  • Cheongju Dormitory Construction

    Period
    2012.11~2014.04
    Scale
    Construction area : 609 pyung, Gross Area : 11,445 pyung
    더보기

    Siheung baegot SK VIEW

    Period
    2012.11~2015.07
    Scale
    1floors below ground, 25-29floors above ground 1,442 units in 17 buildings

    Singapore, Cable Tunnel EW2 Project

    Order
    SP POWER ASSETS
    Period
    2012.10~2016.12
    Scale
    1. The total length : 6.8km (Slurry TBM: 3 units) 2. Shafts: 4 points (Permanent 3 points , Temporary 1 point) 3. Utility Buildings: 3 points
    더보기
  • Janglim - Jinhae main pipe construction

    Order
    Korea Gas Corporation
    Period
    2012.10~2016.03
    Scale
    Buried main pipe : 30"" ""× 16.96km - Supply Bureau : 2 new locations ( Chinhae G / S, the signal B / V) - Proven testing, installation and operation yard
    더보기

    Dangshan SK V1 Center

    Period
    2012.10~2015.02
    Scale
    Land Area : 4,768 pyung, Gross Area : 30,238 pyung
    더보기

    KES Project

    Order
    KOC
    Period
    2012.10~2017.12
    Perform Form
    EPC
  • Singapore, Cable Tunnel NS2 Project

    Order
    SP Power ASSETS
    Period
    2012.10~2018/05
    Scale
    1. totla length : 5.38 km (Slurry TBM : 2대) 2. Shaft 3 points (Permanent 3개소) 3. 3 Buildings (2 Ventilations + 1Equipment)
    더보기

    Pangyo SK ECO HUB Construction

    Period
    2012.09~2014.11
    Scale
    Land Area : 18,594 pyung, Gross Area : 14,403 pyung, Business facilities
    더보기

    SK C&C Pangyo office

    Period
    2012.08~2014.02
    Scale
    Land Area : 3,695 pyung, Gross Area : 20,254 pyung, Parking Capacity 525
    더보기
  • SK HUB Pangyo Station Construction of office building

    Period
    2012.07~2014.10
    Scale
    Land Area : 3,299 pyung, Gross Area : 28,628 pyung

    Geoje - Masan construction Route 3

    Order
    Busan Regional Construction Management Administration
    Period
    2012.07~2020.06
    Scale
    - Extension 6.4km (B = 20.0m, round 4 lanes ) - Cut 1.25 million ㎥ - Fill 890 000 ㎥ - Sato 710 000 ㎥ - Culvert nine places (462m) - Bridge 11 points (1.88km) - 5 points tunnel (1.91km) - Packaging gongoe
    더보기

    Seongmun national industrial complex wastewater treatment plant construction work

    Order
    LH Corporation
    Period
    2012.06~2016.12
    Scale
    - Management equipment and copper, water treatment facilities - East Building Ground Floor 1,2 - Inflow pipe (D800mm, L = 79m) - Discharge pipe Athletics period D700mm, L = 666m : Maritime zone D700mm, L = 824m
    더보기

Cheongju Dormitory Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 125, Hyangjeong-dong, Heungdeok-gu, Cheongju-si, Chungcheongbuk-do, Korea
· Period 2012.11~2014.04
· Scale Construction area : 609 pyung, Gross Area : 11,445 pyung

Siheung baegot SK VIEW

The Business Performance details view. can you check Work Scope, Order, Period
· Location 1772-1, Jeongwang-dong, Siheung-si, Gyeonggi-do, Korea
· Period 2012.11~2015.07
· Scale 1floors below ground, 25-29floors above ground 1,442 units in 17 buildings

Singapore, Cable Tunnel EW2 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 5 May Road, Singapore 328593
· Order SP POWER ASSETS
· Period 2012.10~2016.12
· Scale 1. The total length : 6.8km (Slurry TBM: 3 units) 2. Shafts: 4 points (Permanent 3 points , Temporary 1 point) 3. Utility Buildings: 3 points

Janglim - Jinhae main pipe construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Songjeong-dong, Gangseo-gu, Busan, Korea
· Order Korea Gas Corporation
· Period 2012.10~2016.03
· Scale Buried main pipe : 30"" ""× 16.96km - Supply Bureau : 2 new locations ( Chinhae G / S, the signal B / V) - Proven testing, installation and operation yard

Dangshan SK V1 Center

The Business Performance details view. can you check Work Scope, Order, Period
· Location 80, Dangsan-dong 4(sa)-ga, Yeongdeungpo-gu, Seoul, Korea
· Period 2012.10~2015.02
· Scale Land Area : 4,768 pyung, Gross Area : 30,238 pyung

KES Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Kuwait
· Order KOC
· Period 2012.10~2017.12
· Perform Form EPC

Singapore, Cable Tunnel NS2 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 15a Ang Mo Kio Avenue 1 singapore
· Order SP Power ASSETS
· Period 2012.10~2018/05
· Scale 1. totla length : 5.38 km (Slurry TBM : 2대) 2. Shaft 3 points (Permanent 3개소) 3. 3 Buildings (2 Ventilations + 1Equipment)

Pangyo SK ECO HUB Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 687, Sampyeong-dong, Bundang-gu, Seongnam-si, Gyeonggi-do, Korea
· Period 2012.09~2014.11
· Scale Land Area : 18,594 pyung, Gross Area : 14,403 pyung, Business facilities

SK C&C Pangyo office

The Business Performance details view. can you check Work Scope, Order, Period
· Location 613, Sampyeong-dong, Bundang-gu, Seongnam-si, Gyeonggi-do, Korea
· Period 2012.08~2014.02
· Scale Land Area : 3,695 pyung, Gross Area : 20,254 pyung, Parking Capacity 525

SK HUB Pangyo Station Construction of office building

The Business Performance details view. can you check Work Scope, Order, Period
· Location 529, Baekhyeon-dong, Bundang-gu, Seongnam-si, Gyeonggi-do, Korea
· Period 2012.07~2014.10
· Scale Land Area : 3,299 pyung, Gross Area : 28,628 pyung

Geoje - Masan construction Route 3

The Business Performance details view. can you check Work Scope, Order, Period
· Location Naepo-ri, Gusan-myeon ~ Hyeondong, Masanhappo-gu, Changwon-si, Gyeongsangnam-do, Korea.
· Order Busan Regional Construction Management Administration
· Period 2012.07~2020.06
· Scale - Extension 6.4km (B = 20.0m, round 4 lanes ) - Cut 1.25 million ㎥ - Fill 890 000 ㎥ - Sato 710 000 ㎥ - Culvert nine places (462m) - Bridge 11 points (1.88km) - 5 points tunnel (1.91km) - Packaging gongoe

Seongmun national industrial complex wastewater treatment plant construction work

The Business Performance details view. can you check Work Scope, Order, Period
· Location Sambong-ri, Seongmun-myeon, Dangjin-gun, Chungcheongnam-do, Korea
· Order LH Corporation
· Period 2012.06~2016.12
· Scale - Management equipment and copper, water treatment facilities - East Building Ground Floor 1,2 - Inflow pipe (D800mm, L = 79m) - Discharge pipe Athletics period D700mm, L = 666m : Maritime zone D700mm, L = 824m