본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • India, Mangalore Crude oil reserve base construction

    Order
    Indian Strategic Petroleum Reserves Limited
    Period
    2009.04~2015.10
    Scale
    1. crude oil storage 1.25MMT, saving Co- : 2.800km
    더보기

    Singapore LNG Receiving Terminal FEED enhancement

    Work Scope
    Basic Design Competition
    Order
    Singapore LNG Terminal Pte. Ltd
    Period
    2009.04~2009.08
    Scale
    Basic Design Competition
    Perform Form
    FEED Competition

    Yeosu Coal Fired Power Plant, 2

    Order
    Korea South-East Power
    Period
    2009.03~2011.11
    Scale
    * Power Boiler : 1,085t/h - Manufacturer : Doosan - Type : Circulating Fluidized-Bed
    더보기
  • The new KTX 10-3A tools roadbed other construction

    Order
    Korea Rail Network Authority
    Period
    2009.02~2016.02
    Scale
    - Extension : 10.942km - Bridge : 219m 3 places - Tunnel : 1,150m (NATM: 260m, excavation BOX: 620m, U-TYPE: 270m) - Bokgae section : 507m - Press Viaduct : 4 points - Gadogyo : 8 points ( one improvement , new 7) - Temporary Line : 15.3km
    더보기

    Construction of the roadbed for Section 10-3A of the Gyeongbu High-Speed Railroad

    Order
    Korea Rail Network Authority
    Period
    2009.02~2014.08
    Scale
    - Total length: 10.942Km - Earthwork: 9.584Km - Bridge: 0.208Km (3 locations) - Tunnel: 1.150Km (NATM 260m, excavation 620m, Ramp 270m) - Ditch: One location - Multi-level crossing: 9 locations (one new, 8 improved) - Footbridge: 5 locations - Covered section: L=250m - Temporary line: 15.280Km
    더보기

    Construction of the electric power tunnel for supply of electric power to the Gangnam area (Nonil-Nonhyeon)

    Order
    KEPCO
    Period
    2008.12~2014.08
    Scale
    - Electric power tunnel L=3.344km - Increases power supply capacity to match increasing demand for electric power in Seocho-gu and Gangnam-gu, Seoul
    더보기
  • Pyeongtaek US Military base site development and construction of public infrastructure

    Order
    USACE FED Purchasing Department
    Period
    2008.12~2003.11
    Scale
    Area 2,330,000 m2 Soft ground improvement area: 1,220,000m2, Earthwork (soil brought in: 4,500,000m3, waste soil: 600,000m3) Rainwater drainage work: 29,000m Sewage work: 22,100m Water supply work: 32,600m
    더보기

    Pyeongtaek US base site preparation and public infrastructure construction

    Order
    FED
    Period
    2008.12~2017.11
    Scale
    - Land excavations , pipeline engineering, Road Parcel 2A creation of the area. - Parcel 1 & K construction of the pipeline area - Utilities within the existing site USAG Humphreys & Infrastructure Upgrade
    더보기

    SK Telesys Pangyo Research Center construction

    Period
    2008.12~2010.09
    Scale
    10 floors above ground, 5 floors below ground 9,933.77m2
    더보기
  • Highway No.12 Damyang-Seongsan Expansion work

    No.12 Damyang-Seongsan Expressway

    Work Scope
    -Length : 7.35km Bridges : 3 ea Tunnels : 4ea etc.
    Order
    Korea Expressway Corporation
    Period
    2008.12~2015.12
    Perform Form
    Bidding
    더보기

    Gwangmyeong Techno Park construction

    Period
    2008.11~2010.10
    Scale
    15-story bldg. with 2 floors below ground. Total area: 256,256.11m2
    더보기

    Extension of the SK Business Hall, College of Business Administration, Seoul National University

    Period
    2008.11~2009.09
    Scale
    4-story bldg, total area: 2,691.59m2
    더보기

India, Mangalore Crude oil reserve base construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Mangalore, Karnataka, India
· Order Indian Strategic Petroleum Reserves Limited
· Period 2009.04~2015.10
· Scale 1. crude oil storage 1.25MMT, saving Co- : 2.800km

Singapore LNG Receiving Terminal FEED enhancement

The Business Performance details view. can you check Work Scope, Order, Period
· Location Singapore
· Work Scope Basic Design Competition
· Order Singapore LNG Terminal Pte. Ltd
· Period 2009.04~2009.08
· Scale Basic Design Competition
· Perform Form FEED Competition

