본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Incheon Depot Project

    Order
    Infort Co.,Ltd.
    Period
    2005.10~2008.12
    Scale
    1) Soil Purification Process - Soil Cultivation (456,000m3) - Soil Washing (165,000m3) - Pre-Stabilization (130,000m3) - In-Situ Stabilization (16,000m3) - Thermal Desorption(6,800m3) 2) Civil Engineering Process - Earth Work (885,000m3) - Dismentaling and disposal of waste (14 Storage tanks to keep previous facilities and oil) - Structures reinforcement (Sheet Pile 1,120 Ton) - Other appurtenant work (1 set)
    더보기

    Ulsan Extra Reserve Base Construction Project

    Order
    Korea National Oil Corporation
    Period
    2005.10~2010.02
    Scale
    Storage amount: 6.5m barrel
    더보기

    Yeosu city Detour Road (Woodu~Jongwha) Construction

    Order
    Iksan Regional Homeland Management Agency
    Period
    2005.07~2010.06
    Scale
    Total : Total Expansion 1.94km(Tunnel 190km/1 ea, Bridge 630m/1ea) Alternative : Expansion 0,87km(Bridge 630m(2nd Dolsan Bridge )/1ea)
  • Seoul Subway Line 7 Expansion to Incheon Section 706 Construction

    Order
    Incheon City Railway Construction HQ
    Period
    2005.07~2010.09
    Scale
    Total Expansion 1.077km Station : 0.165km(1ea, Transferring station) Main Line : 0.561km, Holding Line 0.351km
    더보기

    Yongma Tunnel PFI Project

    Order
    Yongma Tunnel Co.
    Period
    2005.06~2009.12
    Scale
    Road Expansion L=3.542km Tunnel :L = 2.56km Bridge : 124m/2ea, Underground road 385m
    더보기

    Driving Facility Construction for Water Supply System of Han River Downstream Area Phase 1 Section 1

    Order
    Korea Water Resouces Corporation
    Period
    2005.06~2007.12
    Scale
    1.Driving Channel Pipe Line (D2,600mm) : Total Expansion L=10.30km 2.Riverbed Tunnel of Han River (D3,600mm) : Shield TBM, L=1.31km 3.Driving Part: Semi Shield (Pacheon 430m, 88 Road Crossing 182m) , Box Driving 26m 4.Structure: 2 Maintenance Manholes, 3 Water Flow Controlling Valve Centers, 14 Air Controlling Valve Centers, 7 Water Drainage Valve Centers
    더보기
  • Masan Port Development (Phase 1-1) PFI

    Order
    Masan Container Terminal Co.
    Period
    2005.04~2011.03
    Scale
    Query Wall 980m(Container Pier 500m, Multi-Pier 480m) Container Pier 20,000DWT 2 berths Multi-purpose pier 30,000DWT 2 berths, Management Pier (320m) 1Berth Site Construction : 122,891 pyung(406,253㎡) - Container and hitreland:115,949 pyung(383,304㎡) - Management Pier:6,942 pyung(22,949㎡)
    더보기

    Gageum-Chilgeum Road Expansion and Pavement Project

    Order
    Chungju-city
    Period
    2005.03~2010.03
    Scale
    Total : Total Expansion 6.9Km(Road 6.13Km, Bridge 786m/3ea) Alternative: Road 1.094km(B=12.5~35m), Bridge 680/1ea)
    더보기

    Detour Road alternative to Road 25 Construction (Yongdong-Dongeub)

    Order
    Changwon-City
    Period
    2004.12~2009.12
    Scale
    - Earth Work ·Cutting: 663,229㎥/·Banking: 767,132㎥ /·Spoil: 235,808㎥ - Structure Work ·Youngchu Bridge(P.S.C BOX Bridge) : 520m(FCM:100+160@2+100) ·Ducksan Bridge (IPC Girder 405m + Edge Girder BOX 340m, 2,124ton) ·RAMP-D Bridge (Edge Girder BOX) : 149m , 352ton ·RAMP-E Bridge (Edge Girder BOX) : 320m , 980ton ·Duckcheon 1 Bridge (Edge Girder BOX) : 40m , 169ton ·Towol Bridge (Deep Corrugated Steel Plates) : 14.5m ·Somock 1 & 2 Bridge (Rigid Frame Bridge) : 30m/2ea - Tunnel Work ·Jeongbyung tunnel (2.2km) both ways, NATM method - Gateway ·2 gateways[Namsan IC(trumpet type) 1set, Towal IC connecting road:1 gateway] - Other Electric work, mechanic work 1 set
    더보기
  • Busan Shinhangman Accessing Railway

