본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Pentaport Asan Baebang Complex Development

    Period
    2007.03~2011.12
    Scale
    Block 1 : 2 Basements and 41/45 Floors(153,559㎡), Residence, Neighborhood Unit Block 3: 5 Basements and 66 Floors(235,146㎡), Residence, Neighborhood Unit, Sales, etc. Block 4: 7 Basements and 51 Floors(94,565㎡), Business, Neighborhood Unit, Sales, etc. Block 8: 6 Basements and 8 Floors(81,761㎡), Sales (Department Store) Gross Area: 565,031㎡
    더보기

    Namsan SK LEADERS VIEW

    Order
    Markers Holdings Co.,Ltd.
    Period
    2007.01~2009.11
    Scale
    Land Area: 5,072.60㎡(1,534.46PY) Building Area: 2,687.71㎡(813.03PY) Gross Area: 79,294.23㎡(23,986.50PY)
    더보기

    Namsan SK LEADERS VIEW construction

    Period
    2007.01~2009.12
    Scale
    2x30 story buildings with 7 below ground floors, 233 units Total area: 79,233.67m2
    더보기
  • Incheon Chungna Area Economic Free Zone Development Project (Section 3)

    Order
    Korea Land Corporation, Incheon Branch
    Period
    2007.01~2010.10
    Scale
    Subsoil Improving Work: SANDMAT(245,285 ㎡), P.B.D(777,715 m) Earth Work (Net Banking) : 1,780,000㎥ Rainfall Work (Pipeline) : 24,551 m Sewage Work: 11,420 m Waterworks: 14,964 m Pavement Work: 1,844 a River Work: 9,895 ㎡
    더보기

    Grand Park SK VIEW APT Construction

    Period
    2007.01~2009.02
    Scale
    6 Buildings of 5/21 Floors and 2 Basements Gross Area: 87,712.3450㎡
    더보기

    Jurong Aromatics Complex Project

    Work Scope
    Paraxylene 800,000MTPY Orthoxylene 200,000MTPY Benzene 438,000MTPY Jet Fuel 710,000MTPY Diesel 600,0
    Order
    Jurong Aromatics Corp. (Singapore)
    Period
    2007~2010
    Scale
    Paraxylene 800,000MTPY Orthoxylene 200,000MTPY Benzene 438,000MTPY Jet Fuel 710,000MTPY Diesel 600,0
    더보기
  • RRC Upgrading Project

    Work Scope
    FRACTINATION 57,700 BPSD SWEETNENING 30,000 BPSD UT&OS Revamp
    Order
    RAYONG REFINERY PUBLIC CO., LTD. (RAYONG, THAILAND)
    Period
    2007~2008
    Scale
    FRACTINATION 57,700 BPSD SWEETNENING 30,000 BPSD UT&OS Revamp
    더보기

    Thai Polypropylene No.3 Project

    Work Scope
    PP 400,000 MTPY
    Order
    THAI POLYPROPYLENE (RAYONG, THAILAND)
    Period
    2007~2009
    Scale
    PP 400,000 MTPY

    Ulsan Industrial Water Road Facility Improvement (Phase 1) Project

    Order
    Public Procurement Service
    Period
    2006.11~2009.10
    Scale
    Aged Pipe Improvement 12ea, Total Expansion L=13,492m - Pipe Regeneration (D900mm) : L = 3,387m - Steel Pipe Connection and Attachment (D2,000mm) : L = 3,857m - Steel Pipe Connection and Attachment (D1,500mm) : L = 492m - Steel Pipe Connection and Attachment (D1,200mm) : L = 3,847m - Steel Pipe Connection and Attachment (D1,100mm) : L = 605m - Steel Pipe Connection and Attachment (D900mm) : L = 784m - KP Dock Tile Cast Iron Attachment (D700mm) : L = 520m
  • Suwon Gwonseon SK VIEW Reconstruction

    Period
    2006.11~2008.11
    Scale
    21 Buildings of 8~15 Floors and 1 Basement Gross Area: 170,361.53㎡
    더보기

    Hwaseong Byeongjeom SK VIEW Construction

    Order
    SK Networks Co., Ltd.
    Period
    2006.11~2008.09
    Scale
    6 Buildings of 12 Floors and 2 Basements Gross Area: 48200.32㎡
    더보기

    Jeonju Taepyeong SK VIEW Construction

    Order
    KT&G
    Period
    2006.10~2008.12
    Scale
    10 Buildings of 18 Floors and 2 Basements Gross Area: 187,427.12㎡
    더보기

Pentaport Asan Baebang Complex Development

The Business Performance details view. can you check Work Scope, Order, Period
· Location 1, 3, 4, 8 Comercial block, Housing development zone, Baebang-myeon, Asan-si, Chungcheongnam-do
· Period 2007.03~2011.12
· Scale Block 1 : 2 Basements and 41/45 Floors(153,559㎡), Residence, Neighborhood Unit Block 3: 5 Basements and 66 Floors(235,146㎡), Residence, Neighborhood Unit, Sales, etc. Block 4: 7 Basements and 51 Floors(94,565㎡), Business, Neighborhood Unit, Sales, etc. Block 8: 6 Basements and 8 Floors(81,761㎡), Sales (Department Store) Gross Area: 565,031㎡

Namsan SK LEADERS VIEW

The Business Performance details view. can you check Work Scope, Order, Period
· Location 31-1, Hoehyeon-dong, Jung-gu, Seoul
· Order Markers Holdings Co.,Ltd.
· Period 2007.01~2009.11
· Scale Land Area: 5,072.60㎡(1,534.46PY) Building Area: 2,687.71㎡(813.03PY) Gross Area: 79,294.23㎡(23,986.50PY)

Namsan SK LEADERS VIEW construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 31-1, Hoehyeon-dong-1-ga, Jung-gu, Seoul
· Period 2007.01~2009.12
· Scale 2x30 story buildings with 7 below ground floors, 233 units Total area: 79,233.67m2

Incheon Chungna Area Economic Free Zone Development Project (Section 3)

The Business Performance details view. can you check Work Scope, Order, Period
· Location (Cheongna) Gyeongseo-dong and Illwon-dong, Seo-gu, Incheon
· Order Korea Land Corporation, Incheon Branch
· Period 2007.01~2010.10
· Scale Subsoil Improving Work: SANDMAT(245,285 ㎡), P.B.D(777,715 m) Earth Work (Net Banking) : 1,780,000㎥ Rainfall Work (Pipeline) : 24,551 m Sewage Work: 11,420 m Waterworks: 14,964 m Pavement Work: 1,844 a River Work: 9,895 ㎡

Grand Park SK VIEW APT Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 272-1, Beomeo 4-dong ,Suseong-gu, Daegu
· Period 2007.01~2009.02
· Scale 6 Buildings of 5/21 Floors and 2 Basements Gross Area: 87,712.3450㎡

Jurong Aromatics Complex Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Singapore
· Work Scope Paraxylene 800,000MTPY Orthoxylene 200,000MTPY Benzene 438,000MTPY Jet Fuel 710,000MTPY Diesel 600,0
· Order Jurong Aromatics Corp. (Singapore)
· Period 2007~2010
· Scale Paraxylene 800,000MTPY Orthoxylene 200,000MTPY Benzene 438,000MTPY Jet Fuel 710,000MTPY Diesel 600,0

RRC Upgrading Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Thailand
· Work Scope FRACTINATION 57,700 BPSD SWEETNENING 30,000 BPSD UT&OS Revamp
· Order RAYONG REFINERY PUBLIC CO., LTD. (RAYONG, THAILAND)
· Period 2007~2008
· Scale FRACTINATION 57,700 BPSD SWEETNENING 30,000 BPSD UT&OS Revamp

Thai Polypropylene No.3 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 태국
· Work Scope PP 400,000 MTPY
· Order THAI POLYPROPYLENE (RAYONG, THAILAND)
· Period 2007~2009
· Scale PP 400,000 MTPY

Ulsan Industrial Water Road Facility Improvement (Phase 1) Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan
· Order Public Procurement Service
· Period 2006.11~2009.10
· Scale Aged Pipe Improvement 12ea, Total Expansion L=13,492m - Pipe Regeneration (D900mm) : L = 3,387m - Steel Pipe Connection and Attachment (D2,000mm) : L = 3,857m - Steel Pipe Connection and Attachment (D1,500mm) : L = 492m - Steel Pipe Connection and Attachment (D1,200mm) : L = 3,847m - Steel Pipe Connection and Attachment (D1,100mm) : L = 605m - Steel Pipe Connection and Attachment (D900mm) : L = 784m - KP Dock Tile Cast Iron Attachment (D700mm) : L = 520m

Suwon Gwonseon SK VIEW Reconstruction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 1035 Gwonseon-dong, Gwonseon-gu, Suwon-si, Gyeonggi-do and 7 locations more
· Period 2006.11~2008.11
· Scale 21 Buildings of 8~15 Floors and 1 Basement Gross Area: 170,361.53㎡

Hwaseong Byeongjeom SK VIEW Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 409, Byeongjeom-dong, Hwaseong-si, Gyeonggi-do and 11 more locations
· Order SK Networks Co., Ltd.
· Period 2006.11~2008.09
· Scale 6 Buildings of 12 Floors and 2 Basements Gross Area: 48200.32㎡

Jeonju Taepyeong SK VIEW Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 25 Taepyeong-dong 1-ga, Wansan-gu, Jeonju-si, Jeonbuk
· Order KT&G
· Period 2006.10~2008.12
· Scale 10 Buildings of 18 Floors and 2 Basements Gross Area: 187,427.12㎡