BUSINESS Business Performance

  • Singapore DTL3 C930 Project

    Order
    Land Transport Authority (LTA)
    Period
    2011.04~2016.12
    Scale
    - TBM Tunnel: 940 m (2Lines) - Cut & Cover Tunnel: 39m - Station 1 location: 148m
    더보기

    Construction of counter facilities to improve the calmness of Gamcheon Port

    Order
    Busan Port Construction Office, Busan Regional Maritime Affairs and Port Office
    Period
    2011.03~2013.09
    Scale
    - South breakwater (new): L=350m - Training dike (new): L=240m - Reinforcement of the existing East-West breakwater - Other appurtenant work
    더보기

    Daegu Line East Daegu and Youngchun roadbed double-track first tool, a Corporation

    Order
    Korea Rail Network Authority
    Period
    2011.02~2016.12
    Scale
    [ Total length : 9.45km] - Earthwork : 2.68km - Bridge : 4.51km (5 places) - Station : 2.26km (2 places) - Temporary Line : 0.66km (1 point)
    더보기
  • The tool Highway Route 30 (Sangju-Yeongdeok) Between construction

    Order
    Korea Highway Corporation
    Period
    2010.07~2016.12
    Scale
    - Extended 4.34km - Bridge three places (0.945㎞) - Tunnel 2 points (2.969㎞)
    더보기

    India, Padur Oil storage site construction

    Order
    Indian Strategic Petroleum Reserves Limited
    Period
    2010.05~2015.04
    Scale
    1. crude oil storage 1.5MMT, saving Co- : 3.572km
    더보기

    Construction of the counter facilities (phase 2-1) of the Pohang Yeongil Bay Port

    Order
    Pohang Regional Maritime Affairs & Port Office
    Period
    2010.03~2012.11
    Scale
    - Counter facilities: 1,026m (including connectors of 25.64m) - Reinforcement of the existing north breakwater 50m (reinforcement of the front wave dissipation block and superstructure) - Other appurtenant work: Aids to Navigation
  • Construction of Section 918 of Phase-III of Seoul Subway Line 9

    Order
    Seoul Metropolitan Infrastructure Headquarters
    Period
    2010.02~2016.02
    Scale
    - Subway length L=1.29㎞ - 1 station - 3 ventilation openings
    더보기

    Phase 3 to build 918 Seoul Subway Line 9 Corporation

    Order
    The Seoul Metropolitan Office of Urban Infrastructure Division
    Period
    2010.02~2017.02
    Scale
    - Metro extension L = 1.29㎞ - 3 points excavation zone - Stops in one place - Vent 3 points - 2 points tunnel
    더보기

    Paengseong - Oseong road construction

    Order
    Busan Jinhae Free Economic Zone Authority
    Period
    2009.12~2016.12
    Scale
    [ Chapter opened L = 5.60km] (B = 27.00m 6 round trip by car) - Section Sat : 410,348㎥, - Sat. gender : 1,189,673㎥, net banking : 1,237,332㎥ - Cancer going : 1,156m / 25 points, - Drain : 1,608m / 33 points - Sogyoryang : 137m / 5 points, - Span bridge : 1,210m / 1 places (Pyeongtaek Bridge: 110 + 160 + 90 + 50 @ 6 cursed tower cable-stayed bridge girder + PF ) - Ball Packaging Others
    더보기
  • Sosa- Seokdong, opening a road between Construction

    Order
    Busan Jinhae Free Economic Zone Authority
    Period
    2009.11~2018.03
    Scale
    - Earthwork : 278,520 M3 ( mowing ), 433,472M3 ( Building ) - Drain hole : 7 points / 440M ( culverts ball) - Tunnel Ball : 12,095M ( bi-directional)
    더보기

    Yongma Privately Financed Construction Projects a tunnel.

    Order
    Yongma tunnel Corp.,
    Period
    2009.11~2014.11
    Scale
    - Extension L = 3.56km - 1 point tunnel (2.5km) - Three places Bridges
    더보기

    Construction of the roadbed for section 2-2 of the Honam High-Speed Railway

    Order
    Korea Rail Network Authority
    Period
    2009.11~2013.06
    Scale
    - Length 10.3km - 6 bridges (5.34㎞) - Earthwork: 8 locations (4.90㎞) - One tunnel (0.06㎞)
    더보기

Singapore DTL3 C930 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 40A Ubi Avenue 2, Singapore 408900
· Order Land Transport Authority (LTA)
· Period 2011.04~2016.12
· Scale - TBM Tunnel: 940 m (2Lines) - Cut & Cover Tunnel: 39m - Station 1 location: 148m