    Order
    Busn Port Construction Office
    Period
    2004.12~2008.09
    Scale
    Expansion : L= 2,770.74M(South container), 2,591.21M(North Container) Track construction : 5,839M Bridge work : L=2,443.50M (PSC Box girder , Steel box girder, Through Arch, PSC Beam)

    Busan-Geojae Connecting Road Construction

    Order
    GK Fixed Link Co.
    Period
    2004.12~2010.11
    Scale
    L = 8.2KM Structure Work 1)Cabe Strayed Bridge L=3.5KM(Main Preliminary Bridge 1.87KM Sub-Preliminary Bridge 1.65KM) 2)Submerged tunnel L=3.7KM 3)Land Tunnel etc. L=1.0KM
    더보기

    Jeonju-Gwangyang National Highway No. 27 Construction

    Order
    Korea Expressway Corporation
    Period
    2004.12~2011.12
    Scale
    - Earth Work: Cutting: 2,153,000 ㎥ Banking: 2,206,000 ㎥ - Drainage Work: Drainage Pipeline : 54ea/1,799M Conduit : 23ea/973M - Structure Work: Bridge: 10ea/1261M - Pavement Work Concrete Pavement : 49,000㎥ Asphalt Pavement: 763 a - Tunnel Work: 2ea/268M - Related Facility: Entrance 2ea(Jeonju JCT, East Jeonju IC)

Incheon Depot Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK Logistics Center (previous) 604-1 Yonghyeon 5-dong ,Nam-gu, Incheon
· Order Infort Co.,Ltd.
· Period 2005.10~2008.12
· Scale 1) Soil Purification Process - Soil Cultivation (456,000m3) - Soil Washing (165,000m3) - Pre-Stabilization (130,000m3) - In-Situ Stabilization (16,000m3) - Thermal Desorption(6,800m3) 2) Civil Engineering Process - Earth Work (885,000m3) - Dismentaling and disposal of waste (14 Storage tanks to keep previous facilities and oil) - Structures reinforcement (Sheet Pile 1,120 Ton) - Other appurtenant work (1 set)

Ulsan Extra Reserve Base Construction Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 300, Hangnam-ri ,Onsan-eup ,Ulju-gun, Ulsan
· Order Korea National Oil Corporation
· Period 2005.10~2010.02
· Scale Storage amount: 6.5m barrel

Yeosu city Detour Road (Woodu~Jongwha) Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Woodu-ri~Jonghwa-dong, Dolsan-eub, Yeosu-si, Junnam
· Order Iksan Regional Homeland Management Agency
· Period 2005.07~2010.06
· Scale Total : Total Expansion 1.94km(Tunnel 190km/1 ea, Bridge 630m/1ea) Alternative : Expansion 0,87km(Bridge 630m(2nd Dolsan Bridge )/1ea)

Seoul Subway Line 7 Expansion to Incheon Section 706 Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Galsan ~ Changchun-dong, Bupyung-gu, Incheon
· Order Incheon City Railway Construction HQ
· Period 2005.07~2010.09
· Scale Total Expansion 1.077km Station : 0.165km(1ea, Transferring station) Main Line : 0.561km, Holding Line 0.351km

Yongma Tunnel PFI Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Myeonmok-dong, Jungrang-gu, Seoul~Acheon-dong, Guri-si, Gyeonggi
· Order Yongma Tunnel Co.
· Period 2005.06~2009.12
· Scale Road Expansion L=3.542km Tunnel :L = 2.56km Bridge : 124m/2ea, Underground road 385m

Driving Facility Construction for Water Supply System of Han River Downstream Area Phase 1 Section 1

The Business Performance details view. can you check Work Scope, Order, Period
· Location Seoul (Korea Life Insurance 63 Bldg., Yeouido-dong ~ The Northern End of Gayang Bridge)
· Order Korea Water Resouces Corporation
· Period 2005.06~2007.12
· Scale 1.Driving Channel Pipe Line (D2,600mm) : Total Expansion L=10.30km 2.Riverbed Tunnel of Han River (D3,600mm) : Shield TBM, L=1.31km 3.Driving Part: Semi Shield (Pacheon 430m, 88 Road Crossing 182m) , Box Driving 26m 4.Structure: 2 Maintenance Manholes, 3 Water Flow Controlling Valve Centers, 14 Air Controlling Valve Centers, 7 Water Drainage Valve Centers

