본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Suwon Gwanggyo Apartment construction A10 block (section 7)

    Period
    2011.04~2013.09
    Scale
    13 buildings (10 & 26 stories), 701 units total Total area: 111,262.69m2
    더보기

    Singapore DTL3 C930 Project

    Order
    Land Transport Authority (LTA)
    Period
    2011.04~2016.12
    Scale
    - TBM Tunnel: 940 m (2Lines) - Cut & Cover Tunnel: 39m - Station 1 location: 148m
    더보기

    Construction of the 2nd phase facilities of the 2nd Osan Runway

    Order
    Defense Installation Agency
    Period
    2011.04~2013.09
    Scale
    - 2nd runway 2,743m, taxiway 470m - Rainwater pipes and culverts 10,146m - Water supply and drainage pipes 6,957m - Patriot/Vulcan cannon command post, accommodations and 33 buildings, Total area3,782㎡ - Flood control pump and air-conditioning, sanitary facilities - Electrical, communication and fire-fighting facilities
    더보기
  • Construction of counter facilities to improve the calmness of Gamcheon Port

    Order
    Busan Port Construction Office, Busan Regional Maritime Affairs and Port Office
    Period
    2011.03~2013.09
    Scale
    - South breakwater (new): L=350m - Training dike (new): L=240m - Reinforcement of the existing East-West breakwater - Other appurtenant work
    더보기

    Gimcheon Community Energy Project

    Order
    Gimcheon Energy Co., Ltd
    Period
    2011.03~2013.07
    Scale
    * Power Bolier : 330t/h - Manufacturer : Hyundai HIC - Type : Circulating Fluidized-Bed * STG : 59MW x 1 (Siemens)
    더보기

    Daegu Line East Daegu and Youngchun roadbed double-track first tool, a Corporation

    Order
    Korea Rail Network Authority
    Period
    2011.02~2016.12
    Scale
    [ Total length : 9.45km] - Earthwork : 2.68km - Bridge : 4.51km (5 places) - Station : 2.26km (2 places) - Temporary Line : 0.66km (1 point)
    더보기
  • Wasit Gas EPC (On-going)

    Work Scope
    Turn-key
    Order
    ARAMCO
    Period
    2011.02~2014.03
    Perform Form
    EPC LSTK

    Wasit #1,3,4 Project

    Order
    ARAMCO
    Period
    2011.02~2015.12
    Perform Form
    EPC

    Pangyo Sanun Apelbaum construction

    Period
    2011.01~2012.07
    Scale
    1 floor below ground, 2 floors above ground, 34 block-type free-standing houses + 1 common facility buildings Maximum height 10.4M Total area: 17,861.4m2
    더보기
  • Electric works for the Mokpo-Jangheung section of National expressway No. 10 (section 3)

    Period
    2010.12~2012.03
    Scale
    ■ Total length 13.78Km ■ Electric work for exits: 1 location [Jangheung exit] ■ CCTV street lamp electric work: 1 location ■ Electric work for tunnels: 6 locations [Gangjin 1 tunnel, Gangjin 2 tunnel, Gangjin 3 tunnel, Jangheung 1 tunnel, Jangheung 2 tunnel, Jangheung 3 tunnel] ■ Electric work for offices: 1 location [Jangheung office] ■ Electric work for temporary service areas: 1 location [Jangheung temporary service area]
    더보기

    Busan new port truck service area construction

    Period
    2010.11~2011.10
    Scale
    Service area bldg. (4 floors above ground), gas station bldg. (2 floors above ground), car wash bldg. (1 floor above ground), repair shop bldg. (2 floors above ground), waste water treatment bldg. (1 floor above ground) Total area: 7,802m2
    더보기

    Samcheok Phase 2 production bases 5-7 storage tanks and ancillary facilities construction

    Order
    Korea Gas Corporation
    Period
    2010.11~2015.12
    Scale
    - LNG Tank (20 10 000 M3 x 3 groups) -780 Ton / HR Process & Utility Equipment Related vaporization sent troops construction equipment - Our Ownership : 10%
    Perform Form
    C

Suwon Gwanggyo Apartment construction A10 block (section 7)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Location 156, Yieui-dong, Yeongtong-gu, Suwon, Gyeonggi-do
· Period 2011.04~2013.09
· Scale 13 buildings (10 & 26 stories), 701 units total Total area: 111,262.69m2

