본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Yongin-Seoul Freeway PFI Project Section 6

    Order
    Kyungsoo Highway Corporation
    Period
    2006.10~2009.06
    Scale
    - Earth Work: Cutting 809,721m³ Banking 524,266m³ Spoil 654,541m³ - Drainage Work: Drainage Pipeline 3,789m/136ea Conduit 332m/9ea Reinforced Earth Wall 5,119m² - Structure Work: Bridge 997m/10ea Steel Bridge Construction 4,567ton - Tunnel Work: Tunnel 5,626m/6ea - Pavement Work: Compound Aggregate 84,699m³ Ascon Pavement 58,222ton CONC Pavement 15,572m³
    더보기

    Utility Supply Facility Construction

    Period
    2006.09~2007.05
    Scale
    For SK Daeduck Institute of Tech. Promoter : SK E&C Daeduck Institute of Tech. Period : ’06.9~’07.5
    더보기

    Hyosung Extra High-Voltage Transformer Plant Construction in Namtong, China

    Period
    2006.09~2007.12
    Scale
    Total 40,175㎡ buildings for Extra High Voltage Transformer, Sheet Metal and Distribution Transformer. Winding Machines, Drying System, Crane (400t and others), Coating Line, Welding Line, Tester, etc. Promoter : Namtong Hyosung Transformer Corporation Period : 2006. 09. 29~2007. 12. 31
    더보기
  • Jeju Utd FC Players Lodge Project

    Order
    SK Corporation
    Period
    2006.08~2007.04
    Scale
    1 Lodge(building) of 3 Floors and 1 Basement Gross Area: 4,569.19㎡
    더보기

    Yeoido S-Trenue

    Order
    SK Networks
    Period
    2006.08~2009.08
    Scale
    - 1 Building of 7 Basements and 36 Floors - Land Area : 2,931m2 - Building Area : 1,745.01m2 - Gross Area : 39,898.56m2 - No. of Unit: 118units - Pyung-type : 48~125
    더보기

    SK Institute of Tech. Lab D Block Expansion Project

    Order
    SK Corporation
    Period
    2006.08~2007.08
    Scale
    1 Lab of 4 Floors and 1 Basement Gross Area: 7,322㎡
    더보기
  • Goyang Haengsin SK VIEW Phase 3 APT Construction

    Order
    Daemyung Construction Corporation
    Period
    2006.07~2008.12
    Scale
    7 APT Buildings of 25 Floors and 2 Basements Gross Area: 93,597.06㎡ (28,313.11PY)
    더보기

    Chungjungro SK VIEW Regional Housing Association

    Period
    2006.07~2008.08
    Scale
    3 Buildings of 12~20 Floors and 2 Basements Gross Area: 29,092㎡
    더보기

    Dongback Apelbaum Construction

    Order
    Morning Bridge, INC.
    Period
    2006.06~2008.11
    Scale
    122 Buildings of 2 Floors and 1 Basement Gross Area: 26,000㎡
    더보기
  • Metropolitan Integrated Logistics Center Construction Project

    Period
    2006.06~2007.09
    Scale
    SK Networks 2006. 06. 01~2007. 09. 30 Integrated Center for IT, Fashion and Wine buildings 50879.48㎡, Storage Rack, Sorting System, Various Packaging Machine, DAS, Hanger System
    더보기

    Paju Woonjung Phase 1 Area Development Section 1 Site Preparation Work

    Order
    Korea National Housing Corporation
    Period
    2006.06~2008.08
    Scale
    Complex Construction:1,706,000m2 Drainage Work:14.6km, Conduit :6.4km Pavement work :2,139a, Main Water Supply Line :16.3km
    더보기

    Dongrae SK VIEW Construction

    Order
    In-house Construction
    Period
    2006.05~2008.11
    Scale
    3 Buildings of 28 Floors and 2 Basements Gross Area: 48,723.6296㎡
    더보기

