BUSINESS Business Performance

  • Turkey, 3rd Bosporus Bridge Project

    Order
    ICA Ictas-Astaldi JV
    Period
    2013.06~2016.11
    Scale
    1. The total length of 2,164m ( main span 1,408m), Bridge width 54.4m ( eight lane road + railway 2tracks) 2. A complex geometry pylons world's largest suspension bridge , president of the 322m high
    더보기

    Qatar, Doha Metro Red Line North Project

    DECC station

    Order
    Qatar Railways Company
    Period
    2013.06~2018.08
    Scale
    1. Twin TBM Tunnel (11.69km, TBM : 4대 ) 2. 6 Station (1.74km) 3. Trough Structure, Emergency Exit 2개소
    더보기

    Turkey, Eurasia Tunnel Project

    Order
    ATAS
    Period
    2013.04~2017.03
    Scale
    1. The total length of 14.6 km 2. TBM Tunnel 3.3 km / NATM Tunnel 1.9 km
    더보기
  • Bujeon~Masan double track electrification private capital project

    Order
    Smart Rail
    Period
    2013.02~2019.01
    Scale
    Earthwork: 11.5km Bridges: 6.1km (West Nakdong River Bridge, Joman Bridge, Gwandong Bridge, Sinwol Bridge, etc.) Tunnels: 13.0km (Shield 2.7km, NATM 10.3km) (Shield Nakdong Tunnel) (NATM ? Gaehwa Tunnel, Geumbyeong Tunnel, Yuha Tunnel) Stations: 5 (Bujeon, Sasang, Gimhae Airport, Garak IC and Jangyu) Signal boxes: 2 (Chilsan Signal Box, Jinrye Signal Box)

    Singapore, Cable Tunnel NS2 Project

    Order
    SP POWER ASSETS
    Period
    2012.10~2018.06
    Scale
    1. The total length : 5.38 km (Slurry TBM: 2 units) 2. Shaft 3 points (Permanent 3 places) 3. Building 3 points (Ventilation 2 points + Equipment 1 point)
    더보기

    Singapore, Cable Tunnel EW2 Project

    Order
    SP POWER ASSETS
    Period
    2012.10~2016.12
    Scale
    1. The total length : 6.8km (Slurry TBM: 3 units) 2. Shafts: 4 points (Permanent 3 points , Temporary 1 point) 3. Utility Buildings: 3 points
    더보기
  • Janglim - Jinhae main pipe construction

    Order
    Korea Gas Corporation
    Period
    2012.10~2016.03
    Scale
    Buried main pipe : 30"" ""× 16.96km - Supply Bureau : 2 new locations ( Chinhae G / S, the signal B / V) - Proven testing, installation and operation yard
    더보기

    Geoje - Masan construction Route 3

    Order
    Busan Regional Construction Management Administration
    Period
    2012.07~2020.06
    Scale
    - Extension 6.4km (B = 20.0m, round 4 lanes ) - Cut 1.25 million ㎥ - Fill 890 000 ㎥ - Sato 710 000 ㎥ - Culvert nine places (462m) - Bridge 11 points (1.88km) - 5 points tunnel (1.91km) - Packaging gongoe
    더보기

    Seongmun national industrial complex wastewater treatment plant construction work

    Order
    LH Corporation
    Period
    2012.06~2016.12
    Scale
    - Management equipment and copper, water treatment facilities - East Building Ground Floor 1,2 - Inflow pipe (D800mm, L = 79m) - Discharge pipe Athletics period D700mm, L = 666m : Maritime zone D700mm, L = 824m
    더보기
  • Step 2 Aewol port development projects

    Order
    Jeju Special Self-Governing Province
    Period
    2012.03~2017.02
    Scale
    ○ outside facilities : 1,465m - Joan seobangpa 513m, par northern breakwater 602m, Northern breakwater 250m, east breakwater 100m) ○ berthing facilities : 270m Sand Pier 110m, 160m cement pier ○ Water facility ( one way routes and marina ) ○ connecting Joan ( the upright ): 60m ○ dredging and reclamation : 1 set ○ existing breakwater and the pier removed : 1 set ○ Other troops ball ○ city planning road : one way
    더보기

    The Metropolitan Rail (Suseo~Pyeongtaek) Article 8 Other new tools roadbed construction

    Order
    Korea Rail Network Authority
    Period
    2012.01~2016.06
    Scale
    - Earthwork : 1,694m - U-Type: 486m - Excavation BOX: 100m - Excavation tunnel : 660m - NATM: 722m - Stereoscopic viaducts : one place
    더보기

    Turkey Istanbul Road Project (Turnkey EPC)

    Order
    DLH (General Directorate of Railways, Harbours, and Airports Construction under the Ministry of Transportation of Turkey)
    Period
    2012.01~2016.07
    Scale
    - Total length: 14.6km - Width extension section: 8.8km (6~8 lanes) - new section: 5.8km (4 lanes) (including TBM 3.340m)
    더보기

Turkey, 3rd Bosporus Bridge Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location oyrazkoy 3rd bosphorus bridge construction site inside military zone, Beykoz, Istanbul (Asian Side)
· Order ICA Ictas-Astaldi JV
· Period 2013.06~2016.11
· Scale 1. The total length of 2,164m ( main span 1,408m), Bridge width 54.4m ( eight lane road + railway 2tracks) 2. A complex geometry pylons world's largest suspension bridge , president of the 322m high

