본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Ghana RFCC Project

    Order
    TEMA Oil Refinery Ltd (TEMA, Ghana)
    Period
    1998~2002
    Scale
    Sweetening 11,200BPSD Sulfur Recovery 4Ton/h Sour Water Treatment 11Ton/h Pipeline 7Km
    더보기

    RFCC Revamping Project

    Work Scope
    35,000 BPSD
    Order
    Ecopetrol(Empresa Colombiana de petroleos), Colombia
    Period
    1997.12~1999.09
    Scale
    Revamping of 29,000 BPSD to 35,000 BPSD Gas Compression and absorption section Reactor and regeneration/fractionation section Licensor UOP Consultant Interventoria
    Perform Form
    EPC LSTK
    더보기

    RFCC Revamping Project

    Work Scope
    35,000 BPSD
    Order
    Ecopetrol(Empresa Colombiana de petroleos), Colombia
    Period
    1997.12~1999.09
    Scale
    Revamping of 29,000 BPSD to 35,000 BPSD Gas Compression and absorption section Reactor and regeneration/fractionation section Licensor UOP Consultant Interventoria
    Perform Form
    EPC LSTK
  • RFCC Revamping Project

    Work Scope
    19,000 BPSD
    Order
    Ecopetrol(Empresa Colombiana de petroleos), Colombia
    Period
    1997.12~1999.09
    Scale
    Revamping of 29,000 BPSD to 35,000 BPSD Gas Compression and absorption section Reactor and regeneration/fractionation section Licensor UOP Consultant Interventoria
    Perform Form
    EPC LSTK
    더보기

    T-6 Reserve Base Construction

    Order
    Korea National Oil Corporation
    Period
    1997.12~1999.11
    Scale
    Reserved amount 1.1m BBL Light Oil 300,000 BBL 3 ea Korsone 100,000 BBL 2 ea and other related works
    더보기

    Long Distance Pipeline for Cadereyta Refinery Complex

    Order
    Cadereyta, (Mexico)
    Period
    1997.11~2000.06
    Scale
    Capacity : - Crude Oil 24"" Dia x 1,022 km, - Product 12"" Dia x 473 km
    Perform Form
    LSTK
  • Long Distance Pipeline Project for Cadereyta Refinery

    Order
    PEMEX Refinacion(Petroleos Mexicanos),Mexico
    Period
    1997.11~2001.04
    Scale
    Crude Oil Pipeline 1,022 Km
    Perform Form
    LSTK
    더보기

    Cadereyta Refinery Reconfiguration Project

    Order
    PEMEX Refinacion(Petroleos Mexicanos), Mexico
    Period
    1997.11~2001.04
    Scale
    * New Plants - Hydrotreating Plant for Coker Gas Oils (40,000 BPSD) - MTBE Plant No.2 (2,000 BPSD) - Hydrogen Plant (60MMSCFD) - Alkylation Plant No.2 with Load Preparer (5,000 BPSD) - Sulfur Recovery Plant No.4 (480 MTD) - Naphtha Reformer Plant No. with CCR (26,000 BPSD) - Naphtha Hydrodesulfurization Plant No.2 (25,000 BPSD) - Hydrodesulfurization of Intermediate Distilled Products - Plant No.3 (35,000 BPSD) - Sour Water Stripping Plant No.7 and No.8 (20,316 BPSD) - Sour Water Exhaust System No.4 (10,000 BPSD) * Upgrade & Modernization - Expansion and Upgrade Catalytic Plant No.1   - Expansion and Upgrade of the Combined Plant No.1   - Expansion and Upgrade of the Combined Plant No.2   - Expansion and Upgrade of the Lights Fractionation Plant - Upgrade of Naphtha Hydrodesulfurization Plant No.1   - Naphtha Reformer Plant No.1   - Upgrade of Hydrodesulfurization of Intermediate Distilled Products Plant No.1 - Upgrade of Hydrodesulfurization of Intermediate Distilled Products Plant No.2 - Upgrade of The Sulfur Recuperator Plant No.1 including Oil Gas Treatment Section - Integral Information System of The Refinery (Study & Equipment) - Expansion of Central laboratory and Instrument Calibration Laboratory   * Tankage & integration
    Perform Form
    EPC LSTK+ Financing
    더보기

    Mercury Removal Unit Improvement Project

    Order
    The Aromatics(Thailand) Public Co., Ltd.
    Period
    1997.10~1998.03
    Scale
    Installation of Heat Exchanger and Guard Pot
  • PO/SM 175% Expansion Project

    Work Scope
    50,000 MTPY
    Order
    SK Oxi-Chemical (Korea)
    Period
    1997.10~1998.09
    Scale
    50,000 MTPY
    Perform Form
    ED

    TDI Project

    Work Scope
    128 MTPD, 82 MTPD, 102 MTPD
    Order
    KFC, (Korea)
    Period
    1997.09~1999.12
    Scale
    128 MTPD, 82 MTPD, 102 MTPD
    Perform Form
    EPC LSTK

    Bunker-C Pipeline Project for Ulsan Petrochemical Complex

    Work Scope
    Capacity : - 8" Dia x 6.5 km, - 2" Dia x 350 m
    Order
    Yukong, Ltd, (Korea)
    Period
    1997.09~1998.02
    Scale
    Capacity : - 8" Dia x 6.5 km, - 2" Dia x 350 m
    Perform Form
    ED,PR,CN

