  • Daegu Line East Daegu and Youngchun roadbed double-track first tool, a Corporation

    Order
    Korea Rail Network Authority
    Period
    2011.02~2016.12
    Scale
    [ Total length : 9.45km] - Earthwork : 2.68km - Bridge : 4.51km (5 places) - Station : 2.26km (2 places) - Temporary Line : 0.66km (1 point)
    더보기

    Wasit Gas EPC (On-going)

    Work Scope
    Turn-key
    Order
    ARAMCO
    Period
    2011.02~2014.03
    Perform Form
    EPC LSTK

    Wasit #1,3,4 Project

    Order
    ARAMCO
    Period
    2011.02~2015.12
    Perform Form
    EPC
  • Pangyo Sanun Apelbaum construction

    Period
    2011.01~2012.07
    Scale
    1 floor below ground, 2 floors above ground, 34 block-type free-standing houses + 1 common facility buildings Maximum height 10.4M Total area: 17,861.4m2
    더보기

    Electric works for the Mokpo-Jangheung section of National expressway No. 10 (section 3)

    Period
    2010.12~2012.03
    Scale
    ■ Total length 13.78Km ■ Electric work for exits: 1 location [Jangheung exit] ■ CCTV street lamp electric work: 1 location ■ Electric work for tunnels: 6 locations [Gangjin 1 tunnel, Gangjin 2 tunnel, Gangjin 3 tunnel, Jangheung 1 tunnel, Jangheung 2 tunnel, Jangheung 3 tunnel] ■ Electric work for offices: 1 location [Jangheung office] ■ Electric work for temporary service areas: 1 location [Jangheung temporary service area]
    더보기

    Busan new port truck service area construction

    Period
    2010.11~2011.10
    Scale
    Service area bldg. (4 floors above ground), gas station bldg. (2 floors above ground), car wash bldg. (1 floor above ground), repair shop bldg. (2 floors above ground), waste water treatment bldg. (1 floor above ground) Total area: 7,802m2
    더보기
  • Samcheok Phase 2 production bases 5-7 storage tanks and ancillary facilities construction

    Order
    Korea Gas Corporation
    Period
    2010.11~2015.12
    Scale
    - LNG Tank (20 10 000 M3 x 3 groups) -780 Ton / HR Process & Utility Equipment Related vaporization sent troops construction equipment - Our Ownership : 10%
    Perform Form
    C

    Yeoksam-dong K-Office construction

    Period
    2010.11~2012.12
    Scale
    5 floors below ground /19 floors above ground Total area: 15,380.6m2
    더보기

    South Daejeon truck stop

    Period
    2010.11~2011.07
    Scale
    Management bldg., maintenance bldg. (trucks and passenger cars), automatic car wash, LNG refueling station (office bldg.), gas station bldg. Total area: 2,639.03m2
    더보기
  • The tool Highway Route 30 (Sangju-Yeongdeok) Between construction

    Order
    Korea Highway Corporation
    Period
    2010.07~2016.12
    Scale
    - Extended 4.34km - Bridge three places (0.945㎞) - Tunnel 2 points (2.969㎞)
    더보기

    Suwon SK Sky VIEW

    Period
    2010.06~2013.05
    Scale
    *Residential facilities: 25-pyeong (708 units), 35-pyeong (1,769 units), 39-pyeong (296 units), 45-pyeong (403 units), 49-pyeong (165 units), 52-pyeong (147 units), 55~58-pyeong (10 units) *Service facilities: superintendent’s office, senior citizen center, common facilities, multi-purpose room, child daycare facilities, library, MDF/disaster-prevention room, etc. *playground/sports facilities: gym, children’s playground, rest areas *bldg. mechanical and electrical facilities/parking lot and various public amenities Total area: 595,209.55m2
    더보기

    Construction of the Handball Stadium

    Period
    2010.06~2011.10
    Scale
    3 floors above ground, one floor below ground, seats : 5,000 in total ■ Remodeling of the Olympic Park Fencing Stadium into a Handball Stadium - 1st construction: 17,336.76㎡ - 2nd construction: 1,952.28㎡
    더보기

Daegu Line East Daegu and Youngchun roadbed double-track first tool, a Corporation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do ~ Dong-gu, Daegu, Korea
· Order Korea Rail Network Authority
· Period 2011.02~2016.12
· Scale [ Total length : 9.45km] - Earthwork : 2.68km - Bridge : 4.51km (5 places) - Station : 2.26km (2 places) - Temporary Line : 0.66km (1 point)

