Compound Thermal Power Plant

    Commercialization
    2005. 12. 31 (Unit 1), 2006. 6. 31(Unit 2)
    Scale
    -GTG :170MW x 4 units -HRSG : HP - 185.5t/h x 131.4kg/cm2g x 567℃ x 4 units IP - 38.6t/h x 25.7kg/cm2g x 320 ℃ LP - 19t/h x 6.0kg/cm2g x 321℃ -STG: 201MW x 2 units
    더보기

Ghana Petroleum Products Pipeline

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ghana
· Order MOE, Ghana
· Scale - Pipeline:8"" x 275km, - Pump station:2 Nos, - Valve Station:12 Nos
· Perform Form EPC LSTK

GDSK China LINE#4, 5 Expansion Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location China
· Period ~2005.02
· Scale Special Polymer Production Plant Installation of 2 Extruders for Production Installation of 6 Feeders Installation of Pneumatic Conveying System Promoter : Gwagndong SK Special Polymer Corporation Period : 2005.02(3.23bn)

Pulmuone Depot (Freezer, Refrigerator)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Deague
· Period ~1994.08
· Scale - Location | Deague - Completed | 1994. 8 - Work Amount | * Agro-Fisheries products center - Freezer, Refrigerator warehouse : 1,400 pyung - Manual Warehouse : 600pyung - 1 Basement, 3 Floors

Nowon Heat Source Facility Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Commercialization 1996. 12
· Scale - Capacity: 390Gcal/h - Major Composition - Main boiler:150t/h x 40kg/cm g x 400℃ x 1 unit - Aux. boiler:150t/h x 12kg/cm g x sat.steam x 4 units - Heat Source Capacity: 390Gcal/h

Logistics Analysis of Logistics Complex Project

The Business Performance details view. can you check Work Scope, Order, Period
· Period ~2000.01
· Scale Korea High Speed Railway Corporation 2000.01(60 million) Logistics Analysis

MTBE / TAME Project

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope 60,000 BPSD,60,000 BPSD
· Order PEMEX (Mexico)
· Scale 60,000 BPSD, 60,000 BPSD
· Perform Form EPC LSTK

Jangryu Refrigerator Automated Warehouse

The Business Performance details view. can you check Work Scope, Order, Period
· Period ~2000.10
· Scale Haechandle 2000.10 Turn-Key -S/C : 1 unit

Jeonju Wastewater Treatment Facility DCS

The Business Performance details view. can you check Work Scope, Order, Period
· Period ~1995.08
· Scale Korea Veterans Association 1995.08 Manufacture, Delivery, Commissioning -200,000ton/Day

Ilwon Heat Source Facility Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Commercialization 1999. 6
· Scale - Capacity: 240Gcal/h - Major Composition - Boiler:200t/h x 10kg/cm g x sat.steam x 2 units - Heat Source Capacity: 240Gcal/h

Gunjang National Industry Complex (Janghang Area) Revetment Road Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Janghang-eup/Maseo-myeon/ ,Seocheon-gun, Chungcheongnam-do
· Order Korea Land Corporation
· Scale ○ Revetment (L=6,032M) - Soft Ground Work: S.C.P 98,218m, S.C.P Sandmat 267,034㎥, P.B.D 37,487m - Riprap and Armor Stones: Riprap 1,270,553㎥, Armor Stones 168,659㎥, Sediments 223,118㎥ - T.T.P(3.2~12.5TON) : 59,397EA - Surface Concrete: 133,951㎥ ○ Revetment Road Construction (L=5,906M, B=32M) - Earth Work: Cutting 111,878㎥, VTM 130,930㎡, Dredging Back Filling 1,938,543㎥ ○ 2 Lock Gates

Gwangju Hwani Department Store

The Business Performance details view. can you check Work Scope, Order, Period
· Period ~1997.11
· Scale - Gwangju City - 1997.11(22bn) - Turn-Key - Gross Area : 15,000 pyeong

Gwangyang Compound Thermal Power Plant

The Business Performance details view. can you check Work Scope, Order, Period
· Commercialization 2005. 12. 31 (Unit 1), 2006. 6. 31(Unit 2)
· Scale -GTG :170MW x 4 units -HRSG : HP - 185.5t/h x 131.4kg/cm2g x 567℃ x 4 units IP - 38.6t/h x 25.7kg/cm2g x 320 ℃ LP - 19t/h x 6.0kg/cm2g x 321℃ -STG: 201MW x 2 units