We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Ethylamine Project

    Work Scope
    1,600 MTPY, 700 MTPY, 2,700 MTPY
    Order
    Korea Alcohol, (Korea)
    Period
    1997.07~1998.10
    Scale
    1,600 MTPY, 700 MTPY, 2,700 MTPY
    Perform Form
    EPC LSTK

    Gas Compression Station Project

    Order
    PETROBRAS(Petroleo Brasileiro S.A), BRAZIL
    Period
    1997.06~2000.12
    Scale
    Natural Gas 30 MMSCMD One Station in Bolivia, Two Station in Brazil

    Brazil RFCC Project

    Work Scope
    FCC(Revamping) 19,000BPSD, FCC(New) 19,000BPSD
    Order
    PetroBras (Sao Paolo, Brazil)
    Period
    1997.04~1999.09
    Scale
    FCC(Revamping) 19,000BPSD, FCC(New) 19,000BPSD
    더보기
  • Petrobras RFCC Project (Phase I & Phase II)

    Order
    PETROBRAS(Petroleo Brasileiro S.A), BRAZIL
    Period
    1997.04~2000.06
    Scale
    Licensor PETROBRAS(CENPES) Process Units Atmospheric Residue Catalytic Cracking Unit 19,000 BPSD Sour Water Treatment Unit Solvent Dearomatization Uni Solvents II Unit, Off-site and Utility System
    더보기

    Tank Farm Phase II Project

    Order
    Rayong Olefins Co., Ltd.,Thailand
    Period
    1997.01~1998.05
    Scale
    Naphtha Tank 570,000 bbl x 3 Units Gasoline Tank 190,000 bbl x 1 Unit Benzene Tank 32,000 bbl x 2 Units Toluene Tank 32,000 bbl x 1 Unit

    Cadereyta Refinery Project

    Order
    PEMEX (Cadereyta, Mexico)
    Period
    1997~2001
    Scale
    Naphtha HDS 25,000BPSD MTBE Plant No.2 80,000T/Y Alkylation Plant No.2 5,000BPSD Sulfur Recovery Plant No.4 Hydrogen Plant 60MMSCFD RFCC Plant 65,000BPSD Crude Distillation Plant No.1 Crude Distillation Plant No.2 Asphalt Mixing Unit 20,000BPSD
    더보기
  • Brazil RFCC Project

    Work Scope
    FCC(Revamping) 35,000BPSD
    Order
    Ecopetrol (Cartagena, Colombia)
    Period
    1997~1999
    Scale
    FCC(Revamping) 35,000BPSD
    더보기

    (N0.1, 2)Lube Base Oil Plant Project

    Work Scope
    Vacuum Distillation 15,000, 15,000 BARREL Catalytic Dewaxing 5,000, 7,000 BARREL
    Order
    SK Corporation (Ulsan, Korea)
    Period
    1997~2004
    Scale
    Vacuum Distillation 15,000, 15,000 BARREL Catalytic Dewaxing 5,000, 7,000 BARREL
    더보기

    Sulfur Recovery & Tail Gas Treatment Project

    Work Scope
    40 MTPD x2 Trains
    Order
    PEMEX Refinacion (Petroleos Mexicanos), Mexico
    Period
    1996.12~1998.06
    Scale
    Sulfur Recovery 40 MTPD x 2 Trains
    Perform Form
    EPC LSTK
  • Sulfur Recovery Project

    Work Scope
    40 MTPD x2 Trains
    Order
    PEMEX (Mexico)
    Period
    1996.12~1998.06
    Scale
    40 MTPD x2 Trains
    Perform Form
    EPC LSTK

    Pyungtak LPG Storage Facility Project

    Order
    SK Gas Co.
    Period
    1996.09~1999.03
    Scale
    Tank and Cavern Terminal Propane 300,000 m3(Cavern) Butane 35,000 m3 x 2 Units(DRT) Jetty 70,000 DWT with Loading and Unloading System Underground Pipeline 4 Km Refrigerating System Truck Loading System
    더보기

    Acid Gas Removal Plant

    Work Scope
    230 MMSCFD
    Order
    Kuwait National Petroleum Company, Kuwait
    Period
    1996.09~1999.03
    Scale
    Sour Gas 230 MMSCFD Associated Sour Condensate 44,000 BPSD Sulfur Recovery 275 TPD x 2 Trains
    Perform Form
    EPC LSTK
    더보기

