BUSINESS Business Performance

  • Opo-Pogok period (2nd) extended road paving work

    Order
    Construction Headquarters, Gyeonggi Province
    Period
    2011.11~2017.10
    Scale
    Road extension : 6.2Km, 4 car (B = 18.5m) - 2 points span bridge (720m) - Sogyoryang 11 points (453.5m) - Cloverleaf four places ( Pogok IC, Sinwon IC, Dongrim IC, Rngwon IC)
    더보기

    Construction of the 2nd phase facilities of the 2nd Osan Runway

    Order
    Defense Installation Agency
    Period
    2011.04~2013.09
    Scale
    - 2nd runway 2,743m, taxiway 470m - Rainwater pipes and culverts 10,146m - Water supply and drainage pipes 6,957m - Patriot/Vulcan cannon command post, accommodations and 33 buildings, Total area3,782㎡ - Flood control pump and air-conditioning, sanitary facilities - Electrical, communication and fire-fighting facilities
    더보기

    Singapore DTL3 C930 Project

    Order
    Land Transport Authority (LTA)
    Period
    2011.04~2016.12
    Scale
    - TBM Tunnel: 940 m (2Lines) - Cut & Cover Tunnel: 39m - Station 1 location: 148m
    더보기
  • Construction of counter facilities to improve the calmness of Gamcheon Port

    Order
    Busan Port Construction Office, Busan Regional Maritime Affairs and Port Office
    Period
    2011.03~2013.09
    Scale
    - South breakwater (new): L=350m - Training dike (new): L=240m - Reinforcement of the existing East-West breakwater - Other appurtenant work
    더보기

    Daegu Line East Daegu and Youngchun roadbed double-track first tool, a Corporation

    Order
    Korea Rail Network Authority
    Period
    2011.02~2016.12
    Scale
    [ Total length : 9.45km] - Earthwork : 2.68km - Bridge : 4.51km (5 places) - Station : 2.26km (2 places) - Temporary Line : 0.66km (1 point)
    더보기

    The tool Highway Route 30 (Sangju-Yeongdeok) Between construction

    Order
    Korea Highway Corporation
    Period
    2010.07~2016.12
    Scale
    - Extended 4.34km - Bridge three places (0.945㎞) - Tunnel 2 points (2.969㎞)
    더보기
  • India, Padur Oil storage site construction

    Order
    Indian Strategic Petroleum Reserves Limited
    Period
    2010.05~2015.04
    Scale
    1. crude oil storage 1.5MMT, saving Co- : 3.572km
    더보기

    Construction of the counter facilities (phase 2-1) of the Pohang Yeongil Bay Port

    Order
    Pohang Regional Maritime Affairs & Port Office
    Period
    2010.03~2012.11
    Scale
    - Counter facilities: 1,026m (including connectors of 25.64m) - Reinforcement of the existing north breakwater 50m (reinforcement of the front wave dissipation block and superstructure) - Other appurtenant work: Aids to Navigation

    Construction of Section 918 of Phase-III of Seoul Subway Line 9

    Order
    Seoul Metropolitan Infrastructure Headquarters
    Period
    2010.02~2016.02
    Scale
    - Subway length L=1.29㎞ - 1 station - 3 ventilation openings
    더보기
  • Phase 3 to build 918 Seoul Subway Line 9 Corporation

    Order
    The Seoul Metropolitan Office of Urban Infrastructure Division
    Period
    2010.02~2017.02
    Scale
    - Metro extension L = 1.29㎞ - 3 points excavation zone - Stops in one place - Vent 3 points - 2 points tunnel
    더보기

    Paengseong - Oseong road construction

    Order
    Busan Jinhae Free Economic Zone Authority
    Period
    2009.12~2016.12
    Scale
    [ Chapter opened L = 5.60km] (B = 27.00m 6 round trip by car) - Section Sat : 410,348㎥, - Sat. gender : 1,189,673㎥, net banking : 1,237,332㎥ - Cancer going : 1,156m / 25 points, - Drain : 1,608m / 33 points - Sogyoryang : 137m / 5 points, - Span bridge : 1,210m / 1 places (Pyeongtaek Bridge: 110 + 160 + 90 + 50 @ 6 cursed tower cable-stayed bridge girder + PF ) - Ball Packaging Others
    더보기

    Sosa- Seokdong, opening a road between Construction

    Order
    Busan Jinhae Free Economic Zone Authority
    Period
    2009.11~2018.03
    Scale
    - Earthwork : 278,520 M3 ( mowing ), 433,472M3 ( Building ) - Drain hole : 7 points / 440M ( culverts ball) - Tunnel Ball : 12,095M ( bi-directional)
    더보기

Opo-Pogok period (2nd) extended road paving work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Pogok-eup, Cheoin-gu, Yongin-si, Gyeonggi-do, Korea
· Order Construction Headquarters, Gyeonggi Province
· Period 2011.11~2017.10
· Scale Road extension : 6.2Km, 4 car (B = 18.5m) - 2 points span bridge (720m) - Sogyoryang 11 points (453.5m) - Cloverleaf four places ( Pogok IC, Sinwon IC, Dongrim IC, Rngwon IC)