Singapore DTL3 C930 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 40A Ubi Avenue 2, Singapore 408900
· Order Land Transport Authority (LTA)
· Period 2011.04~2016.12
· Scale - TBM Tunnel: 940 m (2Lines) - Cut & Cover Tunnel: 39m - Station 1 location: 148m

Construction of the 2nd phase facilities of the 2nd Osan Runway

The Business Performance details view. can you check Work Scope, Order, Period
· Location 700, Jeokbong-ri, Seotan-myeon, Pyeongtaek, Gyeonggi Province
· Order Defense Installation Agency
· Period 2011.04~2013.09
· Scale - 2nd runway 2,743m, taxiway 470m - Rainwater pipes and culverts 10,146m - Water supply and drainage pipes 6,957m - Patriot/Vulcan cannon command post, accommodations and 33 buildings, Total area3,782㎡ - Flood control pump and air-conditioning, sanitary facilities - Electrical, communication and fire-fighting facilities

Construction of counter facilities to improve the calmness of Gamcheon Port

The Business Performance details view. can you check Work Scope, Order, Period
· Location SK E&C, 4th floor, 909-3, Dadae-dong, Saha-gu, Busan
· Order Busan Port Construction Office, Busan Regional Maritime Affairs and Port Office
· Period 2011.03~2013.09
· Scale - South breakwater (new): L=350m - Training dike (new): L=240m - Reinforcement of the existing East-West breakwater - Other appurtenant work

Gimcheon Community Energy Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Gimcheon, Korea
· Order Gimcheon Energy Co., Ltd
· Period 2011.03~2013.07
· Scale * Power Bolier : 330t/h - Manufacturer : Hyundai HIC - Type : Circulating Fluidized-Bed * STG : 59MW x 1 (Siemens)

Daegu Line East Daegu and Youngchun roadbed double-track first tool, a Corporation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do ~ Dong-gu, Daegu, Korea
· Order Korea Rail Network Authority
· Period 2011.02~2016.12
· Scale [ Total length : 9.45km] - Earthwork : 2.68km - Bridge : 4.51km (5 places) - Station : 2.26km (2 places) - Temporary Line : 0.66km (1 point)

Wasit Gas EPC (On-going)

The Business Performance details view. can you check Work Scope, Order, Period
· Location Saudi Arabia
· Work Scope Turn-key
· Order ARAMCO
· Period 2011.02~2014.03
· Perform Form EPC LSTK

Wasit #1,3,4 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Saudi Arabia
· Order ARAMCO
· Period 2011.02~2015.12
· Perform Form EPC

Pangyo Sanun Apelbaum construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 944, Unjung-dong, Bundang-gu, Seongnam, Gyeonggi-do
· Period 2011.01~2012.07
· Scale 1 floor below ground, 2 floors above ground, 34 block-type free-standing houses + 1 common facility buildings Maximum height 10.4M Total area: 17,861.4m2

Electric works for the Mokpo-Jangheung section of National expressway No. 10 (section 3)

The Business Performance details view. can you check Work Scope, Order, Period
· Location (529-811) Buchun-ri, Busan-myeon, Jangheung-gun, Southern Jeolla Province
· Period 2010.12~2012.03
· Scale ■ Total length 13.78Km ■ Electric work for exits: 1 location [Jangheung exit] ■ CCTV street lamp electric work: 1 location ■ Electric work for tunnels: 6 locations [Gangjin 1 tunnel, Gangjin 2 tunnel, Gangjin 3 tunnel, Jangheung 1 tunnel, Jangheung 2 tunnel, Jangheung 3 tunnel] ■ Electric work for offices: 1 location [Jangheung office] ■ Electric work for temporary service areas: 1 location [Jangheung temporary service area]

Busan new port truck service area construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location 498, Gaman-1-dong, Nam-gu, Busan
· Period 2010.11~2011.10
· Scale Service area bldg. (4 floors above ground), gas station bldg. (2 floors above ground), car wash bldg. (1 floor above ground), repair shop bldg. (2 floors above ground), waste water treatment bldg. (1 floor above ground) Total area: 7,802m2

Samcheok Phase 2 production bases 5-7 storage tanks and ancillary facilities construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Samcheok-si, Gangwon-do, Korea
· Order Korea Gas Corporation
· Period 2010.11~2015.12
· Scale - LNG Tank (20 10 000 M3 x 3 groups) -780 Ton / HR Process & Utility Equipment Related vaporization sent troops construction equipment - Our Ownership : 10%
· Perform Form C