Wasit Gas EPC (On-going)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Saudi Arabia
· Work Scope Turn-key
· Order ARAMCO
· Period 2011.02~2014.03
· Perform Form EPC LSTK

Wasit #1,3,4 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Saudi Arabia
· Order ARAMCO
· Period 2011.02~2015.12
· Perform Form EPC

Pangyo Sanun Apelbaum construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 944, Unjung-dong, Bundang-gu, Seongnam, Gyeonggi-do
· Period 2011.01~2012.07
· Scale 1 floor below ground, 2 floors above ground, 34 block-type free-standing houses + 1 common facility buildings Maximum height 10.4M Total area: 17,861.4m2

Electric works for the Mokpo-Jangheung section of National expressway No. 10 (section 3)

The Business Performance details view. can you check Work Scope, Order, Period
· Location (529-811) Buchun-ri, Busan-myeon, Jangheung-gun, Southern Jeolla Province
· Period 2010.12~2012.03
· Scale ■ Total length 13.78Km ■ Electric work for exits: 1 location [Jangheung exit] ■ CCTV street lamp electric work: 1 location ■ Electric work for tunnels: 6 locations [Gangjin 1 tunnel, Gangjin 2 tunnel, Gangjin 3 tunnel, Jangheung 1 tunnel, Jangheung 2 tunnel, Jangheung 3 tunnel] ■ Electric work for offices: 1 location [Jangheung office] ■ Electric work for temporary service areas: 1 location [Jangheung temporary service area]

Busan new port truck service area construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 498, Gaman-1-dong, Nam-gu, Busan
· Period 2010.11~2011.10
· Scale Service area bldg. (4 floors above ground), gas station bldg. (2 floors above ground), car wash bldg. (1 floor above ground), repair shop bldg. (2 floors above ground), waste water treatment bldg. (1 floor above ground) Total area: 7,802m2

Samcheok Phase 2 production bases 5-7 storage tanks and ancillary facilities construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Samcheok-si, Gangwon-do, Korea
· Order Korea Gas Corporation
· Period 2010.11~2015.12
· Scale - LNG Tank (20 10 000 M3 x 3 groups) -780 Ton / HR Process & Utility Equipment Related vaporization sent troops construction equipment - Our Ownership : 10%
· Perform Form C

Yeoksam-dong K-Office construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 678-39, Yeoksam-dong, Gangnam-gu, Seoul and 3 lots
· Period 2010.11~2012.12
· Scale 5 floors below ground /19 floors above ground Total area: 15,380.6m2

South Daejeon truck stop

The Business Performance details view. can you check Work Scope, Order, Period
· Location (300-300) 313-5, Guro-dong, Dong-gu, Daejeon
· Period 2010.11~2011.07
· Scale Management bldg., maintenance bldg. (trucks and passenger cars), automatic car wash, LNG refueling station (office bldg.), gas station bldg. Total area: 2,639.03m2

The tool Highway Route 30 (Sangju-Yeongdeok) Between construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Dalsan-myeon, Yeongdeok-gun, Gyeongsangbuk-do, Korea
· Order Korea Highway Corporation
· Period 2010.07~2016.12
· Scale - Extended 4.34km - Bridge three places (0.945㎞) - Tunnel 2 points (2.969㎞)

Suwon SK Sky VIEW

The Business Performance details view. can you check Work Scope, Order, Period
· Location 600-2, Jeongja-dong, Jangan-gu, Suwon, Gyeonggi-do
· Period 2010.06~2013.05
· Scale *Residential facilities: 25-pyeong (708 units), 35-pyeong (1,769 units), 39-pyeong (296 units), 45-pyeong (403 units), 49-pyeong (165 units), 52-pyeong (147 units), 55~58-pyeong (10 units) *Service facilities: superintendent’s office, senior citizen center, common facilities, multi-purpose room, child daycare facilities, library, MDF/disaster-prevention room, etc. *playground/sports facilities: gym, children’s playground, rest areas *bldg. mechanical and electrical facilities/parking lot and various public amenities Total area: 595,209.55m2

Construction of the Handball Stadium

The Business Performance details view. can you check Work Scope, Order, Period
· Location Fencing Stadium at 88-2, Bangi-dong, Songpa-gu, Seoul
· Period 2010.06~2011.10
· Scale 3 floors above ground, one floor below ground, seats : 5,000 in total ■ Remodeling of the Olympic Park Fencing Stadium into a Handball Stadium - 1st construction: 17,336.76㎡ - 2nd construction: 1,952.28㎡