BUSINESS Business Performance

  • Wirye new city community energy facilities construction work

    Order
    SK E&S
    Period
    2014.07~2017.03
    Scale
    430 MW
    Perform Form
    EPC
    더보기

    Donghae sewer maintenance business (Cheongok , songjeong , samhwa mound)

    Order
    Donghae-si, Gangwon-do, Korea
    Period
    2014.07~2018.01
    Scale
    [ Donghae cheongokdong , Songjeong , samhwadong sections] - New installation (D80~D450): 45,583m - Replace (D300 ~ D1000): 11,562m - Bo Number: 208 places full complement 3,531m, REPAIR
    더보기

    Centumriver SK VIEW

    Period
    2014.06~2017.01
    Scale
    5 floors below ground, 29 floors above ground 529 units in 6 buildings Gross Area: 80,674.1485㎡
    더보기
  • Bujeon- Masan Double Track Railway Concession construction

    Order
    Smart Rail Corp.,
    Period
    2014.05~2020.06
    Scale
    - Earthwork : L = 11.5㎞ - Bridge : L = 6.1㎞ ( up Nakdong River Bridge, Bridge joman Kanto Bridge, New Moon bridges , etc.) - Tunnel : L = 13.0㎞ (Shield: 2.7㎞, NATM: 10.3㎞) - Station 5 points ( failure, ideas , BM01, BM02, Jiang ) - Sharing section : L = 2.2㎞ - A signal in two places ( chilsan , jinrye )
    더보기

    Iraq Karbala refinery construction

    Order
    SCOP
    Period
    2014.05~2019.11
    Perform Form
    EPC

    KNPC Clean Fuel Project

    Order
    KNPC
    Period
    2014.04~2017.12
    Perform Form
    EPC
  • FORT HILLS SE Project (FHSE)

    Order
    SUNCOR
    Period
    2014.04~2017.06
    Perform Form
    EPC
    더보기

    Army Gapyeong Yangju BTL

    Period
    2014.04~2016.06
    Scale
    Articles in 2 places , 2 places of accommodation officers, military dormitory 4 places
    더보기

    SKMS 2nd Research Institute

    Period
    2014.03~2015.11
    Scale
    Land Area : 31,266 pyung , Gross Area : 5,219 pyung Group Research Building , private research building , the same facilities , etc
  • SK Hynix Icheon women's dormitory

    Period
    2014.03~2015.08
    Scale
    Land Area : 7,535 pyung Gross Area : 30,219 pyung
    더보기

    M14 Project PH-1 Project

    Order
    SK Hynix
    Period
    2014.03~2015.07
    Scale
    - Based on the world's largest single- Fab - 66,000M2, 2 -layer structure clean room
    Perform Form
    EPC
    더보기

    Highway above the 14 line between Ulsan , Miryang - construction (fifth section)

    Order
    Korea Highway Corporation
    Period
    2014.02~2021.02
    Scale
    Total length L = 8.02km 1) Tunnel : 7,947km / 1 places 2) Earthwork : Cut 168,652m3 3) drain hole : the drain pipe (55.9m / 5 places) , culverts (15.6m / 1 places) 4) Ball Packaging : Packaging of cement (50,330m3), asphalt concrete pavement (3a) 5) ball bag : 1 set
    더보기

Wirye new city community energy facilities construction work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Seongnam-si, Gyeonggi-do, Korea
· Order SK E&S
· Period 2014.07~2017.03
· Scale 430 MW
· Perform Form EPC

Donghae sewer maintenance business (Cheongok , songjeong , samhwa mound)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Donghae cheongokdong , Songjeong , samhwadong sections
· Order Donghae-si, Gangwon-do, Korea
· Period 2014.07~2018.01
· Scale [ Donghae cheongokdong , Songjeong , samhwadong sections] - New installation (D80~D450): 45,583m - Replace (D300 ~ D1000): 11,562m - Bo Number: 208 places full complement 3,531m, REPAIR

Centumriver SK VIEW

The Business Performance details view. can you check Work Scope, Order, Period
· Location 2166, Yeonsan-dong, Yeonje-gu, Busan, Korea
· Period 2014.06~2017.01
· Scale 5 floors below ground, 29 floors above ground 529 units in 6 buildings Gross Area: 80,674.1485㎡

Bujeon- Masan Double Track Railway Concession construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Busanjin-gu ~ Gangseo-gu, Busan, Korea
· Order Smart Rail Corp.,
· Period 2014.05~2020.06
· Scale - Earthwork : L = 11.5㎞ - Bridge : L = 6.1㎞ ( up Nakdong River Bridge, Bridge joman Kanto Bridge, New Moon bridges , etc.) - Tunnel : L = 13.0㎞ (Shield: 2.7㎞, NATM: 10.3㎞) - Station 5 points ( failure, ideas , BM01, BM02, Jiang ) - Sharing section : L = 2.2㎞ - A signal in two places ( chilsan , jinrye )

Iraq Karbala refinery construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Iraq
· Order SCOP
· Period 2014.05~2019.11
· Perform Form EPC

KNPC Clean Fuel Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Kuwait
· Order KNPC
· Period 2014.04~2017.12
· Perform Form EPC

FORT HILLS SE Project (FHSE)

The Business Performance details view. can you check Work Scope, Order, Period
· Order SUNCOR
· Period 2014.04~2017.06
· Perform Form EPC

Army Gapyeong Yangju BTL

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gapyeong-gun / Yangju-si / Uijeongbu-si, Gyeonggi-do, Korea
· Period 2014.04~2016.06
· Scale Articles in 2 places , 2 places of accommodation officers, military dormitory 4 places

SKMS 2nd Research Institute

The Business Performance details view. can you check Work Scope, Order, Period
· Location 382-7, Jangcheon-ri, Seolseong-myeon, Icheon-si, Gyeonggi-do, Korea
· Period 2014.03~2015.11
· Scale Land Area : 31,266 pyung , Gross Area : 5,219 pyung Group Research Building , private research building , the same facilities , etc

SK Hynix Icheon women's dormitory

The Business Performance details view. can you check Work Scope, Order, Period
· Location 1-9, Daeheung-ri, Daewol-myeon, Icheon-si, Gyeonggi-do, Korea
· Period 2014.03~2015.08
· Scale Land Area : 7,535 pyung Gross Area : 30,219 pyung

M14 Project PH-1 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Icheon-si, Gyeonggi-do, Korea
· Order SK Hynix
· Period 2014.03~2015.07
· Scale - Based on the world's largest single- Fab - 66,000M2, 2 -layer structure clean room
· Perform Form EPC

Highway above the 14 line between Ulsan , Miryang - construction (fifth section)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gorye-ri, Danjang-myeon, Miryang-si ~ Seon-ri, Wondong-myeon, Yangsan-si, Gyeongsangnam-do, Korea
· Order Korea Highway Corporation
· Period 2014.02~2021.02
· Scale Total length L = 8.02km 1) Tunnel : 7,947km / 1 places 2) Earthwork : Cut 168,652m3 3) drain hole : the drain pipe (55.9m / 5 places) , culverts (15.6m / 1 places) 4) Ball Packaging : Packaging of cement (50,330m3), asphalt concrete pavement (3a) 5) ball bag : 1 set