Masan Port Development (Phase 1-1) PFI

The Business Performance details view. can you check Work Scope, Order, Period
· Location Public water, Gapo-dong, Masan-si, Gyungnam
· Order Masan Container Terminal Co.
· Period 2005.04~2011.03
· Scale Query Wall 980m(Container Pier 500m, Multi-Pier 480m) Container Pier 20,000DWT 2 berths Multi-purpose pier 30,000DWT 2 berths, Management Pier (320m) 1Berth Site Construction : 122,891 pyung(406,253㎡) - Container and hitreland:115,949 pyung(383,304㎡) - Management Pier:6,942 pyung(22,949㎡)

Gageum-Chilgeum Road Expansion and Pavement Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gaguem-myeon ~ Chilgum-dong area, Chungju-si, Chungbuk
· Order Chungju-city
· Period 2005.03~2010.03
· Scale Total : Total Expansion 6.9Km(Road 6.13Km, Bridge 786m/3ea) Alternative: Road 1.094km(B=12.5~35m), Bridge 680/1ea)

Detour Road alternative to Road 25 Construction (Yongdong-Dongeub)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yong-dong~Dong-eup, Changwon-si, Gyeongsangnam-do
· Order Changwon-City
· Period 2004.12~2009.12
· Scale - Earth Work ·Cutting: 663,229㎥/·Banking: 767,132㎥ /·Spoil: 235,808㎥ - Structure Work ·Youngchu Bridge(P.S.C BOX Bridge) : 520m(FCM:100+160@2+100) ·Ducksan Bridge (IPC Girder 405m + Edge Girder BOX 340m, 2,124ton) ·RAMP-D Bridge (Edge Girder BOX) : 149m , 352ton ·RAMP-E Bridge (Edge Girder BOX) : 320m , 980ton ·Duckcheon 1 Bridge (Edge Girder BOX) : 40m , 169ton ·Towol Bridge (Deep Corrugated Steel Plates) : 14.5m ·Somock 1 & 2 Bridge (Rigid Frame Bridge) : 30m/2ea - Tunnel Work ·Jeongbyung tunnel (2.2km) both ways, NATM method - Gateway ·2 gateways[Namsan IC(trumpet type) 1set, Towal IC connecting road:1 gateway] - Other Electric work, mechanic work 1 set

Busan Shinhangman Accessing Railway

The Business Performance details view. can you check Work Scope, Order, Period
· Location Songjung-dong~Busan New Port area, Gangseo-gu, Busan
· Order Busn Port Construction Office
· Period 2004.12~2008.09
· Scale Expansion : L= 2,770.74M(South container), 2,591.21M(North Container) Track construction : 5,839M Bridge work : L=2,443.50M (PSC Box girder , Steel box girder, Through Arch, PSC Beam)

Busan-Geojae Connecting Road Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gadukdo, Busan~Jangmok-myeon, Geojae-si, Gyungnam
· Order GK Fixed Link Co.
· Period 2004.12~2010.11
· Scale L = 8.2KM Structure Work 1)Cabe Strayed Bridge L=3.5KM(Main Preliminary Bridge 1.87KM Sub-Preliminary Bridge 1.65KM) 2)Submerged tunnel L=3.7KM 3)Land Tunnel etc. L=1.0KM

Jeonju-Gwangyang National Highway No. 27 Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Starting Point :Geumsang-dong ,Deokjin-gu, Jeonju-si, Jeonbuk Ending Point: Yongheung-ri ,Yongjin-myeon ,Wanju-gun, Jeonbuk
· Order Korea Expressway Corporation
· Period 2004.12~2011.12
· Scale - Earth Work: Cutting: 2,153,000 ㎥ Banking: 2,206,000 ㎥ - Drainage Work: Drainage Pipeline : 54ea/1,799M Conduit : 23ea/973M - Structure Work: Bridge: 10ea/1261M - Pavement Work Concrete Pavement : 49,000㎥ Asphalt Pavement: 763 a - Tunnel Work: 2ea/268M - Related Facility: Entrance 2ea(Jeonju JCT, East Jeonju IC)