We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Anyang Gwangyang C-1block Apartment electric work (section 4)

    Period
    2010.01~2012.03
    Scale
    13 apartment buildings (10 & 20 floors), 2 floors below ground Total area: 145,983m2
    더보기

    Paengseong - Oseong road construction

    Order
    Busan Jinhae Free Economic Zone Authority
    Period
    2009.12~2016.12
    Scale
    [ Chapter opened L = 5.60km] (B = 27.00m 6 round trip by car) - Section Sat : 410,348㎥, - Sat. gender : 1,189,673㎥, net banking : 1,237,332㎥ - Cancer going : 1,156m / 25 points, - Drain : 1,608m / 33 points - Sogyoryang : 137m / 5 points, - Span bridge : 1,210m / 1 places (Pyeongtaek Bridge: 110 + 160 + 90 + 50 @ 6 cursed tower cable-stayed bridge girder + PF ) - Ball Packaging Others
    더보기

    Sosa- Seokdong, opening a road between Construction

    Order
    Busan Jinhae Free Economic Zone Authority
    Period
    2009.11~2018.03
    Scale
    - Earthwork : 278,520 M3 ( mowing ), 433,472M3 ( Building ) - Drain hole : 7 points / 440M ( culverts ball) - Tunnel Ball : 12,095M ( bi-directional)
    더보기
  • Yongma Privately Financed Construction Projects a tunnel.

    Order
    Yongma tunnel Corp.,
    Period
    2009.11~2014.11
    Scale
    - Extension L = 3.56km - 1 point tunnel (2.5km) - Three places Bridges
    더보기

    Samseon SK VIEW construction

    Period
    2009.11~2012.04
    Scale
    7 buildings, 430 units, 15 floors, 3 floors below ground Total area: 79,387.7m2
    더보기

    Ruwais Refinery Expansion Project Package-1

    Ruwais Refinery Expansion Project Package

    Order
    Abu Dhabi Oil Refining Company (TAKREER)
    Period
    2009.11~2016.05
    Scale
    Processing 417,000 Barrels of Murban Crude Oil per calendar day
    Perform Form
    EPCC LSTK (Engineering, Procurement, Construction, Commissioning)
    더보기
  • Construction of the roadbed for section 2-2 of the Honam High-Speed Railway

    Order
    Korea Rail Network Authority
    Period
    2009.11~2013.06
    Scale
    - Length 10.3km - 6 bridges (5.34㎞) - Earthwork: 8 locations (4.90㎞) - One tunnel (0.06㎞)
    더보기

    Gangnam N-Tower construction

    Period
    2009.10~2011.11
    Scale
    20 floors above ground, 6 floors below ground Total area: 45,307.44m2
    더보기

    Business facilities in Block C-3 of Pangyo Techno Valley

    Period
    2009.10~2013.03
    Scale
    4-5BL:4 floors below ground ~10 floors above ground 4-6BL: 4 floors below ground ~ 11 floors above ground 4-7BL: 4 floors below ground ~ 7F, 8F and 9F above ground Total area: 154,940m2
    더보기
  • Section 20 (T/K) of the Nakdong River Revival Project

    Order
    Korea Water Resources Corporation
    Period
    2009.10~2011.12
    Scale
    - Total length: 21.21Km - Movable weir: 138m (including piers) - Fixed weir: 184.5m - Fishway: One natural/Borland fishway - Kong-do Public bridge: 675m - Improvement of the river channel: dredge amount (18,940,000㎥) - 2 Bridge protection structures (Yulji bridge, Jeokpo bridge) - 4 riverbed maintenance structures (Hwang River, etc.) - Ecological stream: one - 11 water pumps and distribution system - Structures: 3 buildings including the integrated management bldg., etc. - Pump/storage power station: 2,500Kw×2
    더보기

    Section 7 (T/K) of the Geum River Revival Project

    Order
    Daejeon Regional Construction and Management Administration, Korea Water Resources Corporation
    Period
    2009.10~2011.12
    Scale
    - Length: 26.3km - Natural river improvement Improvement of the river channel (10.2 million ㎥) 18 interbed-storage protection structures 4 pier protection structures 52 drainage and sluice gates 4 water pumps and distribution system - Ecological stream - Multi-purpose movable weir (L=260M, H=7M) - pump/storage power station (1500KW×2기) - Structure (superintendent’s office)
    더보기

    Cheongla SK VIEW construction

    Period
    2009.07~2012.01
    Scale
    9 buildings, 30 floors plus rooftop decks, 2 floors below ground Total area: 194,938m2
    더보기

Anyang Gwangyang C-1block Apartment electric work (section 4)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Block C-1 inside the residential lot development complex at 381-1, Gwanyang-dong, Dongan-gu, Anyang, Gyeonggi Province
· Period 2010.01~2012.03
· Scale 13 apartment buildings (10 & 20 floors), 2 floors below ground Total area: 145,983m2