Yongin-Seoul Freeway PFI Project Section 6

The Business Performance details view. can you check Work Scope, Order, Period
· Location Godeung-dong ,Sujeong-gu ,Seongnam-si, Gyeonggi-do ~ Segok-dong ,Gangnam-gu, Seoul
· Order Kyungsoo Highway Corporation
· Period 2006.10~2009.06
· Scale - Earth Work: Cutting 809,721m³ Banking 524,266m³ Spoil 654,541m³ - Drainage Work: Drainage Pipeline 3,789m/136ea Conduit 332m/9ea Reinforced Earth Wall 5,119m² - Structure Work: Bridge 997m/10ea Steel Bridge Construction 4,567ton - Tunnel Work: Tunnel 5,626m/6ea - Pavement Work: Compound Aggregate 84,699m³ Ascon Pavement 58,222ton CONC Pavement 15,572m³

Utility Supply Facility Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Period 2006.09~2007.05
· Scale For SK Daeduck Institute of Tech. Promoter : SK E&C Daeduck Institute of Tech. Period : ’06.9~’07.5

Hyosung Extra High-Voltage Transformer Plant Construction in Namtong, China

The Business Performance details view. can you check Work Scope, Order, Period
· Location China
· Period 2006.09~2007.12
· Scale Total 40,175㎡ buildings for Extra High Voltage Transformer, Sheet Metal and Distribution Transformer. Winding Machines, Drying System, Crane (400t and others), Coating Line, Welding Line, Tester, etc. Promoter : Namtong Hyosung Transformer Corporation Period : 2006. 09. 29~2007. 12. 31

Jeju Utd FC Players Lodge Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gangjeong-dong, Seogwipo-si, Jeju-do
· Order SK Corporation
· Period 2006.08~2007.04
· Scale 1 Lodge(building) of 3 Floors and 1 Basement Gross Area: 4,569.19㎡

Yeoido S-Trenue

The Business Performance details view. can you check Work Scope, Order, Period
· Location 26-1, 26, Yeouido-dong, Youngdeungpo-gu, Seoul
· Order SK Networks
· Period 2006.08~2009.08
· Scale - 1 Building of 7 Basements and 36 Floors - Land Area : 2,931m2 - Building Area : 1,745.01m2 - Gross Area : 39,898.56m2 - No. of Unit: 118units - Pyung-type : 48~125

SK Institute of Tech. Lab D Block Expansion Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK R Center, 140-1, Wonchon-dong, Yuseong-gu, Daejeon
· Order SK Corporation
· Period 2006.08~2007.08
· Scale 1 Lab of 4 Floors and 1 Basement Gross Area: 7,322㎡

Goyang Haengsin SK VIEW Phase 3 APT Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 650-8, Haengsin-dong, Deogyang-gu, Goyang-si, Gyeonggi-do,
· Order Daemyung Construction Corporation
· Period 2006.07~2008.12
· Scale 7 APT Buildings of 25 Floors and 2 Basements Gross Area: 93,597.06㎡ (28,313.11PY)

Chungjungro SK VIEW Regional Housing Association

The Business Performance details view. can you check Work Scope, Order, Period
· Location 28-10, Hap-dong ,Seodaemun-gu, Seoul
· Period 2006.07~2008.08
· Scale 3 Buildings of 12~20 Floors and 2 Basements Gross Area: 29,092㎡

Dongback Apelbaum Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 954, Jung-dong, Giheung-gu, Yongin-si, Gyeonggi-do and 2 more locations
· Order Morning Bridge, INC.
· Period 2006.06~2008.11
· Scale 122 Buildings of 2 Floors and 1 Basement Gross Area: 26,000㎡

Metropolitan Integrated Logistics Center Construction Project

The Business Performance details view. can you check Work Scope, Order, Period
· Period 2006.06~2007.09
· Scale SK Networks 2006. 06. 01~2007. 09. 30 Integrated Center for IT, Fashion and Wine buildings 50879.48㎡, Storage Rack, Sorting System, Various Packaging Machine, DAS, Hanger System

Paju Woonjung Phase 1 Area Development Section 1 Site Preparation Work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yadang-ri, Gyoha-eub, Paju-si, Gyeonggi-do
· Order Korea National Housing Corporation
· Period 2006.06~2008.08
· Scale Complex Construction:1,706,000m2 Drainage Work:14.6km, Conduit :6.4km Pavement work :2,139a, Main Water Supply Line :16.3km

Dongrae SK VIEW Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 423-2, Oncheon-dong, Dongnae-gu, Busan, and 53 more locations
· Order In-house Construction
· Period 2006.05~2008.11
· Scale 3 Buildings of 28 Floors and 2 Basements Gross Area: 48,723.6296㎡