Yeosu Coal Fired Power Plant, 2

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yeosu, Korea
· Order Korea South-East Power
· Period 2009.03~2011.11
· Scale * Power Boiler : 1,085t/h - Manufacturer : Doosan - Type : Circulating Fluidized-Bed

The new KTX 10-3A tools roadbed other construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location The ground floor, Sincheon-dong, Dong-gu, Daegu, Korea
· Order Korea Rail Network Authority
· Period 2009.02~2016.02
· Scale - Extension : 10.942km - Bridge : 219m 3 places - Tunnel : 1,150m (NATM: 260m, excavation BOX: 620m, U-TYPE: 270m) - Bokgae section : 507m - Press Viaduct : 4 points - Gadogyo : 8 points ( one improvement , new 7) - Temporary Line : 15.3km

Construction of the roadbed for Section 10-3A of the Gyeongbu High-Speed Railroad

The Business Performance details view. can you check Work Scope, Order, Period
· Location 294-5, Sinam-4-dong, Dong-gu, Daegu
· Order Korea Rail Network Authority
· Period 2009.02~2014.08
· Scale - Total length: 10.942Km - Earthwork: 9.584Km - Bridge: 0.208Km (3 locations) - Tunnel: 1.150Km (NATM 260m, excavation 620m, Ramp 270m) - Ditch: One location - Multi-level crossing: 9 locations (one new, 8 improved) - Footbridge: 5 locations - Covered section: L=250m - Temporary line: 15.280Km

Construction of the electric power tunnel for supply of electric power to the Gangnam area (Nonil-Nonhyeon)

The Business Performance details view. can you check Work Scope, Order, Period
· Location 7th floor, Yoheyon Building, 242-29, Nonhyeon-2-dong, Gangnam-gu, Seoul
· Order KEPCO
· Period 2008.12~2014.08
· Scale - Electric power tunnel L=3.344km - Increases power supply capacity to match increasing demand for electric power in Seocho-gu and Gangnam-gu, Seoul

Pyeongtaek US Military base site development and construction of public infrastructure

The Business Performance details view. can you check Work Scope, Order, Period
· Location San-12, Dongchang-ri, Paengseong-eup, Pyeongtaek
· Order USACE FED Purchasing Department
· Period 2008.12~2003.11
· Scale Area 2,330,000 m2 Soft ground improvement area: 1,220,000m2, Earthwork (soil brought in: 4,500,000m3, waste soil: 600,000m3) Rainwater drainage work: 29,000m Sewage work: 22,100m Water supply work: 32,600m

Pyeongtaek US base site preparation and public infrastructure construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dongcha-ri, Paengseong-eup, Pyeongtaek-si, Gyeonggi-do, Korea
· Order FED
· Period 2008.12~2017.11
· Scale - Land excavations , pipeline engineering, Road Parcel 2A creation of the area. - Parcel 1 & K construction of the pipeline area - Utilities within the existing site USAG Humphreys & Infrastructure Upgrade

SK Telesys Pangyo Research Center construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Block D-2-1 of Pangyo Techno Valley, Seongnam, Gyeonggi-do
· Period 2008.12~2010.09
· Scale 10 floors above ground, 5 floors below ground 9,933.77m2

Highway No.12 Damyang-Seongsan Expansion work

  • No.12 Damyang-Seongsan Expressway
The Business Performance details view. can you check Work Scope, Order, Period
· Location Hapcheon, Korea
· Work Scope -Length : 7.35km Bridges : 3 ea Tunnels : 4ea etc.
· Order Korea Expressway Corporation
· Period 2008.12~2015.12
· Perform Form Bidding

Gwangmyeong Techno Park construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Urban Support Facilities, Soha Residential Lot Development District, Soha-dong, Gwangmyeong, Gyeonggi-do Gwangmyeong
· Period 2008.11~2010.10
· Scale 15-story bldg. with 2 floors below ground. Total area: 256,256.11m2

Extension of the SK Business Hall, College of Business Administration, Seoul National University

The Business Performance details view. can you check Work Scope, Order, Period
· Location Bldg. 58, College of Business Administration, Seoul National University, Sinrim-9-dong, Gwanak-gu, Seoul
· Period 2008.11~2009.09
· Scale 4-story bldg, total area: 2,691.59m2