Qatar, Doha Metro Red Line North Project

  • DECC station
  • Qassar Station
The Business Performance details view. can you check Work Scope, Order, Period
· Location Al Mara Business Tower, Suhaim Bin Hamad Street
· Order Qatar Railways Company
· Period 2013.06~2018.08
· Scale 1. Twin TBM Tunnel (11.69km, TBM : 4대 ) 2. 6 Station (1.74km) 3. Trough Structure, Emergency Exit 2개소

Turkey, Eurasia Tunnel Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Burhan Felek Caddesi, 1. Cevreyolu Sokak, 34668 Haydarpa?a, Uskudar / ?stanbul
· Order ATAS
· Period 2013.04~2017.03
· Scale 1. The total length of 14.6 km 2. TBM Tunnel 3.3 km / NATM Tunnel 1.9 km

Bujeon~Masan double track electrification private capital project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Bucheon-dong, Busanjin-gu ~ Jinrye-myeon, Gimhae, Southern Gyeongsang-do
· Order Smart Rail
· Period 2013.02~2019.01
· Scale Earthwork: 11.5km Bridges: 6.1km (West Nakdong River Bridge, Joman Bridge, Gwandong Bridge, Sinwol Bridge, etc.) Tunnels: 13.0km (Shield 2.7km, NATM 10.3km) (Shield Nakdong Tunnel) (NATM ? Gaehwa Tunnel, Geumbyeong Tunnel, Yuha Tunnel) Stations: 5 (Bujeon, Sasang, Gimhae Airport, Garak IC and Jangyu) Signal boxes: 2 (Chilsan Signal Box, Jinrye Signal Box)

Singapore, Cable Tunnel NS2 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 15A Ang Mo Kio Avenue 1 singapore 569984
· Order SP POWER ASSETS
· Period 2012.10~2018.06
· Scale 1. The total length : 5.38 km (Slurry TBM: 2 units) 2. Shaft 3 points (Permanent 3 places) 3. Building 3 points (Ventilation 2 points + Equipment 1 point)

Singapore, Cable Tunnel EW2 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 5 May Road, Singapore 328593
· Order SP POWER ASSETS
· Period 2012.10~2016.12
· Scale 1. The total length : 6.8km (Slurry TBM: 3 units) 2. Shafts: 4 points (Permanent 3 points , Temporary 1 point) 3. Utility Buildings: 3 points

Janglim - Jinhae main pipe construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Songjeong-dong, Gangseo-gu, Busan, Korea
· Order Korea Gas Corporation
· Period 2012.10~2016.03
· Scale Buried main pipe : 30"" ""× 16.96km - Supply Bureau : 2 new locations ( Chinhae G / S, the signal B / V) - Proven testing, installation and operation yard

Geoje - Masan construction Route 3

The Business Performance details view. can you check Work Scope, Order, Period
· Location Naepo-ri, Gusan-myeon ~ Hyeondong, Masanhappo-gu, Changwon-si, Gyeongsangnam-do, Korea.
· Order Busan Regional Construction Management Administration
· Period 2012.07~2020.06
· Scale - Extension 6.4km (B = 20.0m, round 4 lanes ) - Cut 1.25 million ㎥ - Fill 890 000 ㎥ - Sato 710 000 ㎥ - Culvert nine places (462m) - Bridge 11 points (1.88km) - 5 points tunnel (1.91km) - Packaging gongoe

Seongmun national industrial complex wastewater treatment plant construction work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sambong-ri, Seongmun-myeon, Dangjin-gun, Chungcheongnam-do, Korea
· Order LH Corporation
· Period 2012.06~2016.12
· Scale - Management equipment and copper, water treatment facilities - East Building Ground Floor 1,2 - Inflow pipe (D800mm, L = 79m) - Discharge pipe Athletics period D700mm, L = 666m : Maritime zone D700mm, L = 824m

Step 2 Aewol port development projects

The Business Performance details view. can you check Work Scope, Order, Period
· Location Aewol port, Aewol-eup, Jeju-si, Jeju Special Self-Governing Province, Korea
· Order Jeju Special Self-Governing Province
· Period 2012.03~2017.02
· Scale ○ outside facilities : 1,465m - Joan seobangpa 513m, par northern breakwater 602m, Northern breakwater 250m, east breakwater 100m) ○ berthing facilities : 270m Sand Pier 110m, 160m cement pier ○ Water facility ( one way routes and marina ) ○ connecting Joan ( the upright ): 60m ○ dredging and reclamation : 1 set ○ existing breakwater and the pier removed : 1 set ○ Other troops ball ○ city planning road : one way

The Metropolitan Rail (Suseo~Pyeongtaek) Article 8 Other new tools roadbed construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jije-dong, Pyeongtaek-si, Gyeonggi-do, Korea
· Order Korea Rail Network Authority
· Period 2012.01~2016.06
· Scale - Earthwork : 1,694m - U-Type: 486m - Excavation BOX: 100m - Excavation tunnel : 660m - NATM: 722m - Stereoscopic viaducts : one place

Turkey Istanbul Road Project (Turnkey EPC)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Kısıklı Cad. Tekin-Ak ?? Merkezi No:3 K:1 D:5 34662 Altunizade, Istanbul
· Order DLH (General Directorate of Railways, Harbours, and Airports Construction under the Ministry of Transportation of Turkey)
· Period 2012.01~2016.07
· Scale - Total length: 14.6km - Width extension section: 8.8km (6~8 lanes) - new section: 5.8km (4 lanes) (including TBM 3.340m)