본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Seongmun national industrial complex wastewater treatment plant construction work

    Order
    LH Corporation
    Period
    2012.06~2016.12
    Scale
    - Management equipment and copper, water treatment facilities - East Building Ground Floor 1,2 - Inflow pipe (D800mm, L = 79m) - Discharge pipe Athletics period D700mm, L = 666m : Maritime zone D700mm, L = 824m
    더보기

    Pangyo SK C&C IT Complex

    Period
    2012.06~2014.06
    Scale
    Land Area : 3,695 pyung, Gross Area : 20,254 pyung, Parking Capacity 525
    더보기

    Step 2 Aewol port development projects

    Order
    Jeju Special Self-Governing Province
    Period
    2012.03~2017.02
    Scale
    ○ outside facilities : 1,465m - Joan seobangpa 513m, par northern breakwater 602m, Northern breakwater 250m, east breakwater 100m) ○ berthing facilities : 270m Sand Pier 110m, 160m cement pier ○ Water facility ( one way routes and marina ) ○ connecting Joan ( the upright ): 60m ○ dredging and reclamation : 1 set ○ existing breakwater and the pier removed : 1 set ○ Other troops ball ○ city planning road : one way
    더보기
  • The Metropolitan Rail (Suseo~Pyeongtaek) Article 8 Other new tools roadbed construction

    Order
    Korea Rail Network Authority
    Period
    2012.01~2016.06
    Scale
    - Earthwork : 1,694m - U-Type: 486m - Excavation BOX: 100m - Excavation tunnel : 660m - NATM: 722m - Stereoscopic viaducts : one place
    더보기

    Turkey Istanbul Road Project (Turnkey EPC)

    Order
    DLH (General Directorate of Railways, Harbours, and Airports Construction under the Ministry of Transportation of Turkey)
    Period
    2012.01~2016.07
    Scale
    - Total length: 14.6km - Width extension section: 8.8km (6~8 lanes) - new section: 5.8km (4 lanes) (including TBM 3.340m)
    더보기

    Taean Thermal Power Unit 9,10 civil Phase 1 construction

    Work Scope
    PC
    Order
    Korea Western Power
    Period
    2012.01~2015.01
    Scale
    2,100MW(1,050 MW x 2)
    Perform Form
    Construction
  • Tongyeong production base vaporization of liquefied natural gas transmission facilities construction work

    Period
    2011.12~2013.12

    Daechi-dong SKN new company building construction

    Period
    2011.12~2014.01
    Scale
    5 floors below ground ~ 9 floors above ground Total area: 47,638.21m2
    더보기

    LiBS No.8/9 PROJECT

    Order
    SK Innovation
    Period
    2011.11~2013.12
    Scale
    Total floor area of ??24,214m2
    Perform Form
    EPC
    더보기
  • Opo-Pogok period (2nd) extended road paving work

    Order
    Construction Headquarters, Gyeonggi Province
    Period
    2011.11~2017.10
    Scale
    Road extension : 6.2Km, 4 car (B = 18.5m) - 2 points span bridge (720m) - Sogyoryang 11 points (453.5m) - Cloverleaf four places ( Pogok IC, Sinwon IC, Dongrim IC, Rngwon IC)
    더보기

    SK Corporate Pavilion, Expo 2012 Yeosu Korea

    Period
    2011.10~2012.04
    Scale
    34m x 43m (19.95m high) Total area: 2,211.71m2
    더보기

    SK Communications company building construction

    Period
    2011.09~2013.08
    Scale
    4 floors below ground ~ 10 floors above ground Total area: 49,789.27m2
    더보기

Seongmun national industrial complex wastewater treatment plant construction work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sambong-ri, Seongmun-myeon, Dangjin-gun, Chungcheongnam-do, Korea
· Order LH Corporation
· Period 2012.06~2016.12
· Scale - Management equipment and copper, water treatment facilities - East Building Ground Floor 1,2 - Inflow pipe (D800mm, L = 79m) - Discharge pipe Athletics period D700mm, L = 666m : Maritime zone D700mm, L = 824m