Ghana RFCC Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ghana
· Order TEMA Oil Refinery Ltd (TEMA, Ghana)
· Period 1998~2002
· Scale Sweetening 11,200BPSD Sulfur Recovery 4Ton/h Sour Water Treatment 11Ton/h Pipeline 7Km

RFCC Revamping Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Cartagena, Colombia
· Work Scope 35,000 BPSD
· Order Ecopetrol(Empresa Colombiana de petroleos), Colombia
· Period 1997.12~1999.09
· Scale Revamping of 29,000 BPSD to 35,000 BPSD Gas Compression and absorption section Reactor and regeneration/fractionation section Licensor UOP Consultant Interventoria
· Perform Form EPC LSTK

RFCC Revamping Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Cartagena, Colombia
· Work Scope 35,000 BPSD
· Order Ecopetrol(Empresa Colombiana de petroleos), Colombia
· Period 1997.12~1999.09
· Scale Revamping of 29,000 BPSD to 35,000 BPSD Gas Compression and absorption section Reactor and regeneration/fractionation section Licensor UOP Consultant Interventoria
· Perform Form EPC LSTK

RFCC Revamping Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Cartagena, Colombia
· Work Scope 19,000 BPSD
· Order Ecopetrol(Empresa Colombiana de petroleos), Colombia
· Period 1997.12~1999.09
· Scale Revamping of 29,000 BPSD to 35,000 BPSD Gas Compression and absorption section Reactor and regeneration/fractionation section Licensor UOP Consultant Interventoria
· Perform Form EPC LSTK

T-6 Reserve Base Construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Donghea-si, Gangwon
· Order Korea National Oil Corporation
· Period 1997.12~1999.11
· Scale Reserved amount 1.1m BBL Light Oil 300,000 BBL 3 ea Korsone 100,000 BBL 2 ea and other related works

Long Distance Pipeline for Cadereyta Refinery Complex

The Business Performance details view. can you check Work Scope, Order, Period
· Order Cadereyta, (Mexico)
· Period 1997.11~2000.06
· Scale Capacity : - Crude Oil 24"" Dia x 1,022 km, - Product 12"" Dia x 473 km
· Perform Form LSTK

Long Distance Pipeline Project for Cadereyta Refinery

The Business Performance details view. can you check Work Scope, Order, Period
· Location Mexico-Cadereyta, Nuevo Leon
· Order PEMEX Refinacion(Petroleos Mexicanos),Mexico
· Period 1997.11~2001.04
· Scale Crude Oil Pipeline 1,022 Km
· Perform Form LSTK

Cadereyta Refinery Reconfiguration Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Cadereyta, Mexico
· Order PEMEX Refinacion(Petroleos Mexicanos), Mexico
· Period 1997.11~2001.04
· Scale * New Plants - Hydrotreating Plant for Coker Gas Oils (40,000 BPSD) - MTBE Plant No.2 (2,000 BPSD) - Hydrogen Plant (60MMSCFD) - Alkylation Plant No.2 with Load Preparer (5,000 BPSD) - Sulfur Recovery Plant No.4 (480 MTD) - Naphtha Reformer Plant No. with CCR (26,000 BPSD) - Naphtha Hydrodesulfurization Plant No.2 (25,000 BPSD) - Hydrodesulfurization of Intermediate Distilled Products - Plant No.3 (35,000 BPSD) - Sour Water Stripping Plant No.7 and No.8 (20,316 BPSD) - Sour Water Exhaust System No.4 (10,000 BPSD) * Upgrade & Modernization - Expansion and Upgrade Catalytic Plant No.1   - Expansion and Upgrade of the Combined Plant No.1   - Expansion and Upgrade of the Combined Plant No.2   - Expansion and Upgrade of the Lights Fractionation Plant - Upgrade of Naphtha Hydrodesulfurization Plant No.1   - Naphtha Reformer Plant No.1   - Upgrade of Hydrodesulfurization of Intermediate Distilled Products Plant No.1 - Upgrade of Hydrodesulfurization of Intermediate Distilled Products Plant No.2 - Upgrade of The Sulfur Recuperator Plant No.1 including Oil Gas Treatment Section - Integral Information System of The Refinery (Study & Equipment) - Expansion of Central laboratory and Instrument Calibration Laboratory   * Tankage & integration
· Perform Form EPC LSTK+ Financing

Mercury Removal Unit Improvement Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Map Ta Phut Industrial Estate, Rayong, Thailand
· Order The Aromatics(Thailand) Public Co., Ltd.
· Period 1997.10~1998.03
· Scale Installation of Heat Exchanger and Guard Pot

PO/SM 175% Expansion Project

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope 50,000 MTPY
· Order SK Oxi-Chemical (Korea)
· Period 1997.10~1998.09
· Scale 50,000 MTPY
· Perform Form ED

TDI Project

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope 128 MTPD, 82 MTPD, 102 MTPD
· Order KFC, (Korea)
· Period 1997.09~1999.12
· Scale 128 MTPD, 82 MTPD, 102 MTPD
· Perform Form EPC LSTK

Bunker-C Pipeline Project for Ulsan Petrochemical Complex

The Business Performance details view. can you check Work Scope, Order, Period
· Work Scope Capacity : - 8" Dia x 6.5 km, - 2" Dia x 350 m
· Order Yukong, Ltd, (Korea)
· Period 1997.09~1998.02
· Scale Capacity : - 8" Dia x 6.5 km, - 2" Dia x 350 m
· Perform Form ED,PR,CN