본문 바로가기 주 메뉴 바로가기

We Build the Great Great Life, Great World

BUSINESS Business Performance

  • S1 Project

    Order
    Etec E&C
    Period
    2021.02~2018.05
    Scale
    100MW X 2EA (Biomass)
    Perform Form
    EPC

    Seoul Fuel Cell Project

    Order
    Korea Midland power (KOMICO)
    Period
    2018.12~2019.12
    Scale
    6 MW
    Perform Form
    EPC

    LSPC Package A PJT

    Order
    LSP (Longson Petrochemicals Co. Ltd)
    Period
    2018.09~2023.02
    Scale
    Site Area : 27.8 ha (278,000 m2) Capacity : 950 KTPA (Ethylene)
    Perform Form
    LEPCC LSTK
    더보기
  • Osung Refrigerating Store Fuel Cell Project

    Osung Refrigerating Store

    Order
    SPC
    Period
    2018.07~2019.06
    Scale
    9.68MW
    Perform Form
    IPP Sponsor + EPC
    더보기

    M Project(Plant)

    Order
    ADNOC
    Period
    2017.11~2022.07
    Scale
    Underground oil storage facilities 42 MMbbl (by Infra) Surface Facilities & Pipeline 42”, 4x2.6Km (by Plant)
    Perform Form
    EPC

    Yesan New Material Complex Development Project

    Yesan New Material Complex Development Project

    Order
    Yesan New Material Complex Development Co.,ltd
    Period
    2016.12~2017.02
    Scale
    - Earthwork : cut 996,068㎥, embankment 841,760㎥ - Rainy work(D450~D1500) : L=4,054m - Sewage work(D300) : L=2,595m - Waterworks construction(D100) : L=3,459m - Paving work : 56,200㎡ - Landscape work : park and greenery construction - electric work, etc
    더보기
  • Hwaseong-Jeongnam Industrial Complex Development Project

    Order
    Hwaseong Jeongnam general industrial complex
    Period
    2016.07~2018.06
    Scale
    [ 17 pyeong industrial complex ] - Earthwork : 1,200,000㎥ - Constant ball : L = 3,634m - Excellent ball : L = 4,738m - Sewage ball : L = 4,515m - Ball Packaging : 59,069㎡ - Landscaping , street lighting and traffic light one way
    더보기

    LiBS 10,11 PROJECT

    LiBS10,11 PROJECT

    Order
    SK Innovation
    Period
    2016.05~2018.03
    Scale
    Area : 10,450m2 Facilities : LiBS (Lithium-ion Battery Separator)
    Perform Form
    EPC
    더보기

    USA Magnolia LNG project

    Order
    Magnolia LNG
    Period
    2016.03~2020.03
    Perform Form
    EPC
    더보기
  • Thailand IRPC refinery construction

    Order
    IRPC
    Period
    2016.03~2016.08
    Perform Form
    EPC

    SK HYNIX HF WWT Project

    Order
    SK Hynix
    Period
    2016.01~2016.09
    Scale
    Chungju campus three wastewater treatment market extension work Construction area : 568.9M2, total floor area : 612.98M2
    Perform Form
    E/C
    더보기

    Ulsan reserve base underground structure construction

    Order
    Korea National Oil Corporation
    Period
    2016.01~2020.12
    Scale
    - Civil : 1,030 million barrels of crude oil storage ( excavation volume : 189 million ㎥) - Mechanical : Oil / effusion can peomgak 8 , Fire / integer / non- waste - Electricity: process control equipment, measuring equipment outside the cave yuwi - Construction: haengjeongdong 13 buildings and support facilities - Parks and green space construction type 1
    더보기

S1 Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 96, Gunsansandan-ro, Gunsan-si, Jeollabuk-do, Republic of Korea
· Order Etec E&C
· Period 2021.02~2018.05
· Scale 100MW X 2EA (Biomass)
· Perform Form EPC