Pangyo SK C&C IT Complex

The Business Performance details view. can you check Work Scope, Order, Period
· Location 611, Sampyeong-dong, Bundang-gu, Seongnam-si, Gyeonggi-do, Korea
· Period 2012.06~2014.06
· Scale Land Area : 3,695 pyung, Gross Area : 20,254 pyung, Parking Capacity 525

Step 2 Aewol port development projects

The Business Performance details view. can you check Work Scope, Order, Period
· Location Aewol port, Aewol-eup, Jeju-si, Jeju Special Self-Governing Province, Korea
· Order Jeju Special Self-Governing Province
· Period 2012.03~2017.02
· Scale ○ outside facilities : 1,465m - Joan seobangpa 513m, par northern breakwater 602m, Northern breakwater 250m, east breakwater 100m) ○ berthing facilities : 270m Sand Pier 110m, 160m cement pier ○ Water facility ( one way routes and marina ) ○ connecting Joan ( the upright ): 60m ○ dredging and reclamation : 1 set ○ existing breakwater and the pier removed : 1 set ○ Other troops ball ○ city planning road : one way

The Metropolitan Rail (Suseo~Pyeongtaek) Article 8 Other new tools roadbed construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jije-dong, Pyeongtaek-si, Gyeonggi-do, Korea
· Order Korea Rail Network Authority
· Period 2012.01~2016.06
· Scale - Earthwork : 1,694m - U-Type: 486m - Excavation BOX: 100m - Excavation tunnel : 660m - NATM: 722m - Stereoscopic viaducts : one place

Turkey Istanbul Road Project (Turnkey EPC)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Kısıklı Cad. Tekin-Ak ?? Merkezi No:3 K:1 D:5 34662 Altunizade, Istanbul
· Order DLH (General Directorate of Railways, Harbours, and Airports Construction under the Ministry of Transportation of Turkey)
· Period 2012.01~2016.07
· Scale - Total length: 14.6km - Width extension section: 8.8km (6~8 lanes) - new section: 5.8km (4 lanes) (including TBM 3.340m)

Taean Thermal Power Unit 9,10 civil Phase 1 construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Taean-gun, Chungcheongnam-do, Korea
· Work Scope PC
· Order Korea Western Power
· Period 2012.01~2015.01
· Scale 2,100MW(1,050 MW x 2)
· Perform Form Construction

Tongyeong production base vaporization of liquefied natural gas transmission facilities construction work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Tongyeong-si, Gyeongsangnam-do, Korea
· Period 2011.12~2013.12

Daechi-dong SKN new company building construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 948, Daechi-dong, Gangnam-gu, Seoul
· Period 2011.12~2014.01
· Scale 5 floors below ground ~ 9 floors above ground Total area: 47,638.21m2

LiBS No.8/9 PROJECT

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jeungpyeong-gun, Chungcheongbuk-do, Korea
· Order SK Innovation
· Period 2011.11~2013.12
· Scale Total floor area of ??24,214m2
· Perform Form EPC

Opo-Pogok period (2nd) extended road paving work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Pogok-eup, Cheoin-gu, Yongin-si, Gyeonggi-do, Korea
· Order Construction Headquarters, Gyeonggi Province
· Period 2011.11~2017.10
· Scale Road extension : 6.2Km, 4 car (B = 18.5m) - 2 points span bridge (720m) - Sogyoryang 11 points (453.5m) - Cloverleaf four places ( Pogok IC, Sinwon IC, Dongrim IC, Rngwon IC)

SK Corporate Pavilion, Expo 2012 Yeosu Korea

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK Corporate Pavilion, Expo 2012 Yeosu Korea, 351-1, Deokchung-dong, Yeosu, Southern Jeolla-do
· Period 2011.10~2012.04
· Scale 34m x 43m (19.95m high) Total area: 2,211.71m2

SK Communications company building construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 623 & 623-1, Sampyeong-dong, Bundang-gu, Seongnam, Gyeonggi-do
· Period 2011.09~2013.08
· Scale 4 floors below ground ~ 10 floors above ground Total area: 49,789.27m2