Construction of the 2nd phase facilities of the 2nd Osan Runway

The Business Performance details view. can you check Work Scope, Order, Period
· Location 700, Jeokbong-ri, Seotan-myeon, Pyeongtaek, Gyeonggi Province
· Order Defense Installation Agency
· Period 2011.04~2013.09
· Scale - 2nd runway 2,743m, taxiway 470m - Rainwater pipes and culverts 10,146m - Water supply and drainage pipes 6,957m - Patriot/Vulcan cannon command post, accommodations and 33 buildings, Total area3,782㎡ - Flood control pump and air-conditioning, sanitary facilities - Electrical, communication and fire-fighting facilities

Singapore DTL3 C930 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 40A Ubi Avenue 2, Singapore 408900
· Order Land Transport Authority (LTA)
· Period 2011.04~2016.12
· Scale - TBM Tunnel: 940 m (2Lines) - Cut & Cover Tunnel: 39m - Station 1 location: 148m

Construction of counter facilities to improve the calmness of Gamcheon Port

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK E&C, 4th floor, 909-3, Dadae-dong, Saha-gu, Busan
· Order Busan Port Construction Office, Busan Regional Maritime Affairs and Port Office
· Period 2011.03~2013.09
· Scale - South breakwater (new): L=350m - Training dike (new): L=240m - Reinforcement of the existing East-West breakwater - Other appurtenant work

Daegu Line East Daegu and Youngchun roadbed double-track first tool, a Corporation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do ~ Dong-gu, Daegu, Korea
· Order Korea Rail Network Authority
· Period 2011.02~2016.12
· Scale [ Total length : 9.45km] - Earthwork : 2.68km - Bridge : 4.51km (5 places) - Station : 2.26km (2 places) - Temporary Line : 0.66km (1 point)

The tool Highway Route 30 (Sangju-Yeongdeok) Between construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dalsan-myeon, Yeongdeok-gun, Gyeongsangbuk-do, Korea
· Order Korea Highway Corporation
· Period 2010.07~2016.12
· Scale - Extended 4.34km - Bridge three places (0.945㎞) - Tunnel 2 points (2.969㎞)

India, Padur Oil storage site construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Padur, Karnataka India
· Order Indian Strategic Petroleum Reserves Limited
· Period 2010.05~2015.04
· Scale 1. crude oil storage 1.5MMT, saving Co- : 3.572km

Construction of the counter facilities (phase 2-1) of the Pohang Yeongil Bay Port

The Business Performance details view. can you check Work Scope, Order, Period
· Location (791-948) 14-3, Yonghan-ri, Heunghae-eup, Buk-gu, Pohang, Northern Gyeongsang-do
· Order Pohang Regional Maritime Affairs & Port Office
· Period 2010.03~2012.11
· Scale - Counter facilities: 1,026m (including connectors of 25.64m) - Reinforcement of the existing north breakwater 50m (reinforcement of the front wave dissipation block and superstructure) - Other appurtenant work: Aids to Navigation

Construction of Section 918 of Phase-III of Seoul Subway Line 9

The Business Performance details view. can you check Work Scope, Order, Period
· Location Seongji Bldg., 193-9, Jamsil-dong, Songpa-gu, Seoul
· Order Seoul Metropolitan Infrastructure Headquarters
· Period 2010.02~2016.02
· Scale - Subway length L=1.29㎞ - 1 station - 3 ventilation openings

Phase 3 to build 918 Seoul Subway Line 9 Corporation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Samjeon-dong (District) at Jamsil hospital ~ 86, Jamsil-dong, Songpa-gu, Seoul, Korea ~
· Order The Seoul Metropolitan Office of Urban Infrastructure Division
· Period 2010.02~2017.02
· Scale - Metro extension L = 1.29㎞ - 3 points excavation zone - Stops in one place - Vent 3 points - 2 points tunnel

Paengseong - Oseong road construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dujeong-ri, Paengseong-eup, Pyeongtaek-si, Gyeonggi-do, Korea
· Order Busan Jinhae Free Economic Zone Authority
· Period 2009.12~2016.12
· Scale [ Chapter opened L = 5.60km] (B = 27.00m 6 round trip by car) - Section Sat : 410,348㎥, - Sat. gender : 1,189,673㎥, net banking : 1,237,332㎥ - Cancer going : 1,156m / 25 points, - Drain : 1,608m / 33 points - Sogyoryang : 137m / 5 points, - Span bridge : 1,210m / 1 places (Pyeongtaek Bridge: 110 + 160 + 90 + 50 @ 6 cursed tower cable-stayed bridge girder + PF ) - Ball Packaging Others

Sosa- Seokdong, opening a road between Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jinhae-gu, Changwon-si, Gyeongsangnam-do, Korea
· Order Busan Jinhae Free Economic Zone Authority
· Period 2009.11~2018.03
· Scale - Earthwork : 278,520 M3 ( mowing ), 433,472M3 ( Building ) - Drain hole : 7 points / 440M ( culverts ball) - Tunnel Ball : 12,095M ( bi-directional)