Construction of counter facilities to improve the calmness of Gamcheon Port

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK E&C, 4th floor, 909-3, Dadae-dong, Saha-gu, Busan
· Order Busan Port Construction Office, Busan Regional Maritime Affairs and Port Office
· Period 2011.03~2013.09
· Scale - South breakwater (new): L=350m - Training dike (new): L=240m - Reinforcement of the existing East-West breakwater - Other appurtenant work

Daegu Line East Daegu and Youngchun roadbed double-track first tool, a Corporation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do ~ Dong-gu, Daegu, Korea
· Order Korea Rail Network Authority
· Period 2011.02~2016.12
· Scale [ Total length : 9.45km] - Earthwork : 2.68km - Bridge : 4.51km (5 places) - Station : 2.26km (2 places) - Temporary Line : 0.66km (1 point)

The tool Highway Route 30 (Sangju-Yeongdeok) Between construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dalsan-myeon, Yeongdeok-gun, Gyeongsangbuk-do, Korea
· Order Korea Highway Corporation
· Period 2010.07~2016.12
· Scale - Extended 4.34km - Bridge three places (0.945㎞) - Tunnel 2 points (2.969㎞)

India, Padur Oil storage site construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Padur, Karnataka India
· Order Indian Strategic Petroleum Reserves Limited
· Period 2010.05~2015.04
· Scale 1. crude oil storage 1.5MMT, saving Co- : 3.572km

Construction of the counter facilities (phase 2-1) of the Pohang Yeongil Bay Port

The Business Performance details view. can you check Work Scope, Order, Period
· Location (791-948) 14-3, Yonghan-ri, Heunghae-eup, Buk-gu, Pohang, Northern Gyeongsang-do
· Order Pohang Regional Maritime Affairs & Port Office
· Period 2010.03~2012.11
· Scale - Counter facilities: 1,026m (including connectors of 25.64m) - Reinforcement of the existing north breakwater 50m (reinforcement of the front wave dissipation block and superstructure) - Other appurtenant work: Aids to Navigation

Construction of Section 918 of Phase-III of Seoul Subway Line 9

The Business Performance details view. can you check Work Scope, Order, Period
· Location Seongji Bldg., 193-9, Jamsil-dong, Songpa-gu, Seoul
· Order Seoul Metropolitan Infrastructure Headquarters
· Period 2010.02~2016.02
· Scale - Subway length L=1.29㎞ - 1 station - 3 ventilation openings

Phase 3 to build 918 Seoul Subway Line 9 Corporation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Samjeon-dong (District) at Jamsil hospital ~ 86, Jamsil-dong, Songpa-gu, Seoul, Korea ~
· Order The Seoul Metropolitan Office of Urban Infrastructure Division
· Period 2010.02~2017.02
· Scale - Metro extension L = 1.29㎞ - 3 points excavation zone - Stops in one place - Vent 3 points - 2 points tunnel

Paengseong - Oseong road construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dujeong-ri, Paengseong-eup, Pyeongtaek-si, Gyeonggi-do, Korea
· Order Busan Jinhae Free Economic Zone Authority
· Period 2009.12~2016.12
· Scale [ Chapter opened L = 5.60km] (B = 27.00m 6 round trip by car) - Section Sat : 410,348㎥, - Sat. gender : 1,189,673㎥, net banking : 1,237,332㎥ - Cancer going : 1,156m / 25 points, - Drain : 1,608m / 33 points - Sogyoryang : 137m / 5 points, - Span bridge : 1,210m / 1 places (Pyeongtaek Bridge: 110 + 160 + 90 + 50 @ 6 cursed tower cable-stayed bridge girder + PF ) - Ball Packaging Others

Sosa- Seokdong, opening a road between Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jinhae-gu, Changwon-si, Gyeongsangnam-do, Korea
· Order Busan Jinhae Free Economic Zone Authority
· Period 2009.11~2018.03
· Scale - Earthwork : 278,520 M3 ( mowing ), 433,472M3 ( Building ) - Drain hole : 7 points / 440M ( culverts ball) - Tunnel Ball : 12,095M ( bi-directional)

Yongma Privately Financed Construction Projects a tunnel.

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jungnang-gu, Seoul, Korea
· Order Yongma tunnel Corp.,
· Period 2009.11~2014.11
· Scale - Extension L = 3.56km - 1 point tunnel (2.5km) - Three places Bridges

Construction of the roadbed for section 2-2 of the Honam High-Speed Railway

The Business Performance details view. can you check Work Scope, Order, Period
· Location 358, Sindang-ri, Gwangseok-myeon, Nonsan, Southern Chungcheong-do
· Order Korea Rail Network Authority
· Period 2009.11~2013.06
· Scale - Length 10.3km - 6 bridges (5.34㎞) - Earthwork: 8 locations (4.90㎞) - One tunnel (0.06㎞)