BUSINESS Business Performance

  • Seoul Subway Section 904 Construction

    Order
    Seoul Metropolitan Government Office of Subway Construction
    Period
    2000.12~2007.12
    Scale
    Total Expansion L=1,950m Main Track 1,244.4m 2 Stations Ventillator 127.2m

    Yeosu Extra Reserve Base Project (00219D)

    Order
    Korea National Oil Corporation
    Period
    2000.11~2007.12
    Scale
    Storage Amount: 16,500,000 barrel Civil Engineering Work: Storage Cave (L=5,252m), Tunnel for Construction (L=4,048m) Pipe Tunnel (L=1,496m), GreenWall Tunnel (L=3,886M) Vertical Tunnel (L=266m), Other Tunnel (L=744m) Mechanical Work: Oil Pump and Exudation Water Pump Installation Work 1 set Electrical Work: Water Substation, Power, Lighting, Grounding, Communication Work 1 set Construction Work : Substation and Watchtower, Administration Center, Landscaping 1 set
    더보기

    Gugong-Doksan Power Cable Project

    Order
    KEPCO
    Period
    2000.02~2003.04
    Scale
    Tunnel L=3,080m SHIELD TBM 2,125m, NATM 955m, Vertical culvert 5 ea, Ventilator 5 ea Manhole 2ea, Leachate System 2ea
  • Jonghwa~Dunduck Detour Road Construction

    Order
    Yeosu City
    Period
    1999.12~2008.12
    Scale
    [Description of Major Construction Materials] Works: Road Expansion 7.76km (Width 20m - 4 Lanes) Cutting: 1,127,00㎥/Banking: 1,022,000㎥ Spoil: 450,000㎥/ Drainage Pipeline: 6,262m Bridge Work: 5ea/1,130m Tunnel Work: 1ea/1,374m Base Pavement: 1,036a, Surface Pavement: 1,309a
    더보기

    Pungdong~Yongdu Detour Road Construction

    Order
    Chungju City
    Period
    1999.12~2007.12
    Scale
    Cutting: 369,921M3 , Banking: 1,216,218M3 Tunnel: Up Line 420M , Down Line: 480M 9 Bridges (1,482M) 18 Conduits(527M) Drainage Pipe: 114ea (3,390M)
    더보기

    Gyungchun Line Double-track Railway Section 7 Construction

    Order
    Korea Rail Network Authrotiy Metropolitan Office
    Period
    1999.12~2007.11
    Scale
    Railway Expansion12.146km Bridge: 3,224m 5 bridges, Tunnel: 8,198m 4 Tunnels
  • Youngdong Line (Dongbeaksan-Dogye) Railroad Shifting Construction

    Order
    Korea Rail Network Authority Youngnam Region Office
    Period
    1999.12~2007.09
    Scale
    Expansion : 17.84Km Earth Work : 1.6Km Tunnel : 16.24Km 2 Inclined shafts, 2 Stations, 1 Vertical Culvert
    더보기

    New Harbor in Gunjang South Quay Wall Construction

    Order
    Maritime Affairs and Port Office
    Period
    1999.07~2003.07
    Scale
    Quay Wall Facility Total 1,350m, Reclamation 782,873m3
    더보기

    Namji-Youngsan Road Construction

    Order
    Busan Office
    Period
    1999.05~2005.12
    Scale
    L = 6.58KM Earth Work : Cutting 653,455M3 Banking 1,164,504M3 Net Banking 378,424M3 Bridge Work : 9ea L=1,944M Pavement Work : Surface 1,613a Base 1,250a Drainage work : Drainage pipe 33 ea/1,148M passage conduit : 9 ea/318M water channel conduit : 18 ea/874M Sideg gutter 19,742M
  • Sanchung-eub Wastewater Treatment Facility Construction

    Order
    Sanchung-gun office
    Period
    1999.04~2003.12
    Scale
    Wastewater Treatment Center (Oxidation Ditch) 2,800Ton/Day Intercepting Pipeline L=2.85km, Construction: Administration Boiling and 4 others Mechanical Work 1set Electrical work 1 set
    더보기

    Yongyun Wastewater Treatment Center Project Phase 2

    Order
    Ulsan
    Period
    1999.03~2002.03
    Scale
    Aeration tank , Deep Aeration Tank, Final Sedimentation Tank, Gravity Rectangular Dehydrator room, High-voltage BELT PRESS
    더보기

    Ansung-Yangsung Road Expansion and Pavement Work

    Order
    Gyeonggi-do
    Period
    1998.12~2004.12
    Scale
    Road Expansion L= 12.9 Km B=18.5 m Earth Work : Cutting 2,021,764㎥ Banking 2,939,062㎥ Structure Work: Bridge 865m 13ea, Gayu 1gado - Bridge 300m Hancehon Bridge 180m Pavement Work : Surface 3,106a Base 2,952a

Seoul Subway Section 904 Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Magok-dong~Gayang-dong, Gangseo-gu, Seoul
· Order Seoul Metropolitan Government Office of Subway Construction
· Period 2000.12~2007.12
· Scale Total Expansion L=1,950m Main Track 1,244.4m 2 Stations Ventillator 127.2m

Yeosu Extra Reserve Base Project (00219D)

