  • Changwon Square 7 Construction Project

    Order
    Changwon City
    Period
    1992.12~1994.04
    Scale
    Road Expansion 1,745m 4 Lanes Arterial Road B=50m L=800M, Approaching Road B=8.25m L=450m, Underground Road B=17m H=5m L=495m A=85m2, Method: S.C.W Construction Area: 5,947m2
    더보기

    Ansan New City Phase 2 Construction Project Section 1

    Order
    Korea Water Resource Corp.
    Period
    1992.08~2003.08
    Scale
    Complex size 30,248,073㎡, Earth Work 4,16,000㎥, Road in the Complex 31.9km, Rainfall work 46,037m, Sewage Work 34,680m, Waterworks 36,789m, River Improvement Work 3387m, Bridge B=25-30 L= 150m / 3 ea
    더보기

    Yoogong Port 6 Mooring Capability Improvement Project

    Order
    SK Corp.
    Period
    1992.06~1993.02
    Scale
    Anchorage Dredging to maintain the water deep over 15m for 70,000DWT grade Vessle approaching Dredging area 168,136m2 Anchorage dredging 304,664m2
  • U-1-1 Reserve Base Construction Phase 1

    Order
    Korea National Oil Corporation
    Period
    1991.06~1996.11
    Scale
    CAVERN (18X30) 5,77m CONSTRUCTION TUNNEL 2,968m WATERCURTAIN TUNNEL 2,597m SHAFT TUNNEL 177m Total Expansion 12,522m, Approaching Road 3.1Km, Total Expansion of Tunnel 11,759m, Tunnel Total Sectional Area 268,292m2 Oil Reserve Amount 18,000,000 BBL (2,862,500m3)
    더보기

    Ganam-Janghowon Road Expansion and Pavement Project

    Order
    Seoul Regional Homeland Development Office
    Period
    1991.06~1996.07
    Scale
    Road Expansion L=14.79Km 10.69Km Expended 4.1Km Newly Constructed B=20m Earth Work: Cutting 316,253m3, Banking 340,577m3, Structure Work: 1 Elevated Road L=120m, 2 Bridges 295m, Retaining Wall 161m Pavement Work: Base 2,755a Surface 3,041a
    더보기

    Gogyung-Angang Road Expansion and Pavement Project

    Order
    Busan Regional Homeland Management Agency
    Period
    1990.12~1994.12
    Scale
    Road Expansion L= 11.764Km B=18.5m Earth Work: Cutting 724,706m3 Banking 866,581m3 Drainage Work: Drain Pipe 2,524m 48 pipes, Conduit 1,1168m 34 ea Structure Work: Bridge 544.57m 6 Bridges, Retaining Wall 1,025m Pavement Work: Surface 2,335a Base 2,317a
  • Bunyoung Bridge Construction Works

    Order
    Ulsan
    Period
    1990.12~1994.11
    Scale
    Road Expansion L= 340m B=25m, Span 54m Basic-RCD PILE D1500:74ea D1000:36ea
    더보기

    Foundation construction order of northern training dike for new harbor in Gunjang

    Order
    Gunsan Port Construction Office
    Period
    1990.08~1997.10
    Scale
    Expansion of Training Levee 7.1Km Dock Drainage Work: Hume Pipe 18,238m(250-1200) BOX 6,413m Pavement Work: 1,725A(Ascon), T.T.P 50,589EA Roubble Stone 823,856m3, Armour Stone 117,489m3
    더보기

    Sejongro Underground Car Park Construction Project

    Order
    Seoul Metropolitan Government
    Period
    1990.03~1992.11
    Scale
    Site Area: 9,158m2 Size : 6 Basements (incl. Terminal) Method : Cast-in-site diaphragms wall
    더보기
  • Gwacheon Line (Geumjeong-Sadang) Double-track Railway Section 7 Construction Project

    Order
    KORAIL
    Period
    1989.12~1993.07
    Scale
    Total Expansion 1,273.5m Main Line 509m, Station 205.0m, NATM TUNNEL 559.5m Drainage Work Rainfall Pipe 1,321m Sewage pipe 493m Pavement work Pavement 14,857m2 Concrete Pavement 3,116m2
    더보기

    Gumi Industrial Parks Arterial Road Construction Phase 1

    Order
    Korea Water Resource Corp.
    Period
    1989.12~1993.07
    Scale
    Road Expansion L= 13.68Km B=18.5m Earth Work: Cutting 95,062m3 Banking 308,435m3 Drainage Work : Drainage pipe 2,346m 60ea, Conduit 69m 43ea Structure Work: Bridge 447.17m 4ea Pavement Work: Surface 2,505a Base 2,318a
    더보기

    Changwon-Jangyoo Road Construction Project

    Order
    Gyungnam
    Period
    1989.11~1994.02
    Scale
    Road expansion L=6.96Km B=12.0m Earth Work: Cutting 646,082m3 Banking 403,879m3 Drainage work: Drainage pipe 1,387m 16ea Pavement Work: Base 875a Surface 1,108a

Changwon Square 7 Construction Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sangdong-gu, Changwon-si, Gyeongsangnam-do
· Order Changwon City
· Period 1992.12~1994.04
· Scale Road Expansion 1,745m 4 Lanes Arterial Road B=50m L=800M, Approaching Road B=8.25m L=450m, Underground Road B=17m H=5m L=495m A=85m2, Method: S.C.W Construction Area: 5,947m2

