We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Boryeong LNG Terminal Project

    Order
    Boryeong LNG Terminal Co., Ltd.
    Period
    2013.05~2019.06
    Scale
    [Level 1&2] -LNG Tank: 200,000 m3 x 4 group (Full Containment Type)
    Perform Form
    EPC
    더보기

    Seoul Forest SK V1 Tower

    Period
    2013.05~2014.07
    Scale
    Gross Area : 11,647 pyung, Land Area : 1,567 pyung 4 floors underground and 20 floors above the ground
    더보기

    Saudi jajan refinery construction

    Order
    ARAMCO
    Period
    2013.04~
    Perform Form
    EPC
  • Gajaeul New Town redevelopment 4th Zone

    Period
    2013.04~2015.11
    Scale
    3floors below ground, 33floors above ground 4,300 units Gross Area: 712,921.383㎡

    Turkey, Eurasia Tunnel Project

    Order
    ATAS
    Period
    2013.04~2017.03
    Scale
    1. The total length of 14.6 km 2. TBM Tunnel 3.3 km / NATM Tunnel 1.9 km
    더보기

    Taean 9,10 Thermal Unit Mechatronics Corporation

    Order
    Korea Western Power
    Period
    2013.03~2017.04
    Commercialization
    No. 9 : 2016-09-30 No. 10 : 2017-04-30
    Scale
    1,050MW X 2 groups
    Perform Form
    Construction
    더보기
  • Bujeon~Masan double track electrification private capital project

    Order
    Smart Rail
    Period
    2013.02~2019.01
    Scale
    Earthwork: 11.5km Bridges: 6.1km (West Nakdong River Bridge, Joman Bridge, Gwandong Bridge, Sinwol Bridge, etc.) Tunnels: 13.0km (Shield 2.7km, NATM 10.3km) (Shield Nakdong Tunnel) (NATM ? Gaehwa Tunnel, Geumbyeong Tunnel, Yuha Tunnel) Stations: 5 (Bujeon, Sasang, Gimhae Airport, Garak IC and Jangyu) Signal boxes: 2 (Chilsan Signal Box, Jinrye Signal Box)

    PDH(Propane Dehydrogenation) Project

    Order
    SK Advanced
    Period
    2013.01~2016.02
    Scale
    Plottage 32,000py Capacity: 600 KTPA (Propylene production standards )
    Perform Form
    EPC
    더보기

    Cheongju Dormitory Construction

    Period
    2012.11~2014.04
    Scale
    Construction area : 609 pyung, Gross Area : 11,445 pyung
    더보기
  • Siheung baegot SK VIEW

    Period
    2012.11~2015.07
    Scale
    1floors below ground, 25-29floors above ground 1,442 units in 17 buildings

    Singapore, Cable Tunnel NS2 Project

    Order
    SP POWER ASSETS
    Period
    2012.10~2018.06
    Scale
    1. The total length : 5.38 km (Slurry TBM: 2 units) 2. Shaft 3 points (Permanent 3 places) 3. Building 3 points (Ventilation 2 points + Equipment 1 point)
    더보기

    Singapore, Cable Tunnel EW2 Project

    Order
    SP POWER ASSETS
    Period
    2012.10~2016.12
    Scale
    1. The total length : 6.8km (Slurry TBM: 3 units) 2. Shafts: 4 points (Permanent 3 points , Temporary 1 point) 3. Utility Buildings: 3 points
    더보기

Boryeong LNG Terminal Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Boryeong-si, Chungcheongnam-do, Korea
· Order Boryeong LNG Terminal Co., Ltd.
· Period 2013.05~2019.06
· Scale [Level 1&2] -LNG Tank: 200,000 m3 x 4 group (Full Containment Type)
· Perform Form EPC

Seoul Forest SK V1 Tower

The Business Performance details view. can you check Work Scope, Order, Period
· Location 284-55, Seongsu-dong 2(i)-ga, Seongdong-gu, Seoul, Korea
· Period 2013.05~2014.07
· Scale Gross Area : 11,647 pyung, Land Area : 1,567 pyung 4 floors underground and 20 floors above the ground

Saudi jajan refinery construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Saudi Arabia
· Order ARAMCO
· Period 2013.04~
· Perform Form EPC

Gajaeul New Town redevelopment 4th Zone

The Business Performance details view. can you check Work Scope, Order, Period
· Location 124, Namgajwa-dong, Seodaemun-gu, Seoul, Korea
· Period 2013.04~2015.11
· Scale 3floors below ground, 33floors above ground 4,300 units Gross Area: 712,921.383㎡

Turkey, Eurasia Tunnel Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Burhan Felek Caddesi, 1. Cevreyolu Sokak, 34668 Haydarpa?a, Uskudar / ?stanbul
· Order ATAS
· Period 2013.04~2017.03
· Scale 1. The total length of 14.6 km 2. TBM Tunnel 3.3 km / NATM Tunnel 1.9 km

Taean 9,10 Thermal Unit Mechatronics Corporation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Taean-gun, Chungcheongnam-do, Korea
· Order Korea Western Power
· Period 2013.03~2017.04
· Commercialization No. 9 : 2016-09-30 No. 10 : 2017-04-30
· Scale 1,050MW X 2 groups
· Perform Form Construction

Bujeon~Masan double track electrification private capital project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Bucheon-dong, Busanjin-gu ~ Jinrye-myeon, Gimhae, Southern Gyeongsang-do
· Order Smart Rail
· Period 2013.02~2019.01
· Scale Earthwork: 11.5km Bridges: 6.1km (West Nakdong River Bridge, Joman Bridge, Gwandong Bridge, Sinwol Bridge, etc.) Tunnels: 13.0km (Shield 2.7km, NATM 10.3km) (Shield Nakdong Tunnel) (NATM ? Gaehwa Tunnel, Geumbyeong Tunnel, Yuha Tunnel) Stations: 5 (Bujeon, Sasang, Gimhae Airport, Garak IC and Jangyu) Signal boxes: 2 (Chilsan Signal Box, Jinrye Signal Box)

PDH(Propane Dehydrogenation) Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan-si, Korea
· Order SK Advanced
· Period 2013.01~2016.02
· Scale Plottage 32,000py Capacity: 600 KTPA (Propylene production standards )
· Perform Form EPC

Cheongju Dormitory Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 125, Hyangjeong-dong, Heungdeok-gu, Cheongju-si, Chungcheongbuk-do, Korea
· Period 2012.11~2014.04
· Scale Construction area : 609 pyung, Gross Area : 11,445 pyung

Siheung baegot SK VIEW

The Business Performance details view. can you check Work Scope, Order, Period
· Location 1772-1, Jeongwang-dong, Siheung-si, Gyeonggi-do, Korea
· Period 2012.11~2015.07
· Scale 1floors below ground, 25-29floors above ground 1,442 units in 17 buildings

Singapore, Cable Tunnel NS2 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 15A Ang Mo Kio Avenue 1 singapore 569984
· Order SP POWER ASSETS
· Period 2012.10~2018.06
· Scale 1. The total length : 5.38 km (Slurry TBM: 2 units) 2. Shaft 3 points (Permanent 3 places) 3. Building 3 points (Ventilation 2 points + Equipment 1 point)

Singapore, Cable Tunnel EW2 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 5 May Road, Singapore 328593
· Order SP POWER ASSETS
· Period 2012.10~2016.12
· Scale 1. The total length : 6.8km (Slurry TBM: 3 units) 2. Shafts: 4 points (Permanent 3 points , Temporary 1 point) 3. Utility Buildings: 3 points