The Business Performance details view. can you check Work Scope, Order, Period
· Location 1157, Nakpo-dong ,Yeosu-si, Jeollanam-do
· Order Korea National Oil Corporation
· Period 2000.11~2007.12
· Scale Storage Amount: 16,500,000 barrel Civil Engineering Work: Storage Cave (L=5,252m), Tunnel for Construction (L=4,048m) Pipe Tunnel (L=1,496m), GreenWall Tunnel (L=3,886M) Vertical Tunnel (L=266m), Other Tunnel (L=744m) Mechanical Work: Oil Pump and Exudation Water Pump Installation Work 1 set Electrical Work: Water Substation, Power, Lighting, Grounding, Communication Work 1 set Construction Work : Substation and Watchtower, Administration Center, Landscaping 1 set

Gugong-Doksan Power Cable Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gugong S/S, Gasan-dong~DoksanS/S, Doksan 1dong, Geumcheon-gu, Seoul
· Order KEPCO
· Period 2000.02~2003.04
· Scale Tunnel L=3,080m SHIELD TBM 2,125m, NATM 955m, Vertical culvert 5 ea, Ventilator 5 ea Manhole 2ea, Leachate System 2ea

Jonghwa~Dunduck Detour Road Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location (Jonghwa-dong ~ Dundeok-dong ,Yeosu-si, Jeollanam-do) - 186-10, Mipyeong-dong, Yeosu-si, Jeollanam-do
· Order Yeosu City
· Period 1999.12~2008.12
· Scale [Description of Major Construction Materials] Works: Road Expansion 7.76km (Width 20m - 4 Lanes) Cutting: 1,127,00㎥/Banking: 1,022,000㎥ Spoil: 450,000㎥/ Drainage Pipeline: 6,262m Bridge Work: 5ea/1,130m Tunnel Work: 1ea/1,374m Base Pavement: 1,036a, Surface Pavement: 1,309a

Pungdong~Yongdu Detour Road Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Pung-dong~Yongdu-dong, Chungju-si, Chungbuk
· Order Chungju City
· Period 1999.12~2007.12
· Scale Cutting: 369,921M3 , Banking: 1,216,218M3 Tunnel: Up Line 420M , Down Line: 480M 9 Bridges (1,482M) 18 Conduits(527M) Drainage Pipe: 114ea (3,390M)

Gyungchun Line Double-track Railway Section 7 Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Namsan-myeon~Shindong-myeon, Chuncheon-si, Gangwon
· Order Korea Rail Network Authrotiy Metropolitan Office
· Period 1999.12~2007.11
· Scale Railway Expansion12.146km Bridge: 3,224m 5 bridges, Tunnel: 8,198m 4 Tunnels

Youngdong Line (Dongbeaksan-Dogye) Railroad Shifting Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Beaksan-dong, Taebeak-si~Dogye-eub, Samchuck-si, Gangwon-do
· Order Korea Rail Network Authority Youngnam Region Office
· Period 1999.12~2007.09
· Scale Expansion : 17.84Km Earth Work : 1.6Km Tunnel : 16.24Km 2 Inclined shafts, 2 Stations, 1 Vertical Culvert

New Harbor in Gunjang South Quay Wall Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 1582-9, Soryong-dong, Gunsan-si, Junbuk
· Order Maritime Affairs and Port Office
· Period 1999.07~2003.07
· Scale Quay Wall Facility Total 1,350m, Reclamation 782,873m3

Namji-Youngsan Road Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Chungnyun-gun, Gyungnam
· Order Busan Office
· Period 1999.05~2005.12
· Scale L = 6.58KM Earth Work : Cutting 653,455M3 Banking 1,164,504M3 Net Banking 378,424M3 Bridge Work : 9ea L=1,944M Pavement Work : Surface 1,613a Base 1,250a Drainage work : Drainage pipe 33 ea/1,148M passage conduit : 9 ea/318M water channel conduit : 18 ea/874M Sideg gutter 19,742M

Sanchung-eub Wastewater Treatment Facility Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Oksan-ri, Sancheong-eub, Sancheong-gun, Gyungnam area
· Order Sanchung-gun office
· Period 1999.04~2003.12
· Scale Wastewater Treatment Center (Oxidation Ditch) 2,800Ton/Day Intercepting Pipeline L=2.85km, Construction: Administration Boiling and 4 others Mechanical Work 1set Electrical work 1 set

Yongyun Wastewater Treatment Center Project Phase 2

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yongyung-dong, Nam-gu, Ulsan
· Order Ulsan
· Period 1999.03~2002.03
· Scale Aeration tank , Deep Aeration Tank, Final Sedimentation Tank, Gravity Rectangular Dehydrator room, High-voltage BELT PRESS

Ansung-Yangsung Road Expansion and Pavement Work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Mosan-ri, Daeduk-myeon~Nansil-ri, Yangsung-myeon, Ansung-si, Gyeonggi
· Order Gyeonggi-do
· Period 1998.12~2004.12
· Scale Road Expansion L= 12.9 Km B=18.5 m Earth Work : Cutting 2,021,764㎥ Banking 2,939,062㎥ Structure Work: Bridge 865m 13ea, Gayu 1gado - Bridge 300m Hancehon Bridge 180m Pavement Work : Surface 3,106a Base 2,952a