Ethylamine Project

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope 1,600 MTPY, 700 MTPY, 2,700 MTPY
· Order Korea Alcohol, (Korea)
· Period 1997.07~1998.10
· Scale 1,600 MTPY, 700 MTPY, 2,700 MTPY
· Perform Form EPC LSTK

Gas Compression Station Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location BRAZIL-Penapolis / Sao paulo, Campo Grande / Mato Grosso, Yacuses / El Carmen
· Order PETROBRAS(Petroleo Brasileiro S.A), BRAZIL
· Period 1997.06~2000.12
· Scale Natural Gas 30 MMSCMD One Station in Bolivia, Two Station in Brazil

Brazil RFCC Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Brazil
· Work Scope FCC(Revamping) 19,000BPSD, FCC(New) 19,000BPSD
· Order PetroBras (Sao Paolo, Brazil)
· Period 1997.04~1999.09
· Scale FCC(Revamping) 19,000BPSD, FCC(New) 19,000BPSD

Petrobras RFCC Project (Phase I & Phase II)

The Business Performance details view. can you check Work Scope, Order, Period
· Location BRAZIL-Capuava Refinery, Maua, Sao Paolo
· Order PETROBRAS(Petroleo Brasileiro S.A), BRAZIL
· Period 1997.04~2000.06
· Scale Licensor PETROBRAS(CENPES) Process Units Atmospheric Residue Catalytic Cracking Unit 19,000 BPSD Sour Water Treatment Unit Solvent Dearomatization Uni Solvents II Unit, Off-site and Utility System

Tank Farm Phase II Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Map Ta Phut Industrial Estate, Rayong, Thailand
· Order Rayong Olefins Co., Ltd.,Thailand
· Period 1997.01~1998.05
· Scale Naphtha Tank 570,000 bbl x 3 Units Gasoline Tank 190,000 bbl x 1 Unit Benzene Tank 32,000 bbl x 2 Units Toluene Tank 32,000 bbl x 1 Unit

Cadereyta Refinery Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Mexico
· Order PEMEX (Cadereyta, Mexico)
· Period 1997~2001
· Scale Naphtha HDS 25,000BPSD MTBE Plant No.2 80,000T/Y Alkylation Plant No.2 5,000BPSD Sulfur Recovery Plant No.4 Hydrogen Plant 60MMSCFD RFCC Plant 65,000BPSD Crude Distillation Plant No.1 Crude Distillation Plant No.2 Asphalt Mixing Unit 20,000BPSD

Brazil RFCC Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Colombia
· Work Scope FCC(Revamping) 35,000BPSD
· Order Ecopetrol (Cartagena, Colombia)
· Period 1997~1999
· Scale FCC(Revamping) 35,000BPSD

(N0.1, 2)Lube Base Oil Plant Project

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope Vacuum Distillation 15,000, 15,000 BARREL Catalytic Dewaxing 5,000, 7,000 BARREL
· Order SK Corporation (Ulsan, Korea)
· Period 1997~2004
· Scale Vacuum Distillation 15,000, 15,000 BARREL Catalytic Dewaxing 5,000, 7,000 BARREL

Sulfur Recovery & Tail Gas Treatment Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Salina Cruz, Mexico
· Work Scope 40 MTPD x2 Trains
· Order PEMEX Refinacion (Petroleos Mexicanos), Mexico
· Period 1996.12~1998.06
· Scale Sulfur Recovery 40 MTPD x 2 Trains
· Perform Form EPC LSTK

Sulfur Recovery Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Mexico
· Work Scope 40 MTPD x2 Trains
· Order PEMEX (Mexico)
· Period 1996.12~1998.06
· Scale 40 MTPD x2 Trains
· Perform Form EPC LSTK

Pyungtak LPG Storage Facility Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Pyungtak-si, Gyeonggi
· Order SK Gas Co.
· Period 1996.09~1999.03
· Scale Tank and Cavern Terminal Propane 300,000 m3(Cavern) Butane 35,000 m3 x 2 Units(DRT) Jetty 70,000 DWT with Loading and Unloading System Underground Pipeline 4 Km Refrigerating System Truck Loading System

Acid Gas Removal Plant

The Business Performance details view. can you check Work Scope, Order, Period
· Location Mina Al-Admadi, Kuwait
· Work Scope 230 MMSCFD
· Order Kuwait National Petroleum Company, Kuwait
· Period 1996.09~1999.03
· Scale Sour Gas 230 MMSCFD Associated Sour Condensate 44,000 BPSD Sulfur Recovery 275 TPD x 2 Trains
· Perform Form EPC LSTK