본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • Turkey, 3rd Bosporus Bridge Project

    Order
    ICA Ictas-Astaldi JV
    Period
    2013.06~2016.11
    Scale
    1. The total length of 2,164m ( main span 1,408m), Bridge width 54.4m ( eight lane road + railway 2tracks) 2. A complex geometry pylons world's largest suspension bridge , president of the 322m high
    더보기

    Qatar, Doha Metro Red Line North Project

    DECC station

    Order
    Qatar Railways Company
    Period
    2013.06~2018.08
    Scale
    1. Twin TBM Tunnel (11.69km, TBM : 4대 ) 2. 6 Station (1.74km) 3. Trough Structure, Emergency Exit 2개소
    더보기

    Incheon SK Sky VIEW

    Period
    2013.05~2016.05
    Scale
    2 floors below ground, 40 floors above ground 3,971 units in 26 buildings Gross Area: 652,825.0758㎡
    더보기
  • Jeonju Hyoja SK Leaders VIEW

    Period
    2013.05~2016.02
    더보기

    Boryeong LNG Terminal Project

    Order
    Boryeong LNG Terminal Co., Ltd.
    Period
    2013.05~2019.06
    Scale
    [Level 1&2] -LNG Tank: 200,000 m3 x 4 group (Full Containment Type)
    Perform Form
    EPC
    더보기

    Seoul Forest SK V1 Tower

    Period
    2013.05~2014.07
    Scale
    Gross Area : 11,647 pyung, Land Area : 1,567 pyung 4 floors underground and 20 floors above the ground
    더보기
  • Saudi jajan refinery construction

    Order
    ARAMCO
    Period
    2013.04~
    Perform Form
    EPC

    Gajaeul New Town redevelopment 4th Zone

    Period
    2013.04~2015.11
    Scale
    3floors below ground, 33floors above ground 4,300 units Gross Area: 712,921.383㎡

    Turkey, Eurasia Tunnel Project

    Order
    ATAS
    Period
    2013.04~2017.03
    Scale
    1. The total length of 14.6 km 2. TBM Tunnel 3.3 km / NATM Tunnel 1.9 km
    더보기
  • Taean 9,10 Thermal Unit Mechatronics Corporation

    Order
    Korea Western Power
    Period
    2013.03~2017.04
    Commercialization
    No. 9 : 2016-09-30 No. 10 : 2017-04-30
    Scale
    1,050MW X 2 groups
    Perform Form
    Construction
    더보기

    Bujeon~Masan double track electrification private capital project

    Order
    Smart Rail
    Period
    2013.02~2019.01
    Scale
    Earthwork: 11.5km Bridges: 6.1km (West Nakdong River Bridge, Joman Bridge, Gwandong Bridge, Sinwol Bridge, etc.) Tunnels: 13.0km (Shield 2.7km, NATM 10.3km) (Shield Nakdong Tunnel) (NATM ? Gaehwa Tunnel, Geumbyeong Tunnel, Yuha Tunnel) Stations: 5 (Bujeon, Sasang, Gimhae Airport, Garak IC and Jangyu) Signal boxes: 2 (Chilsan Signal Box, Jinrye Signal Box)

    PDH(Propane Dehydrogenation) Project

    Order
    SK Advanced
    Period
    2013.01~2016.02
    Scale
    Plottage 32,000py Capacity: 600 KTPA (Propylene production standards )
    Perform Form
    EPC
    더보기

Turkey, 3rd Bosporus Bridge Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location oyrazkoy 3rd bosphorus bridge construction site inside military zone, Beykoz, Istanbul (Asian Side)
· Order ICA Ictas-Astaldi JV
· Period 2013.06~2016.11
· Scale 1. The total length of 2,164m ( main span 1,408m), Bridge width 54.4m ( eight lane road + railway 2tracks) 2. A complex geometry pylons world's largest suspension bridge , president of the 322m high