Seoul Fuel Cell Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location 49, Dongmak-ro 8-gil, Mapo-gu, Seoul, Republic of Korea
· Order Korea Midland power (KOMICO)
· Period 2018.12~2019.12
· Scale 6 MW
· Perform Form EPC

LSPC Package A PJT

The Business Performance details view. can you check Work Scope, Order, Period
· Location Vietnam, Longson Island
· Order LSP (Longson Petrochemicals Co. Ltd)
· Period 2018.09~2023.02
· Scale Site Area : 27.8 ha (278,000 m2) Capacity : 950 KTPA (Ethylene)
· Perform Form LEPCC LSTK

Osung Refrigerating Store Fuel Cell Project

  • Osung Refrigerating Store
  • Osung Refrigerating Store
The Business Performance details view. can you check Work Scope, Order, Period
· Order SPC
· Period 2018.07~2019.06
· Scale 9.68MW
· Perform Form IPP Sponsor + EPC

M Project(Plant)

The Business Performance details view. can you check Work Scope, Order, Period
· Location UAE
· Order ADNOC
· Period 2017.11~2022.07
· Scale Underground oil storage facilities 42 MMbbl (by Infra) Surface Facilities & Pipeline 42”, 4x2.6Km (by Plant)
· Perform Form EPC

Yesan New Material Complex Development Project

  • Yesan New Material Complex Development Project
The Business Performance details view. can you check Work Scope, Order, Period
· Order Yesan New Material Complex Development Co.,ltd
· Period 2016.12~2017.02
· Scale - Earthwork : cut 996,068㎥, embankment 841,760㎥ - Rainy work(D450~D1500) : L=4,054m - Sewage work(D300) : L=2,595m - Waterworks construction(D100) : L=3,459m - Paving work : 56,200㎡ - Landscape work : park and greenery construction - electric work, etc

Hwaseong-Jeongnam Industrial Complex Development Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Jeongnam-myeon, Hwaseong-si, Gyeonggi-do, Korea
· Order Hwaseong Jeongnam general industrial complex
· Period 2016.07~2018.06
· Scale [ 17 pyeong industrial complex ] - Earthwork : 1,200,000㎥ - Constant ball : L = 3,634m - Excellent ball : L = 4,738m - Sewage ball : L = 4,515m - Ball Packaging : 59,069㎡ - Landscaping , street lighting and traffic light one way

LiBS 10,11 PROJECT

  • LiBS10,11 PROJECT
The Business Performance details view. can you check Work Scope, Order, Period
· Location Jeungpyeong-gun, Korea
· Order SK Innovation
· Period 2016.05~2018.03
· Scale Area : 10,450m2 Facilities : LiBS (Lithium-ion Battery Separator)
· Perform Form EPC

USA Magnolia LNG project

The Business Performance details view. can you check Work Scope, Order, Period
· Order Magnolia LNG
· Period 2016.03~2020.03
· Perform Form EPC

Thailand IRPC refinery construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Thailand
· Order IRPC
· Period 2016.03~2016.08
· Perform Form EPC

SK HYNIX HF WWT Project

The Business Performance details view. can you check Work Scope, Order, Period
· Location Cheongju-si, Chungcheongbuk-do, Korea
· Order SK Hynix
· Period 2016.01~2016.09
· Scale Chungju campus three wastewater treatment market extension work Construction area : 568.9M2, total floor area : 612.98M2
· Perform Form E/C

Ulsan reserve base underground structure construction

The Business Performance details view. can you check Work Scope, Order, Period
· Location Hangnam-ri, Onsan-eup, Ulju-gun, Ulsan, Korea
· Order Korea National Oil Corporation
· Period 2016.01~2020.12
· Scale - Civil : 1,030 million barrels of crude oil storage ( excavation volume : 189 million ㎥) - Mechanical : Oil / effusion can peomgak 8 , Fire / integer / non- waste - Electricity: process control equipment, measuring equipment outside the cave yuwi - Construction: haengjeongdong 13 buildings and support facilities - Parks and green space construction type 1