We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Incheon Metropolitan Urban Railroad Line2

    Incheon Metropolitan Urban Railroad Line2

    Order
    Incheon Metropolitan City
    Period
    2009.06~2016.10
    Scale
    - Total Length 1.890km - Tunnel 1.630km - Station 2ea - Ventilation 6ea
    Perform Form
    Bidding
    더보기

    Construction of Section 1-1 of the Honam High-Speed Railroad

    Order
    Korea Rail Network Authority
    Period
    2009.05~2013.05
    Scale
    - Total length: 7.9Km - Earthwork: 3.2Km - Bridges: 3.5Km (6 locations) - Tunnel: 1.16Km (NATM)
    더보기

    Construction of the oil storage tank terminal in Mangalore, India

    Order
    ISPRL (Indian Strategic Petroleum Reserves Limited)
    Period
    2009.04~2012.04
    Scale
    - Underground oil storage tank terminal 1.5MMT (1,100 million barrels) - Cavern, Water Curtain Tunnel, Access Tunnel, Operation Shaft - Drilling (2,178,202㎥), reinforcement (rock bolt 2,620ton, shotcrete 342,215㎥, grouting 625MT)
    더보기
  • Construction of the roadbed for Section 1 of the Ulsan~Pohang Double Track Electrified Railroad

    Order
    Korea Rail Network Authority
    Period
    2009.04~2014.04
    Scale
    - Total length: 10.590km - Earthwork: 0.884km - Bridge: 4.009km (3 locations) - Tunnel: 3.891km (3 locations) - Station: 1.412km (2 locations) - Temporary line: 1.358km (2 locations)
    더보기

    Ulsan - Pohang double-track train the first tools new roadbed other construction

    Order
    Korea Rail Network Authority
    Period
    2009.04~2018.12
    Scale
    - Total length : 10.291km - Earthwork : 0.799km - Bridge : 4.111km (3 places) - Tunnel : 3.891km (3 places) - Station : 1.490km (2 places) - Temporary Line : 1.358km (2 places)
    더보기

    India, Mangalore Crude oil reserve base construction

    Order
    Indian Strategic Petroleum Reserves Limited
    Period
    2009.04~2015.10
    Scale
    1. crude oil storage 1.25MMT, saving Co- : 2.800km
    더보기
  • Singapore LNG Receiving Terminal FEED enhancement

    Work Scope
    Basic Design Competition
    Order
    Singapore LNG Terminal Pte. Ltd
    Period
    2009.04~2009.08
    Scale
    Basic Design Competition
    Perform Form
    FEED Competition

    Yeosu Coal Fired Power Plant, 2

    Order
    Korea South-East Power
    Period
    2009.03~2011.11
    Scale
    * Power Boiler : 1,085t/h - Manufacturer : Doosan - Type : Circulating Fluidized-Bed
    더보기

    The new KTX 10-3A tools roadbed other construction

    Order
    Korea Rail Network Authority
    Period
    2009.02~2016.02
    Scale
    - Extension : 10.942km - Bridge : 219m 3 places - Tunnel : 1,150m (NATM: 260m, excavation BOX: 620m, U-TYPE: 270m) - Bokgae section : 507m - Press Viaduct : 4 points - Gadogyo : 8 points ( one improvement , new 7) - Temporary Line : 15.3km
    더보기
  • Construction of the roadbed for Section 10-3A of the Gyeongbu High-Speed Railroad

    Order
    Korea Rail Network Authority
    Period
    2009.02~2014.08
    Scale
    - Total length: 10.942Km - Earthwork: 9.584Km - Bridge: 0.208Km (3 locations) - Tunnel: 1.150Km (NATM 260m, excavation 620m, Ramp 270m) - Ditch: One location - Multi-level crossing: 9 locations (one new, 8 improved) - Footbridge: 5 locations - Covered section: L=250m - Temporary line: 15.280Km
    더보기

    Construction of the electric power tunnel for supply of electric power to the Gangnam area (Nonil-Nonhyeon)

    Order
    KEPCO
    Period
    2008.12~2014.08
    Scale
    - Electric power tunnel L=3.344km - Increases power supply capacity to match increasing demand for electric power in Seocho-gu and Gangnam-gu, Seoul
    더보기

    Pyeongtaek US Military base site development and construction of public infrastructure

    Order
    USACE FED Purchasing Department
    Period
    2008.12~2003.11
    Scale
    Area 2,330,000 m2 Soft ground improvement area: 1,220,000m2, Earthwork (soil brought in: 4,500,000m3, waste soil: 600,000m3) Rainwater drainage work: 29,000m Sewage work: 22,100m Water supply work: 32,600m
    더보기

Incheon Metropolitan Urban Railroad Line2

  • Incheon Metropolitan Urban Railroad Line2
The Business Performance details view. can you check Work Scope, Order, Period
· Location Incheon Metropolitan City, Korea
· Order Incheon Metropolitan City
· Period 2009.06~2016.10
· Scale - Total Length 1.890km - Tunnel 1.630km - Station 2ea - Ventilation 6ea
· Perform Form Bidding

