  • Construction of the main stadium for the 2014 Incheon Asian Games

    Period
    2011.06~2014.06
    Scale
    Main stadium (5 floors above ground, seats : 61,074 (including 30,770 variable seats)) Auxiliary stadium (1 floor below ground, seats : 5,034) Ancillary facilities (ticket booths, rest rooms, etc.) Total area: 113,620m2
    더보기

    Electric works for the Mokpo-Jangheung section of National expressway No. 10 (section 3)

    Period
    2010.12~2012.03
    Scale
    ■ Total length 13.78Km ■ Electric work for exits: 1 location [Jangheung exit] ■ CCTV street lamp electric work: 1 location ■ Electric work for tunnels: 6 locations [Gangjin 1 tunnel, Gangjin 2 tunnel, Gangjin 3 tunnel, Jangheung 1 tunnel, Jangheung 2 tunnel, Jangheung 3 tunnel] ■ Electric work for offices: 1 location [Jangheung office] ■ Electric work for temporary service areas: 1 location [Jangheung temporary service area]
    더보기

    Busan new port truck service area construction

    Period
    2010.11~2011.10
    Scale
    Service area bldg. (4 floors above ground), gas station bldg. (2 floors above ground), car wash bldg. (1 floor above ground), repair shop bldg. (2 floors above ground), waste water treatment bldg. (1 floor above ground) Total area: 7,802m2
    더보기
  • South Daejeon truck stop

    Period
    2010.11~2011.07
    Scale
    Management bldg., maintenance bldg. (trucks and passenger cars), automatic car wash, LNG refueling station (office bldg.), gas station bldg. Total area: 2,639.03m2
    더보기

    Yeoksam-dong K-Office construction

    Period
    2010.11~2012.12
    Scale
    5 floors below ground /19 floors above ground Total area: 15,380.6m2
    더보기

    Construction of the Handball Stadium

    Period
    2010.06~2011.10
    Scale
    3 floors above ground, one floor below ground, seats : 5,000 in total ■ Remodeling of the Olympic Park Fencing Stadium into a Handball Stadium - 1st construction: 17,336.76㎡ - 2nd construction: 1,952.28㎡
    더보기
  • Pyeongtaek PMO office construction

    Period
    2010.05~2012.04
    Scale
    1. 1st construction (cafeteria bldg.): 1F 2. 2nd construction (office bldg.): 1~2F Total area: 7,953m2
    더보기

    Extension of the Walkerhill parking building

    Period
    2010.03~2011.11
    Scale
    5 floors above ground, 3 floors below ground, total area: 27,188.66m2
    더보기

    Construction of the National Naju Museum

    Period
    2010.01~2013.01
    Scale
    Single-story bldg. with 2 floors below ground Total area: 11,086.34m2
    더보기
  • Business facilities in Block C-3 of Pangyo Techno Valley

    Period
    2009.10~2013.03
    Scale
    4-5BL:4 floors below ground ~10 floors above ground 4-6BL: 4 floors below ground ~ 11 floors above ground 4-7BL: 4 floors below ground ~ 7F, 8F and 9F above ground Total area: 154,940m2
    더보기

    Gangnam N-Tower construction

    Period
    2009.10~2011.11
    Scale
    20 floors above ground, 6 floors below ground Total area: 45,307.44m2
    더보기

    Construction of the Daejeon CT Center

    Period
    2009.06~2010.10
    Scale
    Four-story bldg. with 2 floors below ground Total area: 17,129.8m2
    더보기

Construction of the main stadium for the 2014 Incheon Asian Games

The Business Performance details view. can you check Work Scope, Order, Period
· Location 378, Yeonhee-dong, Seo-gu, Incheon
· Period 2011.06~2014.06
· Scale Main stadium (5 floors above ground, seats : 61,074 (including 30,770 variable seats)) Auxiliary stadium (1 floor below ground, seats : 5,034) Ancillary facilities (ticket booths, rest rooms, etc.) Total area: 113,620m2

Electric works for the Mokpo-Jangheung section of National expressway No. 10 (section 3)