Ansan New City Phase 2 Construction Project Section 1

The Business Performance details view. can you check Work Scope, Order, Period
· Location 1-164, Choji-dong, Ansan-si, Gyeonggi
· Order Korea Water Resource Corp.
· Period 1992.08~2003.08
· Scale Complex size 30,248,073㎡, Earth Work 4,16,000㎥, Road in the Complex 31.9km, Rainfall work 46,037m, Sewage Work 34,680m, Waterworks 36,789m, River Improvement Work 3387m, Bridge B=25-30 L= 150m / 3 ea

Yoogong Port 6 Mooring Capability Improvement Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Existing SUPER DOLPHIN Area, Super Dolphin, Yongjam-dong, Nam-gu, Ulsan
· Order SK Corp.
· Period 1992.06~1993.02
· Scale Anchorage Dredging to maintain the water deep over 15m for 70,000DWT grade Vessle approaching Dredging area 168,136m2 Anchorage dredging 304,664m2

U-1-1 Reserve Base Construction Phase 1

The Business Performance details view. can you check Work Scope, Order, Period
· Location 1195-1, Nakpo-dong, Yeocheon-si, Junnam
· Order Korea National Oil Corporation
· Period 1991.06~1996.11
· Scale CAVERN (18X30) 5,77m CONSTRUCTION TUNNEL 2,968m WATERCURTAIN TUNNEL 2,597m SHAFT TUNNEL 177m Total Expansion 12,522m, Approaching Road 3.1Km, Total Expansion of Tunnel 11,759m, Tunnel Total Sectional Area 268,292m2 Oil Reserve Amount 18,000,000 BBL (2,862,500m3)

Ganam-Janghowon Road Expansion and Pavement Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location ohgung-ri, Gamgok-myeon, Eumsung-gun, Chungnam~Gunjang-ri, Ganam-myeon, Gyeonggi-do
· Order Seoul Regional Homeland Development Office
· Period 1991.06~1996.07
· Scale Road Expansion L=14.79Km 10.69Km Expended 4.1Km Newly Constructed B=20m Earth Work: Cutting 316,253m3, Banking 340,577m3, Structure Work: 1 Elevated Road L=120m, 2 Bridges 295m, Retaining Wall 161m Pavement Work: Base 2,755a Surface 3,041a

Gogyung-Angang Road Expansion and Pavement Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Angang-eub, Gyungju-si, Gyungbuk
· Order Busan Regional Homeland Management Agency
· Period 1990.12~1994.12
· Scale Road Expansion L= 11.764Km B=18.5m Earth Work: Cutting 724,706m3 Banking 866,581m3 Drainage Work: Drain Pipe 2,524m 48 pipes, Conduit 1,1168m 34 ea Structure Work: Bridge 544.57m 6 Bridges, Retaining Wall 1,025m Pavement Work: Surface 2,335a Base 2,317a

Bunyoung Bridge Construction Works

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dal-dong, Nam-gu~Okgyo-dong, Jung-gu area, Ulsan
· Order Ulsan
· Period 1990.12~1994.11
· Scale Road Expansion L= 340m B=25m, Span 54m Basic-RCD PILE D1500:74ea D1000:36ea

Foundation construction order of northern training dike for new harbor in Gunjang

The Business Performance details view. can you check Work Scope, Order, Period
· Location Estuarine of Guemgang River, Seocheon-gun, Chungnam and Okegu-gun, Junbuk
· Order Gunsan Port Construction Office
· Period 1990.08~1997.10
· Scale Expansion of Training Levee 7.1Km Dock Drainage Work: Hume Pipe 18,238m(250-1200) BOX 6,413m Pavement Work: 1,725A(Ascon), T.T.P 50,589EA Roubble Stone 823,856m3, Armour Stone 117,489m3

Sejongro Underground Car Park Construction Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sejongro, Jongro-gu, Seoul
· Order Seoul Metropolitan Government
· Period 1990.03~1992.11
· Scale Site Area: 9,158m2 Size : 6 Basements (incl. Terminal) Method : Cast-in-site diaphragms wall

Gwacheon Line (Geumjeong-Sadang) Double-track Railway Section 7 Construction Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Geumjung~Sadang, Gwacheon-si, Gyeonggi-do
· Order KORAIL
· Period 1989.12~1993.07
· Scale Total Expansion 1,273.5m Main Line 509m, Station 205.0m, NATM TUNNEL 559.5m Drainage Work Rainfall Pipe 1,321m Sewage pipe 493m Pavement work Pavement 14,857m2 Concrete Pavement 3,116m2

Gumi Industrial Parks Arterial Road Construction Phase 1

The Business Performance details view. can you check Work Scope, Order, Period
· Location 393, Maehoi-ri, Imgo-myeon, Youngchun-si, Gyungbuk
· Order Korea Water Resource Corp.
· Period 1989.12~1993.07
· Scale Road Expansion L= 13.68Km B=18.5m Earth Work: Cutting 95,062m3 Banking 308,435m3 Drainage Work : Drainage pipe 2,346m 60ea, Conduit 69m 43ea Structure Work: Bridge 447.17m 4ea Pavement Work: Surface 2,505a Base 2,318a

Changwon-Jangyoo Road Construction Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Namsan-dong, Changwon-si~Mugye-ri, Jangyu-myeon, Gimhea-gun, Gyungnam
· Order Gyungnam
· Period 1989.11~1994.02
· Scale Road expansion L=6.96Km B=12.0m Earth Work: Cutting 646,082m3 Banking 403,879m3 Drainage work: Drainage pipe 1,387m 16ea Pavement Work: Base 875a Surface 1,108a