  • Pyeongtaek PMO office construction

    Period
    2010.05~2012.04
    Scale
    1. 1st construction (cafeteria bldg.): 1F 2. 2nd construction (office bldg.): 1~2F Total area: 7,953m2
    더보기

    India, Padur Oil storage site construction

    Order
    Indian Strategic Petroleum Reserves Limited
    Period
    2010.05~2015.04
    Scale
    1. crude oil storage 1.5MMT, saving Co- : 3.572km
    더보기

    Yeoksam-dong Gaenari 5th reconstruction project

    Period
    2010.04~2012.11
    Scale
    3 buildings, 25 floors, 2 floors below ground Total area49,201m2
    더보기
  • Shin(new) Hanul Nuclear Power Plant

    Shin(new) Hanul Nuclear Power Plant

    Order
    Korea Hydro & Nuclear Power
    Period
    2010.04~2019.02
    Commercialization
    Unit1 : 2018.04.30 , Unit2 : 2019.02.28
    Scale
    Advance Power Reactor 1,400MW x 2 Block
    Perform Form
    C
    더보기

    Esmeraldas Refinery Phase II Project

    Order
    EPP
    Period
    2010.03~2013.03
    Perform Form
    EPC

    Construction of the counter facilities (phase 2-1) of the Pohang Yeongil Bay Port

    Order
    Pohang Regional Maritime Affairs & Port Office
    Period
    2010.03~2012.11
    Scale
    - Counter facilities: 1,026m (including connectors of 25.64m) - Reinforcement of the existing north breakwater 50m (reinforcement of the front wave dissipation block and superstructure) - Other appurtenant work: Aids to Navigation
  • Extension of the Walkerhill parking building

    Period
    2010.03~2011.11
    Scale
    5 floors above ground, 3 floors below ground, total area: 27,188.66m2
    더보기

    Oseong Combined Cycle Power Plant

    Order
    Pyeongtaek Energy & Service
    Period
    2010.03~2013.01
    Scale
    * GTG : 180 MW x 3 Units (GE) * STG : 293 MW x 1 Unit (GE) * HRSG : 3 Units
    더보기

    Construction of Section 918 of Phase-III of Seoul Subway Line 9

    Order
    Seoul Metropolitan Infrastructure Headquarters
    Period
    2010.02~2016.02
    Scale
    - Subway length L=1.29㎞ - 1 station - 3 ventilation openings
    더보기
  • Phase 3 to build 918 Seoul Subway Line 9 Corporation

    Order
    The Seoul Metropolitan Office of Urban Infrastructure Division
    Period
    2010.02~2017.02
    Scale
    - Metro extension L = 1.29㎞ - 3 points excavation zone - Stops in one place - Vent 3 points - 2 points tunnel
    더보기

    Kuwait pressurized gas equipment (BS132) Installation

    Order
    KOC
    Period
    2010.01~2015.04
    Perform Form
    EPC

    Construction of the National Naju Museum

    Period
    2010.01~2013.01
    Scale
    Single-story bldg. with 2 floors below ground Total area: 11,086.34m2
    더보기

Pyeongtaek PMO office construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Near USAG-Humphreys at 43, Dongchang-ri, Paengseong-eup, Pyeongtaek, Gyeonggi-do
· Period 2010.05~2012.04
· Scale 1. 1st construction (cafeteria bldg.): 1F 2. 2nd construction (office bldg.): 1~2F Total area: 7,953m2

India, Padur Oil storage site construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Padur, Karnataka India
· Order Indian Strategic Petroleum Reserves Limited
· Period 2010.05~2015.04
· Scale 1. crude oil storage 1.5MMT, saving Co- : 3.572km

Yeoksam-dong Gaenari 5th reconstruction project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 135-080, Yeoksam-dong, Gangnam-gu, Seoul
· Period 2010.04~2012.11
· Scale 3 buildings, 25 floors, 2 floors below ground Total area49,201m2

Shin(new) Hanul Nuclear Power Plant

  • Shin(new) Hanul Nuclear Power Plant
The Business Performance details view. can you check Work Scope, Order, Period
· Location Uljin, Korea
· Order Korea Hydro & Nuclear Power
· Period 2010.04~2019.02
· Commercialization Unit1 : 2018.04.30 , Unit2 : 2019.02.28
· Scale Advance Power Reactor 1,400MW x 2 Block
· Perform Form C

Esmeraldas Refinery Phase II Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ecuador
· Order EPP
· Period 2010.03~2013.03
· Perform Form EPC

Construction of the counter facilities (phase 2-1) of the Pohang Yeongil Bay Port

The Business Performance details view. can you check Work Scope, Order, Period
· Location (791-948) 14-3, Yonghan-ri, Heunghae-eup, Buk-gu, Pohang, Northern Gyeongsang-do
· Order Pohang Regional Maritime Affairs & Port Office
· Period 2010.03~2012.11
· Scale - Counter facilities: 1,026m (including connectors of 25.64m) - Reinforcement of the existing north breakwater 50m (reinforcement of the front wave dissipation block and superstructure) - Other appurtenant work: Aids to Navigation

Extension of the Walkerhill parking building

The Business Performance details view. can you check Work Scope, Order, Period
· Location 22-1, Gwangjang-dong, Gwangjin-gu, Seoul and 173 lots
· Period 2010.03~2011.11
· Scale 5 floors above ground, 3 floors below ground, total area: 27,188.66m2

Oseong Combined Cycle Power Plant

The Business Performance details view. can you check Work Scope, Order, Period
· Location Pyeongtaek, Korea
· Order Pyeongtaek Energy & Service
· Period 2010.03~2013.01
· Scale * GTG : 180 MW x 3 Units (GE) * STG : 293 MW x 1 Unit (GE) * HRSG : 3 Units

Construction of Section 918 of Phase-III of Seoul Subway Line 9

The Business Performance details view. can you check Work Scope, Order, Period
· Location Seongji Bldg., 193-9, Jamsil-dong, Songpa-gu, Seoul
· Order Seoul Metropolitan Infrastructure Headquarters
· Period 2010.02~2016.02
· Scale - Subway length L=1.29㎞ - 1 station - 3 ventilation openings

Phase 3 to build 918 Seoul Subway Line 9 Corporation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Samjeon-dong (District) at Jamsil hospital ~ 86, Jamsil-dong, Songpa-gu, Seoul, Korea ~
· Order The Seoul Metropolitan Office of Urban Infrastructure Division
· Period 2010.02~2017.02
· Scale - Metro extension L = 1.29㎞ - 3 points excavation zone - Stops in one place - Vent 3 points - 2 points tunnel

Kuwait pressurized gas equipment (BS132) Installation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Kuwait
· Order KOC
· Period 2010.01~2015.04
· Perform Form EPC

Construction of the National Naju Museum

The Business Performance details view. can you check Work Scope, Order, Period
· Location (520-922) Sinchon-ri, Bannam-myeon, Naju, Southern Jeolla-do
· Period 2010.01~2013.01
· Scale Single-story bldg. with 2 floors below ground Total area: 11,086.34m2