The Business Performance details view. can you check Work Scope, Order, Period
· Location (529-811) Buchun-ri, Busan-myeon, Jangheung-gun, Southern Jeolla Province
· Period 2010.12~2012.03
· Scale ■ Total length 13.78Km ■ Electric work for exits: 1 location [Jangheung exit] ■ CCTV street lamp electric work: 1 location ■ Electric work for tunnels: 6 locations [Gangjin 1 tunnel, Gangjin 2 tunnel, Gangjin 3 tunnel, Jangheung 1 tunnel, Jangheung 2 tunnel, Jangheung 3 tunnel] ■ Electric work for offices: 1 location [Jangheung office] ■ Electric work for temporary service areas: 1 location [Jangheung temporary service area]

Busan new port truck service area construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 498, Gaman-1-dong, Nam-gu, Busan
· Period 2010.11~2011.10
· Scale Service area bldg. (4 floors above ground), gas station bldg. (2 floors above ground), car wash bldg. (1 floor above ground), repair shop bldg. (2 floors above ground), waste water treatment bldg. (1 floor above ground) Total area: 7,802m2

South Daejeon truck stop

The Business Performance details view. can you check Work Scope, Order, Period
· Location (300-300) 313-5, Guro-dong, Dong-gu, Daejeon
· Period 2010.11~2011.07
· Scale Management bldg., maintenance bldg. (trucks and passenger cars), automatic car wash, LNG refueling station (office bldg.), gas station bldg. Total area: 2,639.03m2

Yeoksam-dong K-Office construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 678-39, Yeoksam-dong, Gangnam-gu, Seoul and 3 lots
· Period 2010.11~2012.12
· Scale 5 floors below ground /19 floors above ground Total area: 15,380.6m2

Construction of the Handball Stadium

The Business Performance details view. can you check Work Scope, Order, Period
· Location Fencing Stadium at 88-2, Bangi-dong, Songpa-gu, Seoul
· Period 2010.06~2011.10
· Scale 3 floors above ground, one floor below ground, seats : 5,000 in total ■ Remodeling of the Olympic Park Fencing Stadium into a Handball Stadium - 1st construction: 17,336.76㎡ - 2nd construction: 1,952.28㎡

Pyeongtaek PMO office construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Near USAG-Humphreys at 43, Dongchang-ri, Paengseong-eup, Pyeongtaek, Gyeonggi-do
· Period 2010.05~2012.04
· Scale 1. 1st construction (cafeteria bldg.): 1F 2. 2nd construction (office bldg.): 1~2F Total area: 7,953m2

Extension of the Walkerhill parking building

The Business Performance details view. can you check Work Scope, Order, Period
· Location 22-1, Gwangjang-dong, Gwangjin-gu, Seoul and 173 lots
· Period 2010.03~2011.11
· Scale 5 floors above ground, 3 floors below ground, total area: 27,188.66m2

Construction of the National Naju Museum

The Business Performance details view. can you check Work Scope, Order, Period
· Location (520-922) Sinchon-ri, Bannam-myeon, Naju, Southern Jeolla-do
· Period 2010.01~2013.01
· Scale Single-story bldg. with 2 floors below ground Total area: 11,086.34m2

Business facilities in Block C-3 of Pangyo Techno Valley

The Business Performance details view. can you check Work Scope, Order, Period
· Location Blocks No. 4-5, 6 and 7 in the Pangyo residential lot development district, Sampyeong-dong, Bundang-gu, Seongnam, Gyeonggi-do
· Period 2009.10~2013.03
· Scale 4-5BL:4 floors below ground ~10 floors above ground 4-6BL: 4 floors below ground ~ 11 floors above ground 4-7BL: 4 floors below ground ~ 7F, 8F and 9F above ground Total area: 154,940m2

Gangnam N-Tower construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location (135-820) 119, Honhyeon-2-dong, Gangnam-gu, Seoul
· Period 2009.10~2011.11
· Scale 20 floors above ground, 6 floors below ground Total area: 45,307.44m2

Construction of the Daejeon CT Center

The Business Performance details view. can you check Work Scope, Order, Period
· Location Inside the Expo Science park, 3-1, Doryong-dong, Yuseong-gu, Daejeon
· Period 2009.06~2010.10
· Scale Four-story bldg. with 2 floors below ground Total area: 17,129.8m2