  • Pohang LNG Connecting Pipeline

    Work Scope
    Capacity : - Gas Pipeline 16" x 12.5 km
    Order
    Pohang Steel Corp. (Korea)
    Period
    1998.02~1999.09
    Scale
    Capacity : - Gas Pipeline 16" x 12.5 km
    Perform Form
    ED,PR CN,CO

    (N0.1, 2)Lube Base Oil Plant Project

    Work Scope
    Vacuum Distillation 15,000, 15,000 BARREL Catalytic Dewaxing 5,000, 7,000 BARREL
    Order
    SK Corporation (Ulsan, Korea)
    Period
    1997~2004
    Scale
    Vacuum Distillation 15,000, 15,000 BARREL Catalytic Dewaxing 5,000, 7,000 BARREL
    더보기

    Polyester Film Plant

    Order
    SKC
    Period
    1996.01~1998.03
    Scale
    7,500 MTPY
  • EB/SM Project

    Work Scope
    460,000 MTPY
    Order
    SK Oxy Chemical
    Period
    1995.09~1996.12
    Scale
    EB 460,000 MTPY, SM 260,000 MTPY
    Perform Form
    ED,PR CN,CO
    더보기

    2nd Para-Xylene Manufacturing Facility Project

    Order
    SK Corp.
    Period
    1995.05~1996.12
    Scale
    PX 330,000 MTPY, Benzene 60,000 MTPY
    더보기

    Synthetic Resin Manufacturing Facility Project

    Order
    SK Corp.
    Period
    1995.05~1996.11
    Scale
    PE 100,000 MTPY, PP 135,000 MTPY
    더보기
  • 2nd Naphtha Cracking Center Expansion Project (NCC)

    Work Scope
    155,000 to 245,000 MTPY
    Order
    SK Corp.
    Period
    1995.03~1997.04
    Scale
    155,000 MTPY to 245,000 MTPY
    Perform Form
    ED,PR CN,CO
    더보기

    No2. PE/PP Plant Project

    Work Scope
    PE 100,000MTPY PP 135,000MTPY
    Order
    SK Corporation (Ulsan, Korea)
    Period
    1995~1996
    Scale
    PE 100,000MTPY PP 135,000MTPY
    더보기

    FCC Manufacturing Project

    Order
    SK Corp.
    Period
    1994.07~1996.06
    Scale
    RFCC 50,000 BPSD, RHDS 60,000 BPSD Hydrogen 80 MMSCFD, Gasoline Sweetening 30,000 BPSD MTBE 1,500 BPSD, Alkylation 6,000 BPSD Sulfur : 230t/d x 2 trains
    더보기
  • 3rd Sulfur Recovery Facility Project

    Order
    SK Corp.
    Period
    1993.10~1995.09
    Scale
    Sulfur 60 MT/Day x 2 Units
    더보기

    4th Gas Oil Hydro Disulfurizatio Facility Project

    Order
    SK Corp.
    Period
    1993.10~1995.07
    Scale
    LGO Hydrotreater 50,000 BPSD Kerosene Hydrotreater 50,000 BPSD

    4th Ordinary Distillation Facility Expansion Project

    Order
    SK Corp.
    Period
    1993.09~1994.03
    Scale
    200,000 BPSD to 270,000 BPSD
    더보기

Pohang LNG Connecting Pipeline

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope Capacity : - Gas Pipeline 16" x 12.5 km
· Order Pohang Steel Corp. (Korea)
· Period 1998.02~1999.09
· Scale Capacity : - Gas Pipeline 16" x 12.5 km
· Perform Form ED,PR CN,CO

(N0.1, 2)Lube Base Oil Plant Project

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope Vacuum Distillation 15,000, 15,000 BARREL Catalytic Dewaxing 5,000, 7,000 BARREL
· Order SK Corporation (Ulsan, Korea)
· Period 1997~2004
· Scale Vacuum Distillation 15,000, 15,000 BARREL Catalytic Dewaxing 5,000, 7,000 BARREL

Polyester Film Plant

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order SKC
· Period 1996.01~1998.03
· Scale 7,500 MTPY

EB/SM Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Work Scope 460,000 MTPY
· Order SK Oxy Chemical
· Period 1995.09~1996.12
· Scale EB 460,000 MTPY, SM 260,000 MTPY
· Perform Form ED,PR CN,CO

2nd Para-Xylene Manufacturing Facility Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order SK Corp.
· Period 1995.05~1996.12
· Scale PX 330,000 MTPY, Benzene 60,000 MTPY

Synthetic Resin Manufacturing Facility Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order SK Corp.
· Period 1995.05~1996.11
· Scale PE 100,000 MTPY, PP 135,000 MTPY

2nd Naphtha Cracking Center Expansion Project (NCC)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Work Scope 155,000 to 245,000 MTPY
· Order SK Corp.
· Period 1995.03~1997.04
· Scale 155,000 MTPY to 245,000 MTPY
· Perform Form ED,PR CN,CO

No2. PE/PP Plant Project

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope PE 100,000MTPY PP 135,000MTPY
· Order SK Corporation (Ulsan, Korea)
· Period 1995~1996
· Scale PE 100,000MTPY PP 135,000MTPY

FCC Manufacturing Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order SK Corp.
· Period 1994.07~1996.06
· Scale RFCC 50,000 BPSD, RHDS 60,000 BPSD Hydrogen 80 MMSCFD, Gasoline Sweetening 30,000 BPSD MTBE 1,500 BPSD, Alkylation 6,000 BPSD Sulfur : 230t/d x 2 trains

3rd Sulfur Recovery Facility Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order SK Corp.
· Period 1993.10~1995.09
· Scale Sulfur 60 MT/Day x 2 Units

4th Gas Oil Hydro Disulfurizatio Facility Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order SK Corp.
· Period 1993.10~1995.07
· Scale LGO Hydrotreater 50,000 BPSD Kerosene Hydrotreater 50,000 BPSD

4th Ordinary Distillation Facility Expansion Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order SK Corp.
· Period 1993.09~1994.03
· Scale 200,000 BPSD to 270,000 BPSD