Qatar, Doha Metro Red Line North Project

  • DECC station
  • Qassar Station
The Business Performance details view. can you check Work Scope, Order, Period
· Location Al Mara Business Tower, Suhaim Bin Hamad Street
· Order Qatar Railways Company
· Period 2013.06~2018.08
· Scale 1. Twin TBM Tunnel (11.69km, TBM : 4대 ) 2. 6 Station (1.74km) 3. Trough Structure, Emergency Exit 2개소

Incheon SK Sky VIEW

The Business Performance details view. can you check Work Scope, Order, Period
· Location Yonghyeon Hak Ik area 2-1 block, Incheon, Korea
· Period 2013.05~2016.05
· Scale 2 floors below ground, 40 floors above ground 3,971 units in 26 buildings Gross Area: 652,825.0758㎡

Jeonju Hyoja SK Leaders VIEW

The Business Performance details view. can you check Work Scope, Order, Period
· Period 2013.05~2016.02

Boryeong LNG Terminal Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Boryeong-si, Chungcheongnam-do, Korea
· Order Boryeong LNG Terminal Co., Ltd.
· Period 2013.05~2019.06
· Scale [Level 1&2] -LNG Tank: 200,000 m3 x 4 group (Full Containment Type)
· Perform Form EPC

Seoul Forest SK V1 Tower

The Business Performance details view. can you check Work Scope, Order, Period
· Location 284-55, Seongsu-dong 2(i)-ga, Seongdong-gu, Seoul, Korea
· Period 2013.05~2014.07
· Scale Gross Area : 11,647 pyung, Land Area : 1,567 pyung 4 floors underground and 20 floors above the ground

Saudi jajan refinery construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Saudi Arabia
· Order ARAMCO
· Period 2013.04~
· Perform Form EPC

Gajaeul New Town redevelopment 4th Zone

The Business Performance details view. can you check Work Scope, Order, Period
· Location 124, Namgajwa-dong, Seodaemun-gu, Seoul, Korea
· Period 2013.04~2015.11
· Scale 3floors below ground, 33floors above ground 4,300 units Gross Area: 712,921.383㎡

Turkey, Eurasia Tunnel Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Burhan Felek Caddesi, 1. Cevreyolu Sokak, 34668 Haydarpa?a, Uskudar / ?stanbul
· Order ATAS
· Period 2013.04~2017.03
· Scale 1. The total length of 14.6 km 2. TBM Tunnel 3.3 km / NATM Tunnel 1.9 km

Taean 9,10 Thermal Unit Mechatronics Corporation

The Business Performance details view. can you check Work Scope, Order, Period
· Location Taean-gun, Chungcheongnam-do, Korea
· Order Korea Western Power
· Period 2013.03~2017.04
· Commercialization No. 9 : 2016-09-30 No. 10 : 2017-04-30
· Scale 1,050MW X 2 groups
· Perform Form Construction

Bujeon~Masan double track electrification private capital project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Bucheon-dong, Busanjin-gu ~ Jinrye-myeon, Gimhae, Southern Gyeongsang-do
· Order Smart Rail
· Period 2013.02~2019.01
· Scale Earthwork: 11.5km Bridges: 6.1km (West Nakdong River Bridge, Joman Bridge, Gwandong Bridge, Sinwol Bridge, etc.) Tunnels: 13.0km (Shield 2.7km, NATM 10.3km) (Shield Nakdong Tunnel) (NATM ? Gaehwa Tunnel, Geumbyeong Tunnel, Yuha Tunnel) Stations: 5 (Bujeon, Sasang, Gimhae Airport, Garak IC and Jangyu) Signal boxes: 2 (Chilsan Signal Box, Jinrye Signal Box)

PDH(Propane Dehydrogenation) Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Ulsan-si, Korea
· Order SK Advanced
· Period 2013.01~2016.02
· Scale Plottage 32,000py Capacity: 600 KTPA (Propylene production standards )
· Perform Form EPC