Construction of Section 1-1 of the Honam High-Speed Railroad

The Business Performance details view. can you check Work Scope, Order, Period
· Location 269-6, Darak-ri, Gangnae-myeon, Cheongwon-gun, Northern Chungcheong-do
· Order Korea Rail Network Authority
· Period 2009.05~2013.05
· Scale - Total length: 7.9Km - Earthwork: 3.2Km - Bridges: 3.5Km (6 locations) - Tunnel: 1.16Km (NATM)

Construction of the oil storage tank terminal in Mangalore, India

The Business Performance details view. can you check Work Scope, Order, Period
· Location Chandrahas Nagar, Permude, Bajpe, Mangalore
· Order ISPRL (Indian Strategic Petroleum Reserves Limited)
· Period 2009.04~2012.04
· Scale - Underground oil storage tank terminal 1.5MMT (1,100 million barrels) - Cavern, Water Curtain Tunnel, Access Tunnel, Operation Shaft - Drilling (2,178,202㎥), reinforcement (rock bolt 2,620ton, shotcrete 342,215㎥, grouting 625MT)

Construction of the roadbed for Section 1 of the Ulsan~Pohang Double Track Electrified Railroad

The Business Performance details view. can you check Work Scope, Order, Period
· Location 238-1, Songjeong-dong, Buk-gu, Ulsan
· Order Korea Rail Network Authority
· Period 2009.04~2014.04
· Scale - Total length: 10.590km - Earthwork: 0.884km - Bridge: 4.009km (3 locations) - Tunnel: 3.891km (3 locations) - Station: 1.412km (2 locations) - Temporary line: 1.358km (2 locations)

Ulsan - Pohang double-track train the first tools new roadbed other construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Myeongchon ~ Changpyeong-dong, Buk-gu, Ulsan. Korea
· Order Korea Rail Network Authority
· Period 2009.04~2018.12
· Scale - Total length : 10.291km - Earthwork : 0.799km - Bridge : 4.111km (3 places) - Tunnel : 3.891km (3 places) - Station : 1.490km (2 places) - Temporary Line : 1.358km (2 places)

India, Mangalore Crude oil reserve base construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Mangalore, Karnataka, India
· Order Indian Strategic Petroleum Reserves Limited
· Period 2009.04~2015.10
· Scale 1. crude oil storage 1.25MMT, saving Co- : 2.800km

Singapore LNG Receiving Terminal FEED enhancement

The Business Performance details view. can you check Work Scope, Order, Period
· Location Singapore
· Work Scope Basic Design Competition
· Order Singapore LNG Terminal Pte. Ltd
· Period 2009.04~2009.08
· Scale Basic Design Competition
· Perform Form FEED Competition

Yeosu Coal Fired Power Plant, 2

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yeosu, Korea
· Order Korea South-East Power
· Period 2009.03~2011.11
· Scale * Power Boiler : 1,085t/h - Manufacturer : Doosan - Type : Circulating Fluidized-Bed

The new KTX 10-3A tools roadbed other construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location The ground floor, Sincheon-dong, Dong-gu, Daegu, Korea
· Order Korea Rail Network Authority
· Period 2009.02~2016.02
· Scale - Extension : 10.942km - Bridge : 219m 3 places - Tunnel : 1,150m (NATM: 260m, excavation BOX: 620m, U-TYPE: 270m) - Bokgae section : 507m - Press Viaduct : 4 points - Gadogyo : 8 points ( one improvement , new 7) - Temporary Line : 15.3km

Construction of the roadbed for Section 10-3A of the Gyeongbu High-Speed Railroad

The Business Performance details view. can you check Work Scope, Order, Period
· Location 294-5, Sinam-4-dong, Dong-gu, Daegu
· Order Korea Rail Network Authority
· Period 2009.02~2014.08
· Scale - Total length: 10.942Km - Earthwork: 9.584Km - Bridge: 0.208Km (3 locations) - Tunnel: 1.150Km (NATM 260m, excavation 620m, Ramp 270m) - Ditch: One location - Multi-level crossing: 9 locations (one new, 8 improved) - Footbridge: 5 locations - Covered section: L=250m - Temporary line: 15.280Km

Construction of the electric power tunnel for supply of electric power to the Gangnam area (Nonil-Nonhyeon)

The Business Performance details view. can you check Work Scope, Order, Period
· Location 7th floor, Yoheyon Building, 242-29, Nonhyeon-2-dong, Gangnam-gu, Seoul
· Order KEPCO
· Period 2008.12~2014.08
· Scale - Electric power tunnel L=3.344km - Increases power supply capacity to match increasing demand for electric power in Seocho-gu and Gangnam-gu, Seoul

Pyeongtaek US Military base site development and construction of public infrastructure

The Business Performance details view. can you check Work Scope, Order, Period
· Location San-12, Dongchang-ri, Paengseong-eup, Pyeongtaek
· Order USACE FED Purchasing Department
· Period 2008.12~2003.11
· Scale Area 2,330,000 m2 Soft ground improvement area: 1,220,000m2, Earthwork (soil brought in: 4,500,000m3, waste soil: 600,000m3) Rainwater drainage work: 29,000m Sewage work: 22,100m Water supply work: 32,600m