본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Daecheong Dam Emergency Spillway Construction

    Order
    Korea Water Resource Corp.
    Period
    2006.05~2009.04
    Scale
    Emergency Spillway and Gate Leaf installed Installation 1 set

    Haman-Pungsan Area Perimeter Road (City Road No. 181 and Shinpungro) Expansion and Pavement Project

    Order
    Korea Land Corporation (Seoul Headquaters)
    Period
    2006.04~2008.04
    Scale
    [City Road No. 181] L=2,218M, B=31M, Bridge 1ea, Underground Road 1ea [Shinpungro] L=1,240M, B=26M
    더보기

    Hanrim-Sangrim Road Construction

    Order
    Gyeongsangnam-do
    Period
    2006.03~2013.03
    Scale
    *Expansion and Width: L=14.34km B=20.0m(4 Lanes) *Earth Work -Cutting: 371,652㎥ Banking: 2,875,280㎥ Net Banking: 1,468,151㎥ Soft Ground Improvement Work: 8.544km(2,472,582m) *Bridge Work - Hwapo Bridge (Cable-Strayed Girder Bridge 520m), Other Bridges (798m/12ea) *Tunnel Work - Jangjae Tunnel (1,203m), Bongrim 1 Tunnel (672m), Bongrim 2 Tunnel (575m) *Construction, Mechanical , Electrical Work 1 Set
    더보기
  • KPPC Aromatics Complex Project

    Order
    KARO (Kuwait Aromatics Company)
    Period
    2006.02~2009.01
    Scale
    Paraxylene : 768,00T/Y, Benzene : 335,000T/Y, Light Naphtha : 801,000T/Y
    Perform Form
    EPC LSTK
    더보기

    Incheon 2nd Yeonyuk Bridge Connecting Road Construction (Section 4)

    Order
    Korea Expressway Corp.
    Period
    2006.02~2009.08
    Scale
    Main Line : L=998m Entrance : 2ea (Songdo JCT, Coast IC) Bridge : L=3,528m/7ea
    더보기

    Asan Beabang Area Development Project Section 3

    Order
    Korea National Housing Corporation
    Period
    2006.02~2009.04
    Scale
    Complex Construction:908,000m2 Drain pipe :17km, Conduit :1.4km Pavement :1,500a, Bridge :River Bridge 3ea (L=265m) IPC Girder 1 ea(L=40m) River work:594m
    더보기
  • Deagwanryung Alpensia Golf and Villa Section A Constructaion

    Order
    Kangwon Development Corporation
    Period
    2006.01~2008.06
    Scale
    Golf and Villa Area (573,255 Pyung) 27 holes of Membership Golf Club, Clubhouse (incl. Community center) etc, Hillside Villa 400 households
    더보기

    Donghea South Line, Busan~Ulsan Double-track Railway Section 3 Construction

    Order
    Korea Rail Network Authority
    Period
    2006.01~2010.12
    Scale
    Total expansion 7,754m Earth Work 2,203m Bridge 2,344m(6Bridges, Songjung Br., 1 Songjung elevated Br., 2 Songjung elevated Br. Suksan elevated Br.) Tunnel 3,207m(2Tunnels, Heawoondae Tunnel and Songjung Tunnel)
    더보기

    (N0. 3)Lube Base Oil Plant Project

    Work Scope
    Vacuum Distillation 25,000 BARREL Catalytic Dewaxing 9,000 BARREL
    Order
    Patra SK(Pertamina+SKE JV) (Dumai, Indonesia)
    Period
    2006~2008
    Scale
    Vacuum Distillation 25,000 BARREL Catalytic Dewaxing 9,000 BARREL
    더보기
  • KPPC Aromatics Project

    Order
    PIC (SHUAIBA, KUWAIT)
    Period
    2006~2008
    Scale
    Paraxylene 768,000MTPY Benzene 335,000MTPY Light Naphtha 801,000MTPY
    Perform Form
    EPC
    더보기

    HPPO Manucfacturing Facility Design and Construction

    Order
    SKC
    Period
    2005.12~2008.05
    더보기

    Pohang Hyoja SK VIEW Phase 2 Project

    Period
    2005.12~2008.05
    Scale
    4 Buildings of 31 Floors and 1 Basement (364 units) Gross Area: 72,593㎡
    더보기

Daecheong Dam Emergency Spillway Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Deachung dam area, Miho-dong, Deaduck-gu, Deajeon
· Order Korea Water Resource Corp.
· Period 2006.05~2009.04
· Scale Emergency Spillway and Gate Leaf installed Installation 1 set

Haman-Pungsan Area Perimeter Road (City Road No. 181 and Shinpungro) Expansion and Pavement Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Deokpung-dong/Sinjang-dong/Pungsan-dong ,Hanam-si, Gyeonggi-do
· Order Korea Land Corporation (Seoul Headquaters)
· Period 2006.04~2008.04
· Scale [City Road No. 181] L=2,218M, B=31M, Bridge 1ea, Underground Road 1ea [Shinpungro] L=1,240M, B=26M

Hanrim-Sangrim Road Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Starting point :Daesan-myeon, Changwon-si, Gyeongsangnam-do ~ End point: Saengnim-myeon, Gimhae-si, Gyeongsangnam-do
· Order Gyeongsangnam-do
· Period 2006.03~2013.03
· Scale *Expansion and Width: L=14.34km B=20.0m(4 Lanes) *Earth Work -Cutting: 371,652㎥ Banking: 2,875,280㎥ Net Banking: 1,468,151㎥ Soft Ground Improvement Work: 8.544km(2,472,582m) *Bridge Work - Hwapo Bridge (Cable-Strayed Girder Bridge 520m), Other Bridges (798m/12ea) *Tunnel Work - Jangjae Tunnel (1,203m), Bongrim 1 Tunnel (672m), Bongrim 2 Tunnel (575m) *Construction, Mechanical , Electrical Work 1 Set

KPPC Aromatics Complex Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Kuweit
· Order KARO (Kuwait Aromatics Company)
· Period 2006.02~2009.01
· Scale Paraxylene : 768,00T/Y, Benzene : 335,000T/Y, Light Naphtha : 801,000T/Y
· Perform Form EPC LSTK

Incheon 2nd Yeonyuk Bridge Connecting Road Construction (Section 4)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Songdon Intl City (Haesang)
· Order Korea Expressway Corp.
· Period 2006.02~2009.08
· Scale Main Line : L=998m Entrance : 2ea (Songdo JCT, Coast IC) Bridge : L=3,528m/7ea

Asan Beabang Area Development Project Section 3

The Business Performance details view. can you check Work Scope, Order, Period
· Location Baebang-myeon, Asan-si, Chungnam
· Order Korea National Housing Corporation
· Period 2006.02~2009.04
· Scale Complex Construction:908,000m2 Drain pipe :17km, Conduit :1.4km Pavement :1,500a, Bridge :River Bridge 3ea (L=265m) IPC Girder 1 ea(L=40m) River work:594m

Deagwanryung Alpensia Golf and Villa Section A Constructaion

The Business Performance details view. can you check Work Scope, Order, Period
· Location Suha-ri and Yongsan-ri area, Doam-myeon, Pyungchang-gun, Gangwon-do
· Order Kangwon Development Corporation
· Period 2006.01~2008.06
· Scale Golf and Villa Area (573,255 Pyung) 27 holes of Membership Golf Club, Clubhouse (incl. Community center) etc, Hillside Villa 400 households

Donghea South Line, Busan~Ulsan Double-track Railway Section 3 Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Woo-dong, Heawoondea-gu ~Gijang-eub, Gijang-gun, Busan area
· Order Korea Rail Network Authority
· Period 2006.01~2010.12
· Scale Total expansion 7,754m Earth Work 2,203m Bridge 2,344m(6Bridges, Songjung Br., 1 Songjung elevated Br., 2 Songjung elevated Br. Suksan elevated Br.) Tunnel 3,207m(2Tunnels, Heawoondae Tunnel and Songjung Tunnel)

(N0. 3)Lube Base Oil Plant Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Indonesia
· Work Scope Vacuum Distillation 25,000 BARREL Catalytic Dewaxing 9,000 BARREL
· Order Patra SK(Pertamina+SKE JV) (Dumai, Indonesia)
· Period 2006~2008
· Scale Vacuum Distillation 25,000 BARREL Catalytic Dewaxing 9,000 BARREL

KPPC Aromatics Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Kuweit
· Order PIC (SHUAIBA, KUWAIT)
· Period 2006~2008
· Scale Paraxylene 768,000MTPY Benzene 335,000MTPY Light Naphtha 801,000MTPY
· Perform Form EPC

HPPO Manucfacturing Facility Design and Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order SKC
· Period 2005.12~2008.05

Pohang Hyoja SK VIEW Phase 2 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 66-26, Hyoja-dong, Nam-gu, Pohang-si, Gyeongbuk
· Period 2005.12~2008.05
· Scale 4 Buildings of 31 Floors and 1 Basement (364 units) Gross Area: 72,593㎡