본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Facility Switching Project for Switching and Maintenance of TDI Refrigerants

    Order
    Korea Fine Chemical Co.
    Period
    2003.02~2003.11
    Scale
    Phosgene Unit Revamp(Rhone Poulenc) D410 Column Replacement(Rhone Poulenc) DCS Upgrade
    더보기

    CO2 Recovery Facility Installation

    Order
    SK Corp.
    Period
    2003.02~2003.09

    TDI #1 Renovation Project

    Work Scope
    CDC:129 T/D
    Order
    Korea Fine Chemical Co.
    Period
    2003.02~2003.11
    Scale
    CDC:129 T/D
    Perform Form
    EPC LSTK
  • TDI #1 Renovation Project

    Work Scope
    CDC:129 T/D, TDI:101 T/D, HCL:95 T/D
    Order
    Korea Fine Chemical Co.
    Period
    2003.02~2003.11
    Scale
    CDC:129 T/D, TDI:101 T/D, HCL:95 T/D
    Perform Form
    EPC LSTK

    KOCRP Project

    Order
    KOC (KUWAIT)
    Period
    2003.01~2007.12
    Perform Form
    EPC
    더보기

    Kuwait Rebuilding of Damaged Facilities At GC-15 and BS-130 for KOC(KOCRP)

    Work Scope
    380 MTPD
    Order
    Kuwait Oil Company(KOC), Kuwait
    Period
    2003.01~2005.06
    Scale
    380 MTPD
    Perform Form
    ED,PR CN,CM
  • Green Energy Project

    Order
    SK Corporation (Ulsan, Korea)
    Period
    2003~2005
    Scale
    DE-SOX 400,000M3/HR Sweetening 20,000BPSD HydroTreating 150,000BPSD
    더보기

    Design for T/T Shipping area VRU Installation

    Order
    SK Corp.
    Period
    2002.10~2004.10

    China Gwangdong province Compound Project

    Order
    GDSK
    Period
    2002.09~2003.12
  • 2nd Lubebase Oil Manufacturing Facility

    Order
    SK Corp.
    Period
    2002.08~2004.06
    Scale
    VDU 15,000 Barrel 1 Unit CDW 7,000 Barrel 1 Unit
    더보기

    Thailand Debottlenecking Stage 2 Project, Tailand

    Work Scope
    44,451kg/h
    Order
    The Aromatics(Thailand) Public Co., Ltd.
    Period
    2002.06~2004.03
    Scale
    Para Xylene 496,000 MTPY 1 Unit(UOP) Benzene 458,000 MTPY 1 Unit(UOP)
    Perform Form
    EPC LSTK
    더보기

    Oman DHDS Project

    Work Scope
    18,000 BPSD
    Order
    Oman Refinery Company LLC, Oman
    Period
    2002.05~2004.01
    Scale
    18,000 BPSD DHDS Unit 536 TPD ATU, 15 TPD SRU Existing Sour Water Stripper(SWS) Unit Modification Sulphur Handling Facilities(Solidification / Pelletizer) SSB(Sulfur Solidification Building) SSS (Sulfur Storage Shipping) Tie-in with Existing 85,000 BPSD Refinery Plant
    Perform Form
    EPC LSTK

Facility Switching Project for Switching and Maintenance of TDI Refrigerants

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yeosu-si, Junnam
· Order Korea Fine Chemical Co.
· Period 2003.02~2003.11
· Scale Phosgene Unit Revamp(Rhone Poulenc) D410 Column Replacement(Rhone Poulenc) DCS Upgrade

CO2 Recovery Facility Installation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order SK Corp.
· Period 2003.02~2003.09

TDI #1 Renovation Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yeosu
· Work Scope CDC:129 T/D
· Order Korea Fine Chemical Co.
· Period 2003.02~2003.11
· Scale CDC:129 T/D
· Perform Form EPC LSTK

TDI #1 Renovation Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yeosu
· Work Scope CDC:129 T/D, TDI:101 T/D, HCL:95 T/D
· Order Korea Fine Chemical Co.
· Period 2003.02~2003.11
· Scale CDC:129 T/D, TDI:101 T/D, HCL:95 T/D
· Perform Form EPC LSTK

KOCRP Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Kuweit
· Order KOC (KUWAIT)
· Period 2003.01~2007.12
· Perform Form EPC

Kuwait Rebuilding of Damaged Facilities At GC-15 and BS-130 for KOC(KOCRP)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Kuweit
· Work Scope 380 MTPD
· Order Kuwait Oil Company(KOC), Kuwait
· Period 2003.01~2005.06
· Scale 380 MTPD
· Perform Form ED,PR CN,CM

Green Energy Project

The Business Performance details view. can you check Work Scope, Order, Period
· Order SK Corporation (Ulsan, Korea)
· Period 2003~2005
· Scale DE-SOX 400,000M3/HR Sweetening 20,000BPSD HydroTreating 150,000BPSD

Design for T/T Shipping area VRU Installation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order SK Corp.
· Period 2002.10~2004.10

China Gwangdong province Compound Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gwangdong Prov.
· Order GDSK
· Period 2002.09~2003.12

2nd Lubebase Oil Manufacturing Facility

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order SK Corp.
· Period 2002.08~2004.06
· Scale VDU 15,000 Barrel 1 Unit CDW 7,000 Barrel 1 Unit

Thailand Debottlenecking Stage 2 Project, Tailand

The Business Performance details view. can you check Work Scope, Order, Period
· Location Map Ta Phut Industrial Estate, Rayong, Thailand
· Work Scope 44,451kg/h
· Order The Aromatics(Thailand) Public Co., Ltd.
· Period 2002.06~2004.03
· Scale Para Xylene 496,000 MTPY 1 Unit(UOP) Benzene 458,000 MTPY 1 Unit(UOP)
· Perform Form EPC LSTK

Oman DHDS Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Mina Al Fahal Refinery In Muscat, Oman
· Work Scope 18,000 BPSD
· Order Oman Refinery Company LLC, Oman
· Period 2002.05~2004.01
· Scale 18,000 BPSD DHDS Unit 536 TPD ATU, 15 TPD SRU Existing Sour Water Stripper(SWS) Unit Modification Sulphur Handling Facilities(Solidification / Pelletizer) SSB(Sulfur Solidification Building) SSS (Sulfur Storage Shipping) Tie-in with Existing 85,000 BPSD Refinery Plant
· Perform Form EPC LSTK