Paengseong - Oseong road construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dujeong-ri, Paengseong-eup, Pyeongtaek-si, Gyeonggi-do, Korea
· Order Busan Jinhae Free Economic Zone Authority
· Period 2009.12~2016.12
· Scale [ Chapter opened L = 5.60km] (B = 27.00m 6 round trip by car) - Section Sat : 410,348㎥, - Sat. gender : 1,189,673㎥, net banking : 1,237,332㎥ - Cancer going : 1,156m / 25 points, - Drain : 1,608m / 33 points - Sogyoryang : 137m / 5 points, - Span bridge : 1,210m / 1 places (Pyeongtaek Bridge: 110 + 160 + 90 + 50 @ 6 cursed tower cable-stayed bridge girder + PF ) - Ball Packaging Others

Sosa- Seokdong, opening a road between Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jinhae-gu, Changwon-si, Gyeongsangnam-do, Korea
· Order Busan Jinhae Free Economic Zone Authority
· Period 2009.11~2018.03
· Scale - Earthwork : 278,520 M3 ( mowing ), 433,472M3 ( Building ) - Drain hole : 7 points / 440M ( culverts ball) - Tunnel Ball : 12,095M ( bi-directional)

Yongma Privately Financed Construction Projects a tunnel.

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jungnang-gu, Seoul, Korea
· Order Yongma tunnel Corp.,
· Period 2009.11~2014.11
· Scale - Extension L = 3.56km - 1 point tunnel (2.5km) - Three places Bridges

Samseon SK VIEW construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 29, 3-ga, Samseon-dong, Seongbuk-gu, Seoul
· Period 2009.11~2012.04
· Scale 7 buildings, 430 units, 15 floors, 3 floors below ground Total area: 79,387.7m2

Ruwais Refinery Expansion Project Package-1

  • Ruwais Refinery Expansion Project Package
  • Ruwais Refinery Expansion Project Package
  • Ruwais Refinery Expansion Project Package
The Business Performance details view. can you check Work Scope, Order, Period
· Location Ruwais, United Arab Emirates
· Order Abu Dhabi Oil Refining Company (TAKREER)
· Period 2009.11~2016.05
· Scale Processing 417,000 Barrels of Murban Crude Oil per calendar day
· Perform Form EPCC LSTK (Engineering, Procurement, Construction, Commissioning)

Construction of the roadbed for section 2-2 of the Honam High-Speed Railway

The Business Performance details view. can you check Work Scope, Order, Period
· Location 358, Sindang-ri, Gwangseok-myeon, Nonsan, Southern Chungcheong-do
· Order Korea Rail Network Authority
· Period 2009.11~2013.06
· Scale - Length 10.3km - 6 bridges (5.34㎞) - Earthwork: 8 locations (4.90㎞) - One tunnel (0.06㎞)

Gangnam N-Tower construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location (135-820) 119, Honhyeon-2-dong, Gangnam-gu, Seoul
· Period 2009.10~2011.11
· Scale 20 floors above ground, 6 floors below ground Total area: 45,307.44m2

Business facilities in Block C-3 of Pangyo Techno Valley

The Business Performance details view. can you check Work Scope, Order, Period
· Location Blocks No. 4-5, 6 and 7 in the Pangyo residential lot development district, Sampyeong-dong, Bundang-gu, Seongnam, Gyeonggi-do
· Period 2009.10~2013.03
· Scale 4-5BL:4 floors below ground ~10 floors above ground 4-6BL: 4 floors below ground ~ 11 floors above ground 4-7BL: 4 floors below ground ~ 7F, 8F and 9F above ground Total area: 154,940m2

Section 20 (T/K) of the Nakdong River Revival Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 420, Hyeonchang-ri, Changnyeong-gun, Souther Gyeongsang-do
· Order Korea Water Resources Corporation
· Period 2009.10~2011.12
· Scale - Total length: 21.21Km - Movable weir: 138m (including piers) - Fixed weir: 184.5m - Fishway: One natural/Borland fishway - Kong-do Public bridge: 675m - Improvement of the river channel: dredge amount (18,940,000㎥) - 2 Bridge protection structures (Yulji bridge, Jeokpo bridge) - 4 riverbed maintenance structures (Hwang River, etc.) - Ecological stream: one - 11 water pumps and distribution system - Structures: 3 buildings including the integrated management bldg., etc. - Pump/storage power station: 2,500Kw×2

Section 7 (T/K) of the Geum River Revival Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 890, Cheongryong-ri, Euidang-myeon, Gongju, Southern Chungcheong-do
· Order Daejeon Regional Construction and Management Administration, Korea Water Resources Corporation
· Period 2009.10~2011.12
· Scale - Length: 26.3km - Natural river improvement Improvement of the river channel (10.2 million ㎥) 18 interbed-storage protection structures 4 pier protection structures 52 drainage and sluice gates 4 water pumps and distribution system - Ecological stream - Multi-purpose movable weir (L=260M, H=7M) - pump/storage power station (1500KW×2기) - Structure (superintendent’s office)

Cheongla SK VIEW construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Block A3, section 5, Cheongla district, Seo-gu, Incheon
· Period 2009.07~2012.01
· Scale 9 buildings, 30 floors plus rooftop decks, 2 floors below